HomeMy WebLinkAbout Engineering Revised 05.05.25861-E N Dean Road
Auburn, AL 36830
P: 360.566.7343
PROJECT NUMBER:25.003.ASP
DATE:
PROJECT MANAGER:Shane Adams, P.E.
May 5, 2025
STRUCTURAL CALCULATIONS
PREPARED FOR
FOR
PARACHUTE, COLORADO
ASPEN FOUNDATION REPAIR
HAYDEN INVESTMENTS STRUCTURE
FOUNDATION REPAIR
193 BUDS WAY
861-E N Dean Road
Auburn, AL 36830
P: 360.566.7343
Aspen Foundation Repair
PO Box 1913
Rifle, Colorado 81650
RE: Foundation Repair - 193 Buds Way, Parachute, Colorado
PROJECT BACKGROUND
Image 1: Front Elevation
Project No.:25.003.ASPMay 5, 2025
We understand the structure is a commercial building and the owner wishes to stabilize a portion of
the foundation. It is our understanding (21) 2 7/8 inch diameter push piers and (2) 3 1/2 inch diameter
push piers have been recommended by the contractor to provide additional foundation support. A
recent field sketch (attached) indicates the proposed locations of repair.
GEOLOGIC SETTING
SUMMARY
Based on our scope of work, determing the design load on the piers, the ultimate load requirement for
the 288 push piers is 28000 lbs. We recommend the piers with a 2 7/8 inch shaft be installed to a
minimum installation pressure of 3000 psi, or refusal, using a 9.62 square inch hydraulic ram.
Additionally, the ultimate load requirement for the 350 push piers is 54000 lbs. We recommend the
piers with a 3 1/2 inch shaft be installed to a minimum installation pressure of 5700 psi, or refusal,
using a 9.62 square inch hydraulic ram.
The existing structure is located in Parachute, Colorado. Based on the information provided by the
USDA Web Soil Survey, the general site condition in the area is comprised of silty loam and the site is
relatively flat.
Regards,
Shane Adams, P.E.
Stark Foundations
REVISED CONTRACTOR-PROVIDED FIELD SKETCH
Date:5-May-25
Foundation Repair Designed by:SHA
193 Buds Way
Parachute, Colorado
Project No.:25.003.ASP
Code(s):
International Building Code (IBC) 2021
International Residential Code (IRC) 2018
ASCE 7-16
Design Loads:
Dead:Soil:
Roof =15 psf Allow Lateral Bearing Pressure =100 psf/ft
Chimney =45 psf Active Pressure =60 psf/ft
Third Floor =15 psf
Second Floor =15 psf
First Floor (4'' Conc. Slab) =50 psf
Walls =12 psf
8" Foundation Wall =100 psf
Soil =110 psf
Live:
Roof (Snow) =30 psf
Roof Live Load =-psf
Third Floor =40 psf
Second Floor =40 psf
First Floor (4'' Conc. Slab) =100 psf
Wind: (not applicable)
Exposure =C Risk Category =II
Wind Speed, V =115 mph Kzt =1
Gust Factor, G =0.85 Kd =0.85
Int. Pressure Coefficient, GCpi =-0.18 Kz =1
Ext. Pressure Coefficient, Cp =0.8 Height, hz =30 ft
Design Wind Pressure:Design Load Combo =D + 0.6W
where:pw =qz (GCp - GCpi)ω =0.6
qz =0.00256 Kz Kzt Kd V2
Therefore:
qz =28.8 psf
pw =24.7 psf
Factored Wind Pressure, p'w =14.8 psf (say 15 psf)
PR
O
J
E
C
T
Design Criteria
Date:5-May-25
Foundation Repair Designed by:SHA
193 Buds Way
Parachute, Colorado
Project No.:25.003.ASP
Vertical Design Loads:
Tributary Widths:
Dead:
Roof =30 ft ------->450 plf
Third Floor =0 ft ------->0 plf
Second Floor =0 ft ------->0 plf
First Floor =2 ft ------->100 plf
Walls =8 ft ------->96 plf
Foundation Wall (height) =5 ft ------->500 plf
Soil (height) =2 ft ------->220 plf
ΣDL =1366 plf
Live:
Roof (snow) =30 ft ------->900 plf
Third Floor =0 ft ------->0 plf
Second Floor =0 ft ------->0 plf
First Floor =2 ft ------->200 plf
ΣLL =1100 plf
Max Pier Spacing or Trib =6 ft
Pier Working Loads:
PDL =8196 lbs
0.75*PLL =4950 lbs
Working Load, PTL =14000 lbs
Ultimate Load, PULT =28000 lbs
Pier Design:
Pier Type:Push Pier
Bracket:FS288BL2 Bracket Cap =24000 lbs Therefore OK
Shaft Diameter:2.875"
Installation Pressure, P:
Qult =2 (PTL)Qult =Acyl (P)
28000 lbs
Acyl =9.62 in2
Therefore, PREQ =Qult / Acyl
3000 psi
PR
O
J
E
C
T
288 Push Pier Design - Worst Case
where Acyl = working area of
the dual bore installation
Date:5-May-25
Foundation Repair Designed by:SHA
193 Buds Way
Parachute, Colorado
Project No.:25.003.ASP
Vertical Design Loads:
Tributary Widths:
Dead:
Roof =30 ft ------->450 plf
Third Floor =0 ft ------->0 plf
Second Floor =0 ft ------->0 plf
First Floor =2 ft ------->100 plf
Walls =8 ft ------->96 plf
Foundation Wall (height) =5 ft ------->500 plf
Soil (height) =2 ft ------->220 plf
ΣDL =1366 plf
Live:
Roof (snow) =30 ft ------->900 plf
Third Floor =0 ft ------->0 plf
Second Floor =0 ft ------->0 plf
First Floor =2 ft ------->200 plf
ΣLL =1100 plf
Max Pier Spacing or Trib =12 ft
Pier Working Loads:
PDL =16392 lbs
0.75*PLL =9900 lbs
Working Load, PTL =27000 lbs
Ultimate Load, PULT =54000 lbs
Pier Design:
Pier Type:Push Pier
Bracket:FS350BL2 Bracket Cap =37000 lbs Therefore OK
Shaft Diameter:3.5"
Installation Pressure, P:
Qult =2 (PTL)Qult =Acyl (P)
54000 lbs
Acyl =9.62 in2
Therefore, PREQ =Qult / Acyl
5700 psi
PR
O
J
E
C
T
350 Push Pier Design - Worst Case
where Acyl = working area of
the dual bore installation
NO REVISIONS BY DATE
861-E N DEAN RD
AUBURN, AL 36830
P: 360.566.7343
www.starkfoundations.com
SHA
FRONT ELEVATION
SHEET TITLE
STAMP PROJECT
CLIENT
SHEET NUMBER
DRAWN BY:
ISSUED:PROJ NO.:
CHECKED BY:ASPEN FOUNDATION
REPAIR
PO BOX 1913
RIFLE, CO
25.003.ASP
FOUNDATION REPAIR
HAYDEN INVESTMENTS
193 BUDS WAY
PARACHUTE, CO
SA
04.02.25
1 FIELD REVISIONS TLD 05.05.25
S1.0
’”±
FDN REPAIR PLAN
NO REVISIONS BY DATE
861-E N DEAN RD
AUBURN, AL 36830
P: 360.566.7343
www.starkfoundations.com
SHA
FRONT ELEVATION
SHEET TITLE
STAMP PROJECT
CLIENT
SHEET NUMBER
DRAWN BY:
ISSUED:PROJ NO.:
CHECKED BY:ASPEN FOUNDATION
REPAIR
PO BOX 1913
RIFLE, CO
25.003.ASP
FOUNDATION REPAIR
HAYDEN INVESTMENTS
193 BUDS WAY
PARACHUTE, CO
SA
04.02.25
1 FIELD REVISIONS TLD 05.05.25
S2.0
DETAILS