HomeMy WebLinkAboutConditions of PermitcoNDlflo NS OF PERMIT
BLCO-04-25-9186
BRETTLEBERG CON DO ASSOCIATION
DECK AND PATIO REMODEL
1 1 101 COUNTY ROAD 1 17
1) SOME ACCESSTBLE AMENTTTES ARE NOT lN THE SCOPE OF THE WORK, AS 20% OF
THE VALUATION IS NOT ENOUGH TO PURCHACE THE LIFTS. FUTURE WORK ON
THE CONDOS WILL BE EVALUATED TO SUPPLY THE LIFTS.
2) THE APPROVED PLANS ARE TO BE ON-SITE FOR INSPECTIONS.
3) SAN|TARY FACILITIES ARE REOUIRED TO BE PROVIDED FOR WORKERS.
4) A L|ST OF REOUTRED TNSPECTTONS W|LL BE ATTACHED TO THE PLANS. THE STATE
IS TO PERMIT AND APPROVE THE ELECTRICAL WORK.
RMITS
5) UNDERGROUND UTtLtTy LOCATES rS THE RESPONSIBILITY OF THE OWNER OR
CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE.
6) NORTHWEST COLORADO COUNCTL OF GOVERNMENTS (NWCCOG)PERMITS AND
PERFORMS INSPECTIONS ON ELEVATORS AND LIFTS. WHEN THE LIFTS ARE
INSTALLED, ALL INSPECTIONS WILL NEED TO BE PERFORMED AND APPROVED BY
NWCCOG PRIOR TO ANY OCCUPANCY OF THE BUILDING. I HAVE ATTACHED A
HANDOUT FROM NWCCOG FOR YOUR REFERENCE.
7) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD
INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458.
PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN
DOCUMENTATION OF THE INSPECTIONS.
B) GEOTECHNICAL OBSERVATION lS REOUIRED WHEN THE EXCAVATION lS
COMPLETE AND WRITTEN VERIFICATION BE SUPPLIED AT FOOTING INSPECTION,
3000PSF.
9) ALL EXTERIOR LIGHTING lS TO BE DOWNCAST AND SHIELDED.
1O)SAFETY GLAZING IS NOT DESIGNATED ON THE PLANS. SAFETY GLAZING WILL BE
cHECKED DURING THE FRAMING AND FINAL INSPECTION. (lBC 2406.4)
1 1)ALL ACCESSIBLE DOOR AND GATE HARDWARE SHALL HAVE A SHAPE THAT IS
EASY TO GRtp, |NCLUD|NG POCKET AND SLIDTNG DOORS. (ANSI A117,1 - 404.2.6)
N)THE HOT TUBE IS TO HAVE A LOCABLE COVER OR THE FENCE AND GATE WILL
NEED TO COMPLY WITH THE 2015 INTERNATIONAL POOL AND SPA CODE.
13)THE ELECTRICAL DRAWINGS DO NOT INCLUDE THE TWO FUTURE LIFTS. PLEASE
HAVE THE ELECTRICAL CONTRACTOR ADD THE ROUGH-IN'S FOR THE LIFTS.
14)THE SHOP DRAWINGS FOR THE STAIRS ARE TO BE SUBMITTED FOR REVIEW.
HANDRAILS ARE REQUIRED ON BOTH SIDES AND HANDRAIL EXTENSIONS AT THE
TOP AND BOTTOM ARE REOUIRED.
15)THERE IS TO BE A METHOD OF PROVIDING ACCESSIBLIW INTO THE HOTTUB AND
COLD PLUNGE. TYPICALLY, A SLEEVE IS INSTALLED IN THE CONCRETE NEXT TO
THE AMENITIES TO NCCOMMODNTE N REMOVABLE LIFT OR N ROLLING LIFT IS TO
BE AVAILABLE.
16)THE EXTERIOR SHOWER IS TO BE PROVIDED WITH A METHOD OF PREVENTING
FREEZING OR BE DRAINED DOWN IN THE WINTER.
17)A SANTTARY DRAIN tS REOUTRED FOR THE OUTSTDE SHOWER.