HomeMy WebLinkAboutObservation of Installation 04.28.252789 Riverside Parkway
Grand Junction, Colorado 81501
Phone: 970-255-8005
Info@huddlestonberry.com
April 28, 2025
Project#02890-0001
Reeves & Sons Electric
1560 Main Street
Silt, Colorado 81652
Attention: Mr. Andrew Reeves
Subject: OWTS Installation Inspection
111 W. Main Street
Silt, Colorado
Reference: OWTS Design, 111 W. Main Street, Silt, Colorado by Huddleston-Berry
Engineering & Testing, LLC for Reeves & Sons Electric, August 26, 2024.
Dear Mr. Reeves,
In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry
Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater
Treatment System (OWTS) at 111 W. Main Street in Silt, Colorado. As indicated in the
referenced report, HBET completed engineering design of the system.
Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with
the design. The as-built site plan is attached. Please contact us if you have any questions or
comments regarding the contents of this letter.
Respectfully Submitted:
Huddleston-Berry Engineering and Testing, LLC
Wayne D. Anderson, P.E.
Project Engineer
Cc: Garfield County Building Department
ATTACHMENTS
NEW
BUILDING
REPAIR
AREA
NEW STA
1,000
GALLON
TANK
EXISTING
WATER LINE
EXISTING
RESIDENCE
NEW WATER LINE
EXISTING
TANK
EXISTING STA
111 W. MAIN STREET
AS-BUILT SITE PLAN
Project # 02890-0001
Date: 04/28/25
By: WDA
N
Scale: 1" = 30'
2789 Riverside Parkway
Grand Junction, CO 81501