Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PE RMIT BLMF-03025-91 55 OO45 COUNTY ROAD 105 LLC PRE-FABRICATED HOME ON ENGINEERED FOUNDATION CRAWL SPACE 45 COUNry ROAD 105, CARBONDALE - 239324200407 MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (C.D.O.H.) AND ALL FACTORY.BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. (2018 |ECC 'BLOWER DOOR TESTtNG', ON PREMTSES AFTER INSTALIATION SHALL NOT APPLY FOR MANUFACTURED HOMETYPE - AS CURRENT ENERGY COMPTIANCE FOR STATE OF COLORADO IS TO BE VERIFIED AT THE FACTORY) 1) THE APPROVED PLANS ARE TO BE ON-SITE FOR INSPECTIONS. 2) SANTTARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS. 3) FOUNDATTON CRAWL SPACE & EXTERTOR DOOR LANDTNG / STAIRS SHALL COMPLY WITH 201 5 l.R.C., 201 B I.E.C.C. AND MANUFACTURER'S INSTALLATION REOUIREMENTS. 4) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENTS AND MANU FACTURER'S I NSTALLATION REOU I REM ENTS. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SFRVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADD ITIONAL I N FORMATION. 6) ALL PLUMB|NG AND GAS ptptNG CONNECTTONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 7) ELECTRTCAL PERMtTTtNG AND tNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL, IF ANY, WORK PROPOSED IN ATTIC LOFT. ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY. B) pRtoR TO FINAL BUtLDtNG tNSPECTTON & CERTTFTCATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM. 9) cARFtELD COUNTy BUtLDTNG DEPT. TNSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS DESIGNED AT 2,500 PSF, VERIFY 36 INCH MINIMUM FROST DEPTH & UFERGROUND INSTALLED. OPEN HOLE SOILS REPORT REOUIRED AT FIRST FOOTING INSPECTION. B. FOUNDATION C. SEPTIC SYSTEM CONNECTION D. PLUMBING/GAS E. SITE FRAMING, STAIRS, HANDRAILS PER STRUCTURAL ENGINEERS PLANS AND FIELD COPY. F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* *NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY