Loading...
HomeMy WebLinkAboutConditions of PermitcoNDlilo NS OF PERMIT BLRE-03-25-9133 SEPT-o3-25-9134 RICHARD & VICKY NASH NEW 600 SO FT Accessory Dwelling Unit (ADU)ADDITION TO EXISTING DETACHED GARAGE 965 Westbank Rd, GWS WESTBANK RANCH SUB #1, Lot 15 1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATTONAL RESIDENTIAL CODE (r.R.c.)AND 2018 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTI FICATE OF OCCU PANCY. 4) ALL EXTERTOR LTGHTING TO BE DOWNCASTAND SHIELDED. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHALL COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNIry DEVELOPMENT WEBSITE FOR ADDITIONAL IN FORMATION. 6) OPEN HOLE SOTLS REPORT rS REOUTRED AT FOOTTNG TNSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 1,500 PSF soil bearing capacity. 7) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL /SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPT. 8) BLOWER DOOR TEST tS REOUTRED. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. See stamp on cover sheet for smaller scale ADU footprint circumstances. 9) PRESCRIPTIVE PATH WITH RESCHECK REPORT IS CHOSEN FOR ENERGY COMPLIANCE OF THIS ADU. NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2)AS STAMPED ON COVER SHEET.