HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PE RMIT
BLMF-03025-91 55
OO45 COUNTY ROAD 105 LLC
PRE-FABRICATED HOME ON ENGINEERED FOUNDATION CRAWL SPACE
45 COUNry ROAD 105, CARBONDALE - 239324200407
MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (C.D.O.H.) AND ALL
FACTORY.BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR
MANUFACTURE AND INSTALLATION AT THE JOB SITE.
(2018 |ECC 'BLOWER DOOR TESTtNG', ON PREMTSES AFTER INSTALIATION SHALL NOT APPLY FOR MANUFACTURED
HOMETYPE -
AS CURRENT ENERGY COMPTIANCE FOR STATE OF COLORADO IS TO BE VERIFIED AT THE FACTORY)
1) THE APPROVED PLANS ARE TO BE ON-SITE FOR INSPECTIONS.
2) SANTTARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS.
3) FOUNDATTON CRAWL SPACE & EXTERTOR DOOR LANDTNG / STAIRS SHALL COMPLY WITH 201 5 l.R.C.,
201 B I.E.C.C. AND MANUFACTURER'S INSTALLATION REOUIREMENTS.
4) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENTS AND
MANU FACTURER'S I NSTALLATION REOU I REM ENTS.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SFRVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR
ADD ITIONAL I N FORMATION.
6) ALL PLUMB|NG AND GAS ptptNG CONNECTTONS MUST BE PERFORMED BY A COLORADO LICENSED
PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
ELECTRICIAN.
7) ELECTRTCAL PERMtTTtNG AND tNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL, IF ANY, WORK PROPOSED IN ATTIC LOFT. ELECTRICAL FINAL APPROVAL
REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY.
B) pRtoR TO FINAL BUtLDtNG tNSPECTTON & CERTTFTCATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR
WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT FOR
INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM.
9) cARFtELD COUNTy BUtLDTNG DEPT. TNSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS DESIGNED AT 2,500 PSF, VERIFY 36 INCH MINIMUM FROST DEPTH & UFERGROUND
INSTALLED. OPEN HOLE SOILS REPORT REOUIRED AT FIRST FOOTING INSPECTION.
B. FOUNDATION
C. SEPTIC SYSTEM CONNECTION
D. PLUMBING/GAS
E. SITE FRAMING, STAIRS, HANDRAILS PER STRUCTURAL ENGINEERS PLANS AND FIELD COPY.
F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY*
*NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO
FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY