HomeMy WebLinkAboutObservation of Excavationr,FNkkR�,. y 2789 Riverside Parkway Client: Rob Ashcraft
Grand Junclian, CO, 81501 PO Box 867
Huddleston-Berry
(970) 255•8005 Carbondale
Engineering & Testing, LLC
l esrn+x+r wn CO 81623
SOIL OBSERVATION REPORT
Project: Parcel 239503309026 Appr gal:
Project Nu m be r: 02585 - 0001 Technician: nanuelAragon teviewed black
Fr
Work Order No: 86767 3bservation Date: July 12, 2023 Review Date: July 25, 2023
Geotechnical Report Title: Parcel 239503309026
Geotechnical Report Author: HBET
Geotechnical Report No & Da 5-0001 12/7/2022
Geotechnical Report Bearing Capaclt sf: 2000
Development or Lot Specific Re rt: Lot , tc
Sub -Contractor: Rob Ashcraft
On Site Notification:
Foundation Type: Footing / Stem Wall
Proof -roll equipment: Walk behind trench compactor
Excavation Limits, ft: by
Soil Type Observed: class 6 N EGauge & Date of Calibration: 17410 9/9/22
E
roposed Type of Structural Fill for Next Lift: NA c Density Counts: 1568
c
0
Anticipated Thickness of Structural Fill, ft: 0 U Moisture Counts: 610
FXI
Lance below Existing Ground and location of measurement, in: Municipality: Glenwood
*Surveying and elevation validation are outside of the scope of work and were not performed by HBET.
Lab #: 23-0421 Max. Dry Density, pcf: 134.5 Opt. Moisture, %: 6.5
laterial Classification: 3/4" base course
Location
LL
v
N
y=
D a
ai
w
c
o a
Q
F
m
>
�
N
IL
c
CSv
1 Not Applicable
0
0
Proof -roll
2 N spot footing
0
0
132.2
6.7
6
98%
3 S spot footing
0
0
128.2
7.2
6
95%
4 South Section
0
0
129.0
7.5
6
96%
5 West Section
0
0
131.1
5.8
6
97%
Com m ents:
Proctor Type: D1557 C
Specification: 95 , -2 to +2 D1557
Y u
Remarks /
rn
Rock Corrected Proctor Values:
Pass
Not Applicable
Pass
134.5 pcf @ 6.5 % Moisture
Pass
134.5 pcf @ 6.5 % Moisture
Pass
134.5 pcf @ 6.5 % Moisture
Pass
134.5 pcf @ 6.5 % Moisture
0
1913
2789 Riwrside Parkmy Client: Rob Ashcraft
Huddlestan-Berry Grand Junction, CO, 81501 PO Box 867
Enginecring.Y� rc,vtiog, LLC' ts7oizaseoos Carbondale
In40.7011W CO 81623
SOIL OBSERVATION REPORT
Project: Parcel 239503309026 Approval: On -going Testing is Required
Project Number: 02585 - 0001 Technician: Emanuel Aragon teviewed by: Pam black
Work Order No: 86767 observation Date: July 12, 2023 Review Date: July 25, 2023
Geotechnical Report Title: Parcel 239503309026 Sub -Contractor: Rob Ashcraft
Geotechnical Report Author: HBEr On Site Notification:
Geotechnical Report No & Date: 02585-0001 12/7/2022 Foundation Type: Footing / Stem Wall
Geotechnical Report Bearing Capacity, psf: 2000 Proof -roll equipment: Walk behind trench compactor
Development or Lot Specific Report: Lot Specific Excavation Limits, ft: by
Soil Type Observed: class 6 nGauge & Date of Calibration: 17410 9/9122
N L�
E
roposed Type of Structural Fill for Next Lift: class 6 0 Density Counts: 1568
c
Anticipated Thickness of Structural Fill, ft: 1 v F 7x Moisture Counts: 610
Lance below Existing Ground and location of measurement, in: Municipality: Glenwood
* Surveying and elevation validation are outside of the scope of w ork and w ere not performed by HBEf.
Lab #: 23-0421 Max. Dry Density, pcf: 134.5 Opt. Moisture, %: 6.5 Proctor Type: D1557 C
laterial Classification 3/4" base course Specification: 95 , -2 to +2 D1557
N rT+ y
w Location: _ .N U
my p'a
Remarks
a URock Corrected Proctor or Values: aO g gN
1 Not Applicable 1 0 Proof -roll Pass Not Applicable
2 North Section -1 0 131.3 7.2 6 98% Pass 134.5 pcf @ 6.5 % Moisture
3 East Section -1 0 129.7 6.3 6 96% Pass 134.5 pcf @ 6.5 % Moisture
4 South Section -1 0 129.9 6.8 6 97% Pass 134.5 pcf @ 6.5 % Moisture
5 West Section -1 0 132.4 6.2 6 98% Pass 134.5 pcf @ 6.5 % Moisture
Com m ents:
7-' 2
2769 Riwrside Parkmy
Client: Rob Ashcraft
Grand Junction, CO, 81501
= Huddleston-Berry
PO Box 867
(970) 255-8005
4E Engineering & Testing, LLC:
Carbondale
�_S lnfIwCi7iR41d1!]Mry[pn
CO 81623
SOIL OBSERVATION REPORT
Project: Parcel 239503309026
Approval: On -going Testing is Required
Project Number: 02585 - 0001 Technician: Emanuel Aragon
teviewed by: Pam black
Work Order No: 86676 observation Date: July 7, 2023
Review Date: July 25, 2023
Geotechnical Report Title: Parcel239503309026
Sub -Contractor:
Geotechnical Report Author: HBET
On Site Notification: Rob Ashcraft
Geotechnical Report No & Date: 02585-0001 12/7/2022
Foundation Type: Footing / Stem Wall
Geotechnical Report Bearing Capacity, psf: 2000
Proof -roll equipment: Walk behind trench compactor
Development or Lot Specific Report: Lot Specific
Excavation Limits,ft: by
Soil Type Observed: class 6
toEIGauge
& Date of Calibration: 17410 9/9/22
roposed Type of Structural Fill for Next Lift: class 62
E
Density Counts: 1568
Anticipated Thickness of Structural Fill, ft: 2
c
0
Moisture Counts: 604
Lance below Existing Ground and location of measurement, in:
Municipality: Glenwood
*Surveying and elevation validation are outside of the scope of work and were not
performed by HBET.
Lab #: 23-0421 Max. Dry Density, pcf: 134.5 Opt. Moisture, %: 6.5 Proctor Type: D1557 C
laterial Classification: 3/4" base course Specification: 95 , -2 to +2 D1557
w Location:
1 Not Applicable
2 North Section
3 East Section
4 South Section
5 West Section
Comments:
u
r
G7
Qs
a
m
oca
T
°a
c'
m
a, -
p
-2
0
Proof -roll
-2
0
127.9
5.8
6
95%
-2
0
131.6
7.2
6
98%
-2
0
133.0
7.0
6
99%
-2
0
129.4
5.5
6
96%
to u
Remarks /
Rock Corrected Proctor Values:
Pass
Not Applicable
Pass
134.5 pcf @ 6.5 % Moisture
Pass
134.5 pcf @ 6.5 % Moisture
Pass
134.5 pcf @ 6.5 % Moisture
Pass
134.5 pcf @ 6.5 % Moisture
7-7
tituNr�
C
Huddleston-Be
ht Engineering & 'resting, LLC
2789 Riverside Parkway
r Grand Junction, CO, 81501
J (970) 25"005
nlo��,ud�m,ast�rnGwn
SOIL OBSERVATION REPORT
Client: Rob Ashcraft
PO Box 867
Carbondale
CO 81623
Project: Parcel 239503309026
Approval: On -going Testing is Required
Project Number: 02585 - 0001 Technician: Alex Brown
teviewed by: Pam black
Work Order No: 86628 31lbservation
Date: July 5, 2023
Review Date: July 25, 2023
Geotechnical Report Title:
Parcel239503309026
Sub -Contractor:
Geotechnical Report Author:
HBET
On Site Notification: Rob Ashcroft
Geotechnical Report No & Date:
02585-0001 12/7/2022
Foundation Type: Mono -Slab
Geotechnical Report Bearing Capacity, psf:
2000
Proof -roll equipment: Walk behind trench compactor
Development or Lot Specific Report:
Lot Specific
Excavation Limits, ft: by
Soil Type Observed:
Native (CL)
N
nGauge
&Date of Calibration: 4335 9/9/22
E
roposed Type of Structural Fill for Next Lift:
Gass 6
0
�
Density Counts: 2603
Anticipated Thickness of Structural Fill, ft:
1
c
0 0 Moisture Counts: 711
Lance below Existing Ground and location of measurement, in:
Municipality: Glenwood
*Surveying and elevation validation are outside of
the scope of work and were not
performed by HBET.
Lab #: 22-0946 Max. Dry Density, pcf:
105.5 Opt. Moisture, %:
15.5 Proctor Type: D698 A
laterial Classification: (CL)
Specification: Proof -Roll
#
Location: >
N
a o a to o
N
o a c' m a Remarks /
F m
Rock Corrected Proctor Values:
0
1 Bottom of footing excavations -3
- Proof -roll
Pass No Deflection Observed
2 Northeast Section -3
30 116.2 9.5
.. .. .. ....
6 98% Pass 118.5 pcf @ 11.5 % Moisture
3 North Section -3
10 106.1 12.3
6 97% Pass 109.8 pcf @ 14.2 % Moisture
4 Center of House -3
20 110.7 14.5
6 97% Pass 114.2 pcf @ 12.8 % Moisture
5 West Section -3
10 106.3 13A
6 97% Pass 109.8 pcf @ 14.2 % Moisture
Comments: Did 2 additional Tests @ the South
West and East areas of the pad as well. South West= 102.0@14.4% w / a 0% coreection
needed -AND- East= 114.9@11.5 w / a 30% correction.
7•-5-23
JrtFF 2789 Riverside Parkway
Grand Junction, CO, 81501
1 Huddleston-Berry
Engineering St 'Pelting, LLC (970)255-8005
� nG�lyxkilesfrnlranti�nrn
REVIEW of CONSTRUCTION
Client: Rob Ashcraft
PO Box 867
Carbondale
CO 81623
Project: Parcel 239503309026 Type of Work: Soil
Project Number: 02585 - 0001 Technician: Jesse Lueras Reviewed by: Jesse Lueras
Work Order No: 86530 Observation Date: June 28, 2023 Review Date: June 28, 2023
General Contractor:
Subcontractor:
Explanation:
On Site Notification:
A representative of Huddleston Berry Engineering and Testing (HBET) arrived on site as requested to observe the open
hole excavation. Contractor did not scarify and moisture condition the bottom along with the excavation not being wide
enough at the northwestern section of the trenches. There were also large boulders that required removal. Reinspection
required.
Diagrams: