April2,2025 Project No. :25.003.ASP
Aspen Foundation Repair
PO Box 1913
Rifle, Colorado 81650
RE: Foundation Repair- 193 Buds Way, Parachute, Colorado
PROJECT BACKGROUND
We understand the structure is a commercial building and the owner wishes to stabilize a portion of
the foundation. lt is our understanding (12) 2718inch diameter push piers have been recommended
by the contractor to provide additional foundation support. A recent field sketch (attached) indicates
the proposed locations of repair.
lmage 1: Front Elevation
861-E N Dean Road
Auburn, AL 36830
P: 360.566.7343
STRUCTU RAL CALCULATIONS
PREPARED FOR
ASPEN FOUNDATION REPAIR
FOR
HAYDEN INVESTMENTS STRUCTURE
FOUNDATION REPAIR
193 BUDS WAY
PARACHUTE, COLORADO
PROJECT NUMBER: 25.003.ASP
DATE: APril2,2O25
PROJECT MANAGER: Daniel Stark, P.E.
by Daniel
ON: C=U8,
E=slaild@sla#dn.com,
Da n i el Sta rk 3;1gg;-gXXXX'ir'"
CN=Danl€t Sla*
Dab:2025-04.04
15120:50-05'00'
54100
CONTRACTOR.PROVI DED FI ELD SKETCH
#&:
t,-
Ftr.,. *..a.t ry
lrtu,,-&
€--
Ut
of
"l
*'tr1.i*
^,-f,t4s.-L'F>\n
{r
f
t .'A r'\r}tclgr'a,tVEdrLsq
.[, E
oitl\nF-.11 t
{*^oh
0
bF
u,trl,
a
I*
Zr
vCI
qp
1
,
I
-1q.
6
GEOLOGIC SETTING
The existing structure is located in Parachute, Colorado. Based on the information provided by the
USDA Web Soil Survey, the general site condition in the area is comprised of silty loam and the site is
relatively flat.
SUMMARY
Based on our scope of work, determing the design load on the piers, the ultimate load requirement for
the push piers is 28000 lbs. We recommend the piers with a 2718 inch shaft be installed to a
minimum installation pressure of 3000 psi, or refusal, using a 9.62 square inch hydraulic ram.
Regards,?)JU
DanielStark, P.E.
Stark Foundations
Ch. 13.60 lnternational Residential Code I Parachute Municipal Code PageT of 11
"National Housing construction and safety standards Act of 1 974," 42 U.S.C. 5401 et seq., as amended,
and bearing the H.U.D, identification label. lnstalled and set up as required in the set up manual supplied
with the manufactured home, and pursuant to the MHIP Handbook as adopted by the State of Colorado,
Division of Housing.
Person, A natural person or individual, partnership, corporation, association, company or other public or
corporate body, including the federal government, and includes any political subdivision, agency,
instrumentaligl, or corporation of the United States government. Singular includes plural, male includes
female.
Usable Space under Floors. Usable space is that space under the first story between the underside of the
floor joists or floor truss and the ground below which exceeds forty-six inches (46") at any point.
T. Toble R301.2(7). The following information has been provided to complete Table R301 .2(1):
Ground Snow Load: 30 psf
Wind Speed: 115 MPH Ultimate Exposure C See Section R301.2.1.4
Seismic Design Category: B
Weathering Probability for Concrete: Severe
Frost Line Depth: 24 inches
Termite lnfestation Probability: None to Slight
Decay Probability: None to Slight
Winter Design Temperature: Minus 2 degrees (all temperatures are shown as Fahrenheit)
Summer Cooling Design Temperature: 87 degrees
lndoor Design Temperature: 70 degrees for heating; 75 degrees for cooling.
Heating Temperature Difference: 72 degrees
Cooling Temperature Difference: 12 degrees
Winter Humidity: 30026
Summer Humidity: 5070
lce Shield Underlayment Required: Yes
The Parachute Municipal Code is currentthrough Ordinance 821, passedJanuary 16,2025
Foundation Repair
193 Buds Way
Parachute, Colorado
Fo
UJaoE
o-
Date: 2-Apr-25
Designed by: SHA
l.roject No,: 25,003,A$F
n Griteria
Code(s)
Design Loads:
Dead:
Roof =
ChimneY =
Third Floor =
Second Floor =
First Floor (4" Conc. Slab) =
Walls =
8" Foundation Wall =
Soil=
Live:
Roof (Snow) =
Roof Live Load =
Third Floor =
Second Floor =
First Floor (4" Conc. Slab) =
lnternational Building Code (lBC) 2021
lnternational Residential Code (lRC) 2018
ASCE 7-16
15 psf
45 psf
15 psf
15 psf
50 psf
12 psf
100 psf
110 psf
AN
40
100
30
Soil:
Allow Lateral Bearing Pressure =
Active Pressure =
100
60
psf/ft
psf/ft
psf
psf
psf
psf
psf
Wind: (not applicable)
ExPosure = Q
Wind Speed, V = 115 mph
GustFactor,G= 0.85
lnt. Pressure Coefficient, GCpi= -0.18
Ext. Pressure Coefficient, Cp = 0.8
Design Wind Pressure
where
Therefore:
9r=
Pt=
Factored Wind Pressur€, p'* =
Risk Category = ll
Krt= 1
Ko = 0.85
lG= 1
Height, h, = 30 ft
Design Load Combo = D + 0.6W
pw= g, (GCp- GCo) ul = 0.6
g, = 0.00256|G &, KoV'
28.8 psf
24.7 psf
14.8 psf (say 15 psf)
1
DESIGN CRITERIA
CODES:
2021 |NTERNATIoNAL BUILDING CoDE (lBC)
202r TNTERNATIoNAL RESIDENTIAL CoDE (lRC)
DESIGN LOADS:
R00F DEAD LOAD: 15 PSF
R00F SNOW L0AD: 30 PSF
FL00R DEAD L0AD: 50 PSF
FL00R LIVE L0AD: 100 PSF
WND SPEED: 112 MPH
EXP. CATEGORY C
STAFIK
861-E N DEAN RD
AUBURN, AL 36830
P: 360.566.7343
w.6tarKoundatiohs.60m
C)d
+t(o
@
tJ)e.U
L
-a
o-
lr,
#
N
125r.
2't 6't
REPAIR PLAN FRONT OF HOME
LEGEND
T
10K
INDICATES PUSH PIER &
UNFACToRED DESTGN LoAD (KIPS)
sEE DETATL 1/52.0
PLAN NOTES:
1. FIELD VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION. NOTIFY STARK FOUNDATIONS OF ANY DISCREPANCIES.
2. DO NOT INSTALL PIERS UNDER WNDOWS OR OPENINGS, UNLESS NOTED OTHERWSE.
3. PIERs cAN BE ADJUSTED A DISTANCE OF 1 -0,,t AS LONG AS IHE SPAN BETIIIEEN THE ADJUSIED PIER AND ADJACENT PIER DOES NOT EXCEED THE MAXIMUM
RECOMMENDED SPACING. WHEN lHE DISTANCE EXCEEDS lHE MAXIMUM RECOMMENDED SPACING, CONSULT WTH IHE ENGINEER OF RECORD FOR FURIHER
DIRECTION,4, PUSH PIERS SHALL BE INSTALLED TO A MINIMUM 2,OX lHE DESIGN LOAD AS NO1ED ON THE FOUNDATION REPAIR PLAN TO ACHIEVE AN ULTIMATE AXIAL LOAD
OF 28,OOO LBS MINIMUM. PIER EMBEDMENT SHALL BE 8'-0, MIN.
5. THE cbNTRAcToR SHALL BE SOLELY RESPONSIBLE FoR THE STRUcIURAL STABILITY OF ALL NEW AND EXISTING SIRUCTURES DURING CONSIRUCTION. 1HIS
INCLUDES, BUT NOT UMITED TO, EXCAVANONS, COIUMNS, EQUIPMENT LOADS, MAIERIAL LOADS, AND OIHERS. BRACING AND SHORING IS TO BE INSTALLED
PER THE LATEST OSHA STANDARDS. THE DESIGN AND OBSERVATIONS BY STARK FOUNDATIONS DO NOT INCLUDE INSPECTIONS OF TEMPORARY LOADING AND
STABIUTY DURING CONSIRUCTION.
r=
r=
5r
5r
c)
ct
-Hio
@
U)e,Ud
!at)l
CL
()
-+tr)
SCALE:
+to@ ;(e) 3s7s-/
DATENOREVISIONSBY
FOUNDATION REPAIR
HAYDEN INVESTMENTS
193 BUDS WAY
PARACHUTE, CO
PROJECT
ISSUED: O4.O2.25 PROJ NO.: 25.003.ASP
CHECKED BY: SADRA\AN BY: SHA
SHEET TITLE
FDN REPAIR PLAN
FRONT ELEVATION
SHEET NUMBER
s1.0
ASPEN FOUNDATION
REPAIR
P0 BOx 1913
RIFLE, CO
CLIENT
0
L
541 00
STAMP
$rtREo,,o**
Foundation Repair
193 Buds Way
Parachute, Colorado
Fo
IIJ-toE
o-
Date: 2-Apr-25
Designed by: SHA
No.: 25.003.ASP
Push Pier Design - Worst e
Vertical Design Loads:
Tributary Widths:
Dead:
Roof =
Third Floor =
Second Floor =
First Floor =
Walls =
Foundation Wall (height) =
Soil (height) =
Pier Working Loads:
Pol
0.75*PLL
Working Load, P1
Ultimate Load, Pu11
Pier Design:
Live:
Roof (snow) = 30
Third Floor = Q
Second Floor = 0
First Floor = I
Max Pier Spacing or Trib = $
450
0
0
'100
96
500
220
1 366
Bracket Cap = 24900 'Ot Therefore OK
Qu1 = A"yr (P) where A"y = working area of
the dual bore installation
A"yl = 9.62 in2
30 ft
0ft
0ft
2ft
8ft
5ft
2ft
= Rl QA lhe
= 4950 lbs
= 14000 lbs
= 28000 lbs
EDL =
ILL =
plf
plf
plf
plf
plf
plf
plf
plf
1
ft
ft
ft
ft
ft
900
0
0
200
plf
plf
plf
plf
plf00
Pier Type: Push Pier
Bracket FS288BL2
Shaft Diameler'. 2.875"
lnstallation Pressure, P:
Qrn = 2 (P'tt)
28000 lbs
Therefore, PpEq Qux / Asy
3000 psi
s
SITAFIK
FOUNI]ATICfNS
861.E N DEAN RD
AUBURN, AL 36830
P: 360.566.7Y3
w.starKoundalion6.coh
BACKFILL
(E) GRADE
(E) SLAB x
6l
x
^=Lroe,U
6JUai
LEU
oJU
L
FOOTING BEYOND
STANDARD BRACKE]
(SUPPoRTWoRKS P/N FS288B,
FS288BL, OR FS288BL2)
cHrP ouT PoCKET rN (E) FoonNG
FLUSH l''TH FDN WALL. POCKET
WDTH TO MATCH BRACKET IIIDTH
3 1/2'O X 48" GU|DE SLEEVE
(SUPP0RTWoRKS P/N FS288ES48)
2 7 /8"0 EXIENS|0NS
(SUPPoRTW0RKS P/N PP288)
27/8"e STARTER (PA PP288) V 3
1/2'o FRrCnoN REDUCTIoN CoLLAR
27 TYP PUSH PIER DETAIL
SCALE:
STAMP
54100
PROJECT
FOUNDATION REPAIR
HAYDEN INVESTMENTS
193 BUDS WAY
PARACHUTE, CO
FRONT ELEVATION
NO REVISIONS BY DATE
CLIENT
ASPEN FOUNDATION
REPAIR
P0 BOx 1913
RIFLE, CO
ISSUED: o4.o2.25 PROJ NO.: 25.003.ASP
DRAVVN BY: SHA CHECKED BY: sA
SHEET TITLE
DETAILS
SHEET NUMBER
s2.0
The Building Division will collect a Plan Review fee at time of application submittal. The Permit Fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by a person having written authority from the
owner to act as their representative.
I hereby acknowledge I have read, understand, and will abide with the requirements of this
checklist.
6rad tlaqden
ffi lqi--i!ij.Ap--ii-R!ffi ;i j-
Property Owner Print and Sign Date