HomeMy WebLinkAboutOWTS Design Plan-RevisedE M t Ln N O N c N Q t✓ Design Calculations OWTS GENERAL NOTES: ' ` v co N The site has an existing 3- bedroom residence served by an OWTS constructed in 2001. The new addition will 1. THE REPLACEMENT OWTS AS SHOWN ON THE PLAN AND THE DETAILS WERE DESIGNED BY SOPRIS J � add an additional bedroom and full bath to be served by additional OWTS components. The proposed onsite ENGINEERING. J O n - +� ��Q Gallon MCP wastewater treatment system (OWTS) is being installed to serve a small apartment and and existing z bath in homeowner shop facility. 2. THE PROPOSED LOT CONDITIONS BY SOPRIS ENGINEERING AND OWNERS. U E O IM 7al�azcP Infiltrator@Gall Tank garage The design flow treatment capacity is calculated as follows for a minimum equivalent 1-bedroom single family 3. THE EXISTING LOT CONDITIONS PER COUNTY GIS DATA BASE, AERIAL MAPPING, LIDAR TOPOGRAPHY, z J Q I) residence. The additional OWTS improvements will be compliment the existing 3- bedroom residence. 0 Tip From the Regulation 43 usage table : Existing subdivision Plat AND owner provided sketches. - .� za� ° ° V'WW Minimum population based on 1 bedroom = 2 persons. day factor 4. OWNER NAME & ADDRESS: RICHARD A & VICKY L NASH L.L LLJ m x FM Gallons per per person =75 gal/person/day, No peaking 965 WESTBANK RD, Q C Max. Design flow (Qd)gallons/day = (# of people) x (avg. flow)gal/person/day. GLENWOOD SPRINGS, CO. 81601. U N =s Design flow Qd = 2*75=150 gpd wrt.KW 7 Glr Septic Tank Design: 5. 6. LEGAL SUMMARY: GLENWOOD SPRINGS, CO. 81601. SITE ADDRESS: 965 WESTBANK RD, GLENWOOD SPRINGS, CO 81601 7W L v Q 0 LLI 0)Hi1--rt r rAMPKI 0 0 ""F M Use a 1000 gallon, two compartment plastic septic tank with an effluent filter outlet sanitary tee in the second 7, Parcel Number: 218535301015 w T V) o Mid -Height Seam chamber. Tank shall be installed with sealed plastic risers and lids to the finish grade surface. W o PROPERTY LINE STA C RENC.' FiELu BK at=team" Swfion Preliminary Sub Surface Conditions and Testing: 8. EXISTING GARFIELD COUNTY PERMIT# SEPT-05-216880, ISSUED 08/02/21 ' ^ �JJ w 0 0� _ rvS I ALL 15 QUICK-4 PLUS CH ERS IN 3 ENC S 2 LENGTH S PER TRENC US D S B STBK EX 2" SEWER SERVICE PRESSURE PIPE TOTA SORPTION S.F ,� STBK EX SUB FLOOR EJECTOR PUMP g• _ "�"01e on f' o�lrT t T�dcr,dtd.alld. A subsurface soil investigation and site assessments were performed by Sopris Engineering on May 1, 2021 and June 7 2021. The shallow soils in the previously excavated chamber trench field, excavation for the replacement tank and soils observed in the deep crawl space area were sampled and characterized by ��// I..L ^^ L.L ~ CD z < STBK >BATHROOMtar BASIN FOR z SHOP � application of the USDA visual/tactile soil texture method analysis. Soils were observed in the 2 3 feet deep OWTS SYSTEM NOTES N STBK �, � * trenches excavated for the original replacement field. A 2.5 shallow hand dug profile hole was dug in the �/^' Iv / / STBK vicinity of the field and the approximately 6 feet deep vertical foundation excavation walls were observed and 1. ALL MATERIALS AND INSTALLATION SHALL CONFORM TO STATE AND COUNTY ONSITE t0 / sampled at 3 and 6 foot depths. The soils below 6 inches of topsoil consist of medium dense slightly sandy silt WASTEWATER TREATMENT SYSTEM (OWTS) REGULATIONS. INSTA INSPECTION PORT D RISER I2r loam texture soil with slightly blocky to granular structure to a depth of 6 feet. The soil profile contained less DATE: 04-24-25 W/ PUSH ON CAP " BELOW FINISH GRADE & COVE ITH 6" DIA. VALVE B "PIPE TO BEMAINTQINED & CO NECTED . ce..,Pnant with LEA end IAPYi[I Standards than 35% scattered gravel or rock content to the 6-feet depth observed below the surface grades. No evidence 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT ALL UTILITY COMPANIES FOR JOB NO. SET W ID 1" ABOVE FINI AIDE 0 NEW 4" GRAVITY SEWER SERVIC ' meulet■d `Id` lKneel'cup ■ burialdepth k 4a' trrvteW of free water was encountered in the excavations. Seasonal high Groundwater levels are expected to be below 10 feet from flat FIELD LOCATIONS OF UTILITIES PRIOR TO CONSTRUCTION AND EXCAVATION. 30177.01 DESIGNED BY PER 04/23/25 the existing surface grades on the relatively terrain. MInIm rn (TY . ACH TRENCH CHA R END CAP) ■ Ml k I. t rat depth to 8' Ymk I. not rated for ,ehfculor trofflc loading uFrinoersnw � 3. ALL SEWER LINES TO BE SDR-35 OR SCHEDULE 40 P.V.C. PIPE UNLESS NOTED OTHERWISE. TOP P RIM ETER OF THE SURFACE TO BE • EMt.rlar of monhol. cony Includes tfie following [f7AlrJL} G�Sp. 'GANGER 00 NOT ENTER: MiSON End The native soils sampled from 2-3 feet below the surface, in the vicinity of the proposed field and foundation, M NDED MIN. E SURFACE GRADES are characterized as a soil type 2 consisting of silt loam texture with slightly blocky granular structure. This soil 4. INSTALL A TWO-WAY CLEAN OUT ON THE SERVICE LINE FROM THE HOUSE AND AN DRAWN BY WJB 04/21/25 PROPOSED 600 S.F. view has an effective loading rate for conventional soil treatment of 0.6 Gal/S.F./day for a level 1 conventional ADDITIONAL CLEANOUT WITHIN 100' SECTION OF EFFLUENT DISCHARGE PIPE. CHECKED BY YTN 04/24/25 V IABLE TRENCH EXCAV TION DEPTHS. CH TRENCH SURFACE AB RPTIVE SURFAC ADDITION 1-BEDROOM Dlgging Specs Invert D]meneione NO weight - Capacity }2' Lrn 7' 1Wde Inlet IQuttet Length Width Heigh! 1NFILTRATOR' treatment system. The equivalent percolation rate is assumed to be 20 30 minutes per inch. The soils are suitable for a shallow conventional shallow absorption field consisting of gravelless infiltration chamber units. 5. THE SEPTIC TANK SHALL BE INSTALLED LEVEL ON COMPACTED EARTH. INSTALL WATERTIGHT x APPROX, 2' 3' B OW EXISTING G E g ! Prior to field excavation and placement of materials, during the time of construction, additional observations RISERS AS NECESSARY TO BRING ALL REQUIRED ACCESS POINTS TO THE FINISHED SURFACE 47" 44' 127, B2 2' 54.7" 1024 gal 32D lbs �IAWFr K of soils in the proposed tank and trenches will be performed to confirm initial soil characterization and direct GRADE. BACKFILL WITH SUITABLE NATIVE SOIL FREE OF BOULDER AND ROCK IN EXCESS OF 3" 4" I'VC DIS �BUTI01 P E, I LL INTO C IE IB �0 placement of specified components. The findings from the observations and construction inspections will be DIAMETER. I UPP A 10 Phvnr: 719s87B4 WooAND vazL�Y �: 71i3391�r3727 included in the As constructed documentation. 6. A SANITARY BAFFLE TEE IS REQUIRED ON THE SEPTIC TANK INLET OUTLET. INSTALL THE PP-2 L " 2 W EANOUT 'BELOW 1AfMrc www. PIMA Tine, �COM Soil Treatment Unit/Absorption System Design: INLET AND OUTLET TEES PLUMB AND IN A POSITION TO ALLOW EASY INSPECTION AND MAINTENANCE OF TANK FROM THE TANK RISERS. INV. 1. EX GRADE Buenas yet Ca omda ST ILL ER END CAP 4" PVC SEWER PIPE 2% The treatment/absorption field is designed based on utilizing the effective Long Term Acceptance Rate (LTAR) 7 INSTALL A 4" EFFLUENT FILTER ON THE 4" OUTLET TEE OF THE SEPTIC TANK. THE FILTER 0 A L CHAMBERS USE SDR-35 OR SCH 0 for the native soils and the application of appropriate loading factors for a soil treatment unit system utilizing SHOULD BE INSPECTED EVERY SIX MONTHS. THE EFFLUENT FILTER SHALL BE MAINTAINED AND REINFORCED PLASTIC SEPTIC TANK DETAIL gravity distribution to gravelless chamber trenches. The new treatment system and absorption field will consist of gravity distribution of septic tank effluent via a distribution box to individual chamber trenches with CLEANED WHEN THE TANK IS PERIODICALLY PUMPED OR AS NECESSARY. INSTALL A SUITABLE 7 Z CONCRETE OR PLASTI T TIO B X W/ BAFFLE EX-2" SEWER PIPE TO BE RECOVERED, SEVERED treatment across the native soil absorptive surface. EXTENSION ON THE FILTER WITH A HANDLE TO BE WITHIN 6" BELOW THE ACCESS LID. Uj INSTA E 0 C ACTED BASE IN TALL W/ RISERS & LID S " A O ES ACE GRADE AND INSTALLED TO NEW 4" SEWER SERVICE WITH 4" FULL BODY WYE W/ 2X4 REDUCER N.T.S. 8. THE CONTRACTOR SHALL ENSURE THAT THE SEWER LINES, SEPTIC TANK AND RISERS ARE Long Term Acceptance Rate (LTAR): WATERTIGHT. ALL PLUMBING FIXTURES AND OWTS COMPONENTS SHALL BE INSTALLED AND INSTALL A 2-COMPARTMENT 1060-G ON PLASTIC SEPTIC TA'A�K MAINTAINED TO AVOID SURFACE OR GROUNDWATER FROM ENTERING THE SYSTEM AND TO (USE VALLEY PRECAST ITEM-15-IM 060-2CPa OR EQUAL) Considering the application of the state regulation 43: PREVENT LEAKAGE FROM THE SYSTEM. IN-HOUSE PLUMBING FIXTURES SHALL BE MAINTAINED O 1 U PIP-t O INSTALL INLET SANITARY TEE & UTLET EFFLUENT FILTER ASSEMBLY. Receiving Wastewater Treatment Level 1; LTAR; (Table 10-1 Soil type 2 loading rate for a silt loam is (0.6 TO PREVENT EXCESS WATER FROM ENTERING THE SEPTIC SYSTEM. Q O INSTALL WITH (2) 24" DIA. 12" DEEP PLASTIC RISERS WITH LIDS. gal./S.F./day); INSTALLED 45 QUICK-4 CHAMBERS IN 3 TRENCHES WITH 15 CHAMBERS UNITS PER TOP OF LIDS TO BE INST ED @ + 3" ABOVE FINISH GRADE. Design Flow; Qd = flow (gal/day) =150 gpd 9. THE DIMENSIONS AND NOTES SHOWN ON THE PLAN INDICATE MINIMUM AREA, LENGTH, < Q TRENCH FOR A TOTAL ABSORPTION AREA OF 525 S.F. THE SYSTEM IS PLUMBED FOR Loading factors; (Table 10-2, Gravity application trenches, L.F.1 = 1.0) WIDTHS AND SEPARATION DISTANCES FOR THE TRENCHES, BED OR MOUNDED ABSORPTION EQUAL GRAVITY DISTRIBUTION. THE BOTTOM OF EACH TRENCH WAS EXCAVATED TO A (Table 10-3, Gravelless chambers, L.F.2 = 0.7) FIELD. Q MAXIMUM AVERAGE DEPTH OF 24 INCHES BELOW THE EXISTING SURFACE GRADES WITH A MINIMUM 10-INCHES OF COVER OVER THE CHAMBERS. / STU absorption treatment area; A = Area S.F.; 10. THE ABSORPTION TRENCHES SHALL BE EXCAVATED TO LEVEL GRADE IN NATIVE EARTH. THE O O TRENCH BOTTOM AND SIDEWALLS SHALL BE SCARIFIED AND/OR RACKED IF SMEARING INSTALLED CHAMBER ENDCAPS (TYP.) _ A(sf) = Qd x L.F.1 x L.F.2 .: A(sf) = 150 gpd x 1.0 x 0.7 = 175 S.F. L U J LTAR 0.6 Gal/S.F./day OCCURS. IF EXCESSIVE LARGE COBBLES OR BOULDERS ARE ENCOUNTERED IN ANY PART OF THE O J/ 1 � � INSTALLED 4" RISER PIPE INSPECTION PORT EXCAVATION OVER 6" FROM THE PROPOSED TRENCH BOTTOM SURFACE, OVER EXCAVATE AND BACKFILL WITH SAND. O EXTEND RISER W/ CAP MIN. 1" ABOVE FINISH Number of Quick-4 Infiltrator chambers 4'xTx12"chambers: 175 S.F. = 14.583 chambers; Use 15 chambers L` U U GRADE (TYP. EACH CHAMBER END CAP) 12 S.F./Chamber 11. THE LEACHING CHAMBERS SHALL BE INSTALLED LEVEL WITH A MINIMUM COVER OF 10 INCHES J NOT TO EXCEED 24 INCHES. W 4" PVC DISTRIBUTION PIPES (TYP.) O Number of Equivalent Arc chambers chambers: 12. LEACHING CHAMBERS WILL BE PLACED IN THE EXCAVATION OVER THE NATIVE SOIL OR SELECT Q Z TO HEAD OF EACH TRENCH END CAP � -- rs; Use 350 S.F. = 11.667 chambers; Use 12 chambers SOIL REPLACEMENT OR ASTM-33 SAND LEVELING COURSE. END CAPS SHALL BE INSTALLED ON �f �l 1� PLASTIC 5-PORT OUTLET DISTRIBUTION BOX 15 S.F./Chamber THE END CHAMBERS IN EACH TRENCH. /'� Q ` 1 L 1 INSTALLED LEVEL ON COMPACTED BASE. INSTALLED RISERS & LID TO SURFACE GRADE ^ I � INSTALLED 4" 2-WAY CLEANOUT Use 15 Quick-4 Infiltrator chambers in 3 trenches 22' long by 3' wide with 5 chambers units per trench plus two end caps as delineated on the plan. Alternative use 12 Arc chambers in 3 trenches 20' long by 3' wide with 4 13. VERTICAL INSPECTION PORTS SHALL BE INSTALLED FROM THE PRE MARKED HOLE ON THE TOP EACH END CHAMBER CAP. TYP. BOTH ENDS OF EACH ROW THE PORTS MAY HAVE W MM W 5 4" SDR-35 PVC EFFLUENT PIPE @ MIN. 1 %, INV. 15BELOW EX GRADE± chambers units per trench with ends caps. The septic tank effluent will be gravity distributed to the head of ( ) iteeteette L ) I each chamber row via individual distribution pipes from a distribution box. THREADED CAPS AT GRADE. THREADED V INSTALLED ROTH 1060 GALLON 2-COMPARTMENT REINFORCED PLASTIIC SEPTIC 14. THE CHAMBERS WILL BE BACKFILLED WITH EXCAVATED MATERIAL VOID OF ROCKS, THE Uj O LU TANK WITH SEALED RISERS & LIDS INSTALLED AT THE FINISHED GRADE SURFACE. F S BACKFILL MATERIAL SHALL NOT EXCEED 2 1/2" DIAMETER AND SHALL BE PLACED TO AT LEAST ( � INSTALLED INLET SANITARY TEE AND OUTLET EFFLUENT FILTER SANITARY TEE. 6 INCHES ABOVE THE TOP OF THE CHAMBERS. THE TOP OF THE PLACED BACKFILL SHALL BE 3: `/ Z DEPTH TO TOP OF TANK FROM GRADE IS APPROXIMATELY 12". // \11 COVERED WITH A LAYER OF FILTER FABRIC. A MINIMUM 4" DEPTH OF TOPSOIL IS TO BE PLACED ABOVE THE BACKFILL TO THE SURFACE & RE VEGETATED. C)O 0v5 4" SCHD-40 PVC SEWER PIPE @ 2%, 15. INSTALLATION OF LEACHING CHAMBERS SHALL BE IN CONFORMANCE WITH THE Z L.1 / J MANUFACTURES INSTALLATION INSTRUCTIONS. f W U 16. THE ABSORPTION TRENCHES/BED OR MOUND MUST BE GENERALLY MARKED AT THE FOUR CORNERS WITH INSPECTION PORTS AND/OR BURIED REBAR. THE FIELDS MUST BE PROTECTED V 1 U FROM VEHICULAR AND LIVESTOCK TRAFFIC. 17. THE ABSORPTION FIELD SURFACES MUST BE SLOPED OR SLIGHTLY MOUNDED TO DIVERT < Z RAPH IC SCALE SURFACE DRAINAGE AWAY FROM THE FIELD. (vf I - O 18. THE ENTIRE ABSORPTION FIELD SURFACE MUST BE RE VEGETATED. U 20 0 10 20 40 80 / 19. THE ABSORPTION FIELD SHALL BE INSTALLED PER THE REQUIRED SETBACK DISTANCES: 10 feet V) OWTS DESIGN PLAN from any property line. 25 feet from any potable water supply line. IN FEET 20 feet from any occupied dwelling. = 1 Inch = 20 ft. 100 feet from any well, spring or cistern. O Cr 100 feet from any stream or water course. 0 z DISTRIBUTION SYSTEM NOTES: CONNECT INDIVIDUAL 4" DISTRIBUTION PIPE TO HEAD OF EACH CHAMBER TRENCH (TYPICAL EACH TRENCH). 1. FILTERED EFFLUENT WILL DISCHARGE TO A CONCRETE DISTRIBUTION BOX WITH RISERS AND INSTALL CONNECTION AS NEEDED FROM END OR SIDE INLET EXTEND 4" RISER PIPE LID AT THE SURFACE. PORT OF EACH INFILTRATOR CHAMBER END CAP. MIN. 3" THROUGH END CAP OR CHAMBER PRE 2. THE DISTRIBUTION SYSTEM WILL BE INSTALLED TO ALLOW FOR EFFLUENT TO BE EQUALLY DISTRIBUTION BOX LID FORMED PENETRATION DISTRIBUTED TO THE ABSORPTION TRENCHES VIA INDIVIDUAL 4" DISTRIBUTION LINES CHAMBER END CAP 6" VALVE BOX 6" VALVE BOX AT GROUND SURFACE SECURE WITH SCREWS CONNECTED TO THE HEAD OF EACH CHAMBER TRENCH. THROUGH PENETRATION RISER SECTION 3. THE MINIMUM SLOPE OF THE DISCHARGE LINE FROM THE TANK TO THE DISTRIBUTION BOX G. CAP FLANGE INTO PIPE BAFFLE SHALL SHALL BE INSTALLED AT A MINIMUM 1% SLOPE. THE INDIVIDUAL DISTRIBUTION LINES AT THE HEAD OF THE TRENCHES SHALL BE INSTALLED AT A MINIMUM OF 2% SLOPE. 4" DISTRIBUTION l 4" INSPECTION PORT RISER F_ GRAVITY LINE 2377 4" EFFLUENT PIPE FROM FROM SEPTIC TANK J TESTING, INSPECTIONS AND CONSTRUCTION MANAGEMENT: =;; w24 2025 � Or I DISTRIBUTION BOX t� O O 1. ADDITIONAL GEOTECHNICAL EVALUATIONS AND INSPECTIONS BY THE ENGINEER SHOULD BE 1b IQ y ` CHAMBER END CAP CONNECTION DETAIL N.T.S. 4" SOLID PVC GRAVITY \ \ DISTRIBUTION PIPES (TYP.) PERFORMED DURING INITIAL STAGES OF CONSTRUCTION TO VERIFY SOIL CONDITIONS AND OWTS DESIGN. SUFFICIENT NOTICE TO THE ENGINEER BY THE PROJECT+�/C.� ti <�, s"•....• •' ��\� p`�" WESTBANK RANCH PLANNED DEVELOPMENT SUBDIVI;! TO ABSORPTION FEILD INVERT IN ��8" MANAGER/CONTRACTOR NEEDS TO BE MADE IN ORDER TO SCHEDULE THE SITE INSPECTIONS. +r1 (;. �8 FILING. NIQ N0. I t�0. AGREGATE BASE COURSE J WESTe,Mt RANCH 2 PRIOR TO CONSTRUCTION OF THE PERMITTED SYSTEM THE ENGINEER SHOULD BE CONTACTED DATE REVISION "AFONGQUICK-4 ��".� g�ewggp ti QUICK-4 INFILTRATOR OR EQUAL BIO DIFFUSER COMPACTED SUBGRADE BY THE PROJECT MANAGER/CONTRACTOR WELL IN ADVANCE TO PROVIDE ADEQUATE TIME �® e„ ®R, K,..� c.arNAat,ar k INFILTRATOR END CAP CHAMBER DISTRIBUTION BOX DETAIL TO DISCUSS THE SYSTEM COMPONENTS WITH THE CONTRACTOR, ANSWER QUESTIONS, RESOLVE ANY CONFLICT ISSUES AND SCHEDULE INSPECTION SITE VISITS BASED ON •. Yr.=°' die` �"+a°a`°"y. 85354230U7' CONSTRUCTION PROGRESS. ,„ ®.:;F,..a < �,,+n - . I* N.T.S. I CLOSE _ `w,c ° m e«. e. `�' �' I _ s w ,w ®a .•■ °� �-®. �� s' +�`�°�'" "";' w d 1� °i STEVEN.L - �' - K RG604S4 � INSPECTION PORT CONNECTION DETAIL N.T.S. CROWN FIELD TRENCH TO 3. COUNTY REGULATIONS REQUIRE THAT THE DESIGN ENGINEERS OF RECORD PERFORM SITE INSPECTIONS OF THE PERMITTED SYSTEM DURING CONSTRUCTION AND PROVIDE "AS BUILT" uema'�'coa �7 "% �` 1 rr. " 2 I B 353{}1 Ui-4 DIVERT SURFACE WATER m « ti� _ ww anm r _ � DOCUMENTATION OF THE INSTALLED SYSTEM TO THE COUNTY AFTER CONSTRUCTION IS t; " re """ e '°"w a,•ctr woac `,. iaasrW ,. ', : 4" PVC INLET PORT COMPLETE. THE ENGINEER SHOULD BE CONTACTED AND NOTIFIED OF THE CONSTRUCTION SCHEDULE. ,• 2 - �'� crx srrra ��,.N■.,� :� 4 ■°i °a vzn -.. x,.+0. - x `'"°' ,sw , o� ... u T � ` - J � VE, Y NATI YARD OR LANDSCAPED SURFACE INEND C P 3' MIN 6' MIN � 4. OUR DESIGN AND RECOMMENDATIONS ARE BASED OUR SITE ASSESSMENT, SOIL EVALUATION SUPPLIED OTHERS. SUBSURFACE OR SITE CONDITIONS -R� -r fi _ . `.L. \\ «I P.�.:,c� .,.7 4 • �'' p laif .. ]Yf6tH,b'4Ce .. _ M J .. , _ 4- AND UPON INFORMATION TO US BY IF ARE FOUND TO BE DIFFERENT FROM CONDITIONS ASSUMED OR INDICATED, WE SHOULD BE • - 4 wx.T�am 3, pNwa MEAN ` ''� } __ BACKFILL WITH SCREENED t_ I,JI FVEGATP 1' V ONSITE SOILS FREE OF ROCKS IN EXCESS I TOPSOIL I AYEP NOTIFIED TO EVALUATE ANY EFFECT ON THE PROPOSED OWTS. IF THE COUNTY REQUESTS CHANGES OR MODIFICATIONS TO THIS DESIGN, WE SHOULD BE CONTACTED TO EVALUATE `f}, �.awewn wlux aec :z �- ' . M - m n•ti ,wRu. / Lid .o� � .. uv :� %t>; Sk,. �; n' .'.� `.u,'""'ire 6�+9'm'W. .. RI aM , aw«•�Y n � .. - r 165353UiU75 - - -- {],fy 6" MIN. ��' ��' ��' OF 3" DIAMETER OR USE 3 4" TO 1.5' \ \ 12"-36" SCREENED ROCK \/ 5. AND RESPOND TO THE REQUEST. CONTRACTOR SHOULD REVIEW ANY CONDITIONS ON THE ISSUED PERMIT AND COORDINATE .:-„�" .:; yyiq' (ap l�]�t,�CI�LII 9aaiK® AP ffiA i�•.'m6'& J4 Ts �' Ilfl.]If . " �j , !' +• ..,,,'e- A ICHARl7rA 8 viCt{Y \ WITH THE ENGINEER REGARDING CONSTRUCTION OF THE SYSTEM. t p � -- UI 6" MIN EXCAVATED MATERIAL COMPACTED X/� I •: �, �,.p ,,:,� WOM`�f� ► tr [78ua 56 •' 191 a TO 90/a STANDARD PROCTOR /\ 12' FILTER FABRIC LEACHING >/ CHAMBER j\� BACKFILL LAYER NATURAL ONSITE 6 . IF YOU HAVE ANY QUESTION OR NEED ANY ADDITIONAL INFORMATION, P 10 LEASE CALL PAUL RUTLEDGE AT SOPRIS ENGINEERING, 704 0311. .�"rc.,°§e 16 --- I SOILS FREE OF ROCKS TITLE z <°fe^ .� ..n ;,,; -a .."ma"".mwo +>'.,z= �uq '' SS - R08114 G' It 4 MIN. .J!UDISTi!iiBED EARTH SANo�?Y f OVVTJ OWTS ' .,S .muro.IXMZlm""° aacR.y eu«w■wNw.ya". 0 .mar.{,: veo.Na� ,: �.. f -21853530100 " f SUITABLE BACKFILL OR CLASS 6 ROAD BASE I_ , t ,r, - SCARIFY/TILL BOTTOM SURFACE TO A DEPTH �L.I L 5A..1 SOIL. u o IN 3 OF ASTM 33 - F 3D � ROVEM IMPROVEMENT a t a ;m . :.. • - C s Bpgg549 . Yoh t; 218535423007 .{ oi COMPACTED SUBGRADE SAND NOTE ALL CHAMBERS IN EACH TRENCH MUST E INSTALLED ON LEVEL LEVELINGCCOURSE. CHAMB T B GRADE OVER 3" ASTM-33 FILTER SAND LEVELING COURSE. MAXIMUM DEPTH OF TRENCHES NOT TO EXCEED 36" BELOW PROPOSED PLAN PWIa, >. -, . r + TRENCH CROSS-SECTION FOR SURFACE GRADES. INLET AND END CAPS ARE TO BE INSTALLED ON EACH Know what's below. DRAWING NO. .�� r: ._:.. `°" ---� .>..:,..;._:.. ;, _ _ �' END CHAMBER ROW. IF EXCESSIVE LARGE COBBLES OR BOULDERS ARE F �' - 1{I+l,, SDR-35.26 OR SCHD-40 PIPES ENCOUNTERED IN ANY PART OF THE EXCAVATION, OVEREXCVATEAND Call before dig. you BACKFILL WITH SAND OR SUITABLE SCREENED NATIVE SOILS. CALL 2-BUSINESS DAYS IN ADVANCE C 1.0 SITE FEATURE AERIAL MAP BEFORE YOU DIG, GRADE, OR EXCAVATE PREVIOUS SUB-DIV PLAT CHAMBER TRENCH CROSS SECTION DETAIL FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES