HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-03-25-91 30 Ranch Hand Housing
B LRE-03-25-9 1 32 Detached Ga rage
TALBOTT ENTERPRISES LLC
3,OOO SO FT RANCH HAND HOUSING
& DETACHED GARAGE
9109 CR 31 1, Silt
Eagles View Ranch Minor Subdivision, Lot 2A
1) ALL WORK SHALL COMpLY W|TH THE 2015 TNTERNATTONAL RESTDENTTAL CODE
(r.R.c.)AND 2018 TNTERNATTONAL ENERGY CONSERVATTON CODE (r.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED
IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER
REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMTTTTNG AND tNSPECT|ONS BY COLORADO STATE ELECTRTC
BOARD. ELECTRICAL ROUGH.IN APPROVAL IS REQUIRED AT FRAME INSPECTION.
ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION &
CERTI FICATE OF OCCU PANCY.
4) ALL EXTERTOR LTGHTTNG TO BE DOWNCAST AND SHTELDED.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHALL COMPLY WITH WILDFIRE
MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO
STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE
GARFIELD COUNTY COMMUNIry DEVELOPMENT WEBSITE FOR ADDITIONAL
INFORMATION.
6) OPEN HOLE SO|LS REPORT rS REOUTRED AT FOOTTNG TNSPECTION AND PRTOR TO
ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT
TO THE BUILDING INSPECTOR. 2,500 PSF SPECIFIED BYTHE GEOTECH.
7) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO FINAL BUILDING INSPECTION &
CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL /SIGN-OFF FROM
GARFIELD COUNTY'S PUBLIC HEALTH DEPT. SEPT-03-25-9131
8) ROAD & BRIDGE DRIVEWAY REVIEW / APPROVALS: PERMIT GRB25-D-001 PRIOR TO
FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY PROVIDE FINAL
APPROVAL / SIGN-OFF FROM GARFIELD COUNry'S ROAD & BRIDGE DEPT CALL
(970) 625-8601AND HAVE ROAD & BRTDGE S|GN THE PERMTT TNSPECTTON CARD.
9) BLOWER DOOR TEST IS REQUIRED. MUST SUBMIT BLOWER DOOR TEST REPORT
TO GARFIELD COUNTY COMMUNIry DEVELOPMENT DEPT. OFFICE PRIOR TO
SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL.
10)PRESCR|PT|VE PATH W|TH 2018 rECC TABLE R402.1.2 HAS BEEN CHOSEN FOR
ENERGY COMPLIANCE OF THE HOME DESIGN. SEE ATTACHED MECHANICAL
SPECIFICATIONS AND REPORTS. ALL NEW HOMES TO HAVE WHOLE_HOUSE
MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)
AND (2)AS STAMPED ON SHEET A-101)