Loading...
HomeMy WebLinkAboutElectrical PermitL137123,9:30AM Print Permit 6|1u.m A.xtsef2 77oAttffis OK COLORADO STATE ELECTRICAL BOARD ELECTRICAL PERMIT NUMBER: 967365 Date Paid:31-JAN-23 Expires On: 3I--JAN-24 For inspections, click the 'Request lnspection' link on the permit list screen Eaker, Andrew Scott EAKER ELECTRIC, LLC 1.796 ANVIL VIEWAVE RTFLE, CO 8L650 Daytime Phone: (970) 456-5745 Power Supplier: XCEL Owner Name: NUTRIENT HOLDINGS Address: 333 NUTRIENT FARM RD City: NEW CASTLE, CO. Registration Number: LOO492 Trim Permit:N NUTRIENT FARM FAX COMMERCIAL COMMERCIAL NEW Driving Directionsi Exit l-70 at New Castle exit. Cross bridge heading south towards County Road 335. Turn left, going east towards River Bend Subdivision. Property on left side (South side)of County Road 335. Large green house. Description: Green House lnstall service gear being fed by a permanent generator. lnstall various branch circuits for general power and control requirements. lnstall sub feeds for office trailers. NOTICE: DO NOT coNrAcrrHE DENVER oFFrcES REGARDTNG rNSpEcloN SCHEDULING. CONTACT YOUR INSPECTOR FOR SCHEDULING INFORMATION. lnspector Norman Feck Emai I : norman.feck@state.co.us Phone: 303-869-3M2 Cost of work: $80,000.00 Fee Amount: $540.00 https://www.dora.state.co.us/pls/real/ep_web_permit_gui.print_permit?p_session_id=3738440&p_app_id=767870 1,t2 COLORADO STATE ELECTRICAL BOARI) L560 Broadway, Suite 1.350 Denvero CO 80202 Inspection Report Date lnspected: 03/09 12023 Permit #: Permit Holder: Site: Owner: 967365 Eaker Electric, LLC Andrew Eaker 1796 AnvilView Ave Rifle 81650 Phone: (970) 456-5745 Fax: Email: Eakerelectric@outlook.com 333 Nutrient Farm Rd New Castle, Garfield County, Nutrient Holdings Status Partial lnspection Type: Rough ln NEW COMMERCIAL lnspector:Norman Feck 303-869-3442 Corrections: 250.50, 250.52A3,250.53A2 Where no electrodes are present at a building or structure, a ground ring, ground rods, pipes, plates, or other suitable electrode shall be installed. Chip to concrete encased electrode in building. Do not sever but use a hinge type clamp. Not typically required to supplement ufer but the continuos 20'of rebar can't easily be confirmed so supplement with 2 ground rods. Leave the rebar connection open for inspection. Comments: 1) HDPE UG ok from generator pad to building MDP 2) HDPE UG ok from MDP to office trailers west side of building 3) HDPE has PVC fittings and the adheisve used was shown to be listed for these transitions. 353.6