Loading...
HomeMy WebLinkAboutApplicationGarfield County Community Development Department 108 8th Street, Suite 401 r/\N | " tfilfi"'E;UT;'rff81601 i www.garfield-countv.com BUILDING PERMIT APPLICATION T Commercial/M ulti-Family Demolition Manufactured Home or Tiny Home (Single or Multi-Level) Residential (SF, Duplex or Townhome)Reroof Dwel Unit - MAXIMUM SIZE OF SQUARE FEET nutrientfa rm. com / m ki n g horn @kconsu ltantsl lc. com Phone:(847 r754-1993Property Owner:Nutrient Holdings llc Mailing Address:PO Box 560, New Castle, CO 81647 EmaitAddress andY@ n utrientfarm. com / m ki n ghorn @kconsu ltantsl lc. com 847 754-1993 PO Box 560, New Castle, CO 81647Mailing Address: Phone:Contractor:Nutrient lncorporated Email Address:andy@ Phone.(970 )366-2478Architect:Mark Kinghorn Email Address:m ki n g horn @kcon su ltantsl lc. com 370 Maroon CT, New Castle, CO. 81647Mailing Address: 390-7673Phone: (970 )Engi neer. BREMA Engineering Mailing Address:783 Second Street, Eagle, CO. 81631 Email Address:.combre )Phone:(Manufactured Home lnstaller: Mailing Address: Email Address: Describe Work:1830 s.f. interior buildout of the office, mechanical, production area of an existing greenhouse Job Address:9115 County RD 335, New Castle, CO. 81647 Assessol's Parcel Number:218306100057 Sub. Owner's Valuation of Work:729,200.00 5q. Ft. of Building:9100 tolal-1823 work aroa Height: Property Size (Sq. Ft. or Acres): # of Floors: 1 Lot Block 255.38 22',-9" itioni Class of Work: Garage Attached Remodel/Alteration Detached lr ]WTSSeptic: I Propane OtherI Community ElectricType of Heat:Natural Gas mpt Permit #: Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. lf the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. lesal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be reguired: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Per{nit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. I hereby certify that I have read this Application and that the information contained above is true and correct, I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure{s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for residential uses are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the propert% described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. Driveway Permit: I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required information which is correct and accurate to the best of my knowledge. Mark Klnghom - OMe6 Rep.rt/arE frkg'loon 1t141202s Property Owner Print and Date Special Conditions: Manu. Home Fee:Misc. Fees: W'8.&q'.a8 Plan Check Fee: I LZq_16 Permit Fee: teg,A.Ls Sfin Balance Due: z54q.3t BP No:Im-%g OWTS No: 3to g-85Total Fees: const. rvUO flib.Setbacks:OCCGTouR: 6 5-66BUIIDING / PLANNING DIVISION : Date Gaffield County COMMERCIAL BUILDING PERMIT FEE ESTIMATE WORKSHEET lty ueveropment uepartment 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970194s-82t2 www.ga rf iel d-cou ntv.com cant: Nutriet Ho ings, LLC e: Project Address: 9115 CR 335 ubdivsion Lot:Block: Type of Occupancy Type of Construction Square Feet Price per Sq. Ft. B VB 2080 st24.L8 Total Valuation $258,294.40 Breakdown of Fee Calculations: B Occupancy in VB Construction 206.96x.6=9124.18 Road lmpact Fee 52523 per 1000 square foot $zszE x 2.08=5s247.84 ***All fees are estimates until final plan review is completed*** 5r,224.7OPlan Review Fee s1,884.1sBuilding Permit Fee Septic Fee (OWTS) 55,247.84Other (Ex: Road lmpact Fee) This Section Determined by Garfield County Total Fees Due