HomeMy WebLinkAboutConditions of PermitCOND ITIONS OF P ERMIT
BLRE-01-25-9060
COWHEY FAMILY TRUST
New Single-family dwelling w/ attached garage & unfinished basement
227 Silver Mountain Dr, GWS
lronbridge PUD, Lot 1 1B - 2395124181 1 B
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)AND 201B
I NTERNATIONAL EN ERGY CONSERVATION CODE ( I.E.C.C,)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY,
4) ALL EXTERIOR LIGHTING TO BE DOWNCASTAND SHIELDED.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL I NFORMATION.
6) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTTNG INSPECTION AND PRIOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
3,000 PSF soil bearing. lnclude compaction report for any structural fill.
7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERING FOR BUILDING INSPECTOR AT TIME OF
FRAME INSPECTION.
8) BLOWER DOOR TEST tS REOUtRED. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD
COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL.
9) A LOT TMPROVEMENT CERT|FtCATE, SEALED BY A COLORADO LICENSED SURVEYOR, lS REOUIRED AT
FOUNDATION INSPECTION TO VERIFY STRUCTURE IS IN COMPLIANCE WITH MINIMUM SETBACK
REOUIREMENTS / BUILDING ENVELOPE.
10) AN ELEVATTON SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, lS
REOUIRED AT FRAME INSPECTION TO VERIFY THAT AS.BUILT ROOFS COMPLY WITH GARFIELD
COUNTY'S 35-FOOT BUILDING HEIGHT LIMIT IN THE IRONBRIDGE PUD.
1 1) PLUMBING / BUILDING CONTRACTOR SEE C1 SITE PLAN GARAGE REFERENCE FOR SANITARY SEWER
CONNECTION: INSTALL GRINDER EJECTION PUMP. FIELD VERIFY.
12) SIP MANUFACTURERS SHOP DRAWINGS MUST BE ON SITE AT FRAME INSPECTION. GENERAL
CONTRACTOR AND MEP SUB CONTRACTORS ARE RECOMMENDED TO FULLY REVIEW SIP 600 FOR
ALLOWABLE'CUTS'AND 'DRILLING' PURSUANT TO SIPS MANUFACTURER SPECIFICATIONS. SIPS
PREMIER ICC - ES REPORT IS FURTHER ATTACHED TO FIELD SET - OWNER BUILDER AND
CONTRACTORS TO ENSURE GARAGE / HOUSE FIRE SEPARATION IS COMPLETED PURSUANT TO SIP'S
MANUFACTURER'S LISTED SPECI FICATIONS.
13) PRESCR|pTtVE PATH USTNG 2018 rECC TABLE R402.1.2 lS CHOSEN FOR ENERGY COMPLIANCE OF
THIS HOME. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE
WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE M1507.3.3(1 )AND
(2)SHOWN ON COVER SHEET.
$
.{
la
$\
N