Loading...
HomeMy WebLinkAboutConditions of PermitcoN DITIONS OF PERMIT BLCO-05 -25-9237 GARFIELD COU NTY LAN DFILL DETACHED FIBER HUT 75 COUNTY ROAD 246, RIFLE Sectio n: 2}Township: 6 Rang e: 94SEC 17 : LOTS'l 8,20,22 &24. SEC 20: LOTS 1,5,8 & 11. SEC. 21:LOTS 1 & 2. 1) THE APPROVED PLANS ARE TO BE ON-SlrE FOR INSPECTIONS. 2) SANITARY FACILITIES ARE REOUIRED TO BE PROVIDED FOR WORKERS. 3) A LIST OF REOUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT AND APPROVE THE ELECTRICAL WORK. RMITS 4) UNDERGROUND UTtLtry LOCATES tS THE RESPONSIBILITY OF THE OWNER OR CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE. ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTIONS. 5) GEOTECHNICAL OBSERVATION lS REOUIRED WHEN THE EXCAVATION lS COMPLETE AND WRITTEN VERIFICATION BE SUPPLIED AT FOOTING INSPECTION, 3000 PSF. 6) THE ENGTNEERED FOUNDATTON DESIGN rS A SLAB ON GRADE WITH NO FROST PROTECTION. 2015 IBC SECTION 1809.5 ALLOWS FOR STRUCTURES OF SIMULAR USES AND ARE 4OO SQUARE FEET OR LESS BE WAIVED FROM FROST PROTECTION. AS DESIGNED, THIS BUILDING IS SUSEPTIBLE TO FROST MOVEMENT. ALL UTILITY CONNECTIONS TO ACCOMMODATE MOVEMENT. 7) SLOPE GRADE AWAY FROM THE SLAB/STRUCTURE. 8) INSPECTIONS, SEE ATTACHED LIST FOR DETAILS: . SLAB REBAR INSPECTION . UNDERGROUND GAS INSPECTION r STATE ELECTRICAL INSPECTIONS o FINAL BUILDING INSPECTION