Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-04-25-9188 TODD SIEVERS & JANICE DEPINTO New Single-family dwelling w/ attached garage TBD Surrey St, Carbondale Elder Amended, Lot 8 - 239336217008 1 ) ALL WORK SHALL COMpLY W|TH THE 2015 TNTERNATIONAL RESTDENTTAL CODE (l.R.C.) AND 2018 I NTERNATIONAL ENERGY CONSERVATION CODE ( I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL I NFORMATION. 6) OPEN HOLE SOTLS REPORT rS REOUTRED AT FOOTTNG TNSPECTION AND PR|OR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 2,000 PSF soil bearing. Provide a compaction report if any structural fill. 7) SECOND FLOOR STORAGE ROOMS SHALL NOT BE USED FOR FUTURE HABTTABLE LTVTNG (CONTAIN NO NATURAL LIGHT OR VENTILATION PER R303, R31O) 8) SECOND FLOOR',WET BAR',COUNTERTOP SPACE LTMTTED TO MAXTMUM 25 SO FT. SEE STAMPS AND NOTES ON PAGE 3 OF ARCHITECTURALS. 9) CAREFUL: MUST NOT REMOVE VEGETATION FROM 35 FT RIPARIAN ZONE - MEASURES FROM HIGH WATER MARK. 10) CONDITION OF PERMIT: ANY CONSTRUCTION ACTlVlry THAT CHANGES THE BASIC CHARACTER OR TOPOGRAPHY OF THE NATURAL LAND LOCATED IN THE l OO.YEAR FLOODPLAIN MUST FIRST OBTAIN A'FLOODPLAI N DEVELOPM ENT PERM IT' TH ROUG H GARFI ELD COUNTY'S PLANN I NG DEPT. 1 1 ) BLOWER DOOR TEST tS REOU|RED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFIELD COUNry COMMUNIry DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 12) PRESCR|pTtVE PATH USTNG 2018 rECC TABLE R402.1.2 rS CHOSEN FOR ENERGY COMPLTANCE OF THIS HOME. MANUAL J REPORT ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE- HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m'1507.3.3(1)AND (2) SHOWN ON COVER SHEET. .at\ s $