HomeMy WebLinkAboutConditions of PermitcoNDlilo NS OF PERMIT
BLRE-03-25-9133
SEPT-o3-25-9134
RICHARD & VICKY NASH
NEW 600 SO FT Accessory Dwelling Unit (ADU)ADDITION
TO EXISTING DETACHED GARAGE
965 Westbank Rd, GWS
WESTBANK RANCH SUB #1, Lot 15
1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATTONAL RESIDENTIAL CODE
(r.R.c.)AND 2018 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED
IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER
REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC
BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION.
ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION &
CERTI FICATE OF OCCU PANCY.
4) ALL EXTERTOR LTGHTING TO BE DOWNCASTAND SHIELDED.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHALL COMPLY WITH WILDFIRE
MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO
STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE
GARFIELD COUNTY COMMUNIry DEVELOPMENT WEBSITE FOR ADDITIONAL
IN FORMATION.
6) OPEN HOLE SOTLS REPORT rS REOUTRED AT FOOTTNG TNSPECTION AND PRIOR TO
ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT
TO THE BUILDING INSPECTOR. 1,500 PSF soil bearing capacity.
7) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO FINAL BUILDING INSPECTION &
CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL /SIGN-OFF FROM
GARFIELD COUNTY'S PUBLIC HEALTH DEPT.
8) BLOWER DOOR TEST tS REOUTRED. MUST SUBMIT BLOWER DOOR TEST REPORT
TO GARFIELD COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO
SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. See stamp on cover sheet
for smaller scale ADU footprint circumstances.
9) PRESCRIPTIVE PATH WITH RESCHECK REPORT IS CHOSEN FOR ENERGY
COMPLIANCE OF THIS ADU. NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL
VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2)AS
STAMPED ON COVER SHEET.