Garfield County
BUILDING PERMIT
APPLICATION
TYPE OF CONSTRUCTION
Commercial/M u lti-Family I Demolition
I Manufactured Home or Tiny Home (Single or Multi-Level)
Residential (SF, Duplex or Townhome)Reroof
Accessory Dwelling Unit (ADU) - MAXIMUM S|ZE OF 1,200 SQUARE FEET
INVOLVED PARTIES
Property Owner:Rick Tomlinson phone:(970 )319-5649
Mailing Address 3371 County Road 313, New Castle, CO 81647
Ema it Address: sherick500@msn.com
contractor: Alpine Roll-Off Services Phone: ( 970
)
640-7058
Mailing Address:13 Powerline Road, Rifle, CO 81650
Email Address ka itlyn@a I pinerolloffs.com
Architect:nla Phone: ( )
Mailing Address:
Email Address:
Engineer . nla Phone:
Mailine Address:
Email Address
Manufactured Home lnstaller: hh Phone:(
Mailing Address:
Email Address:
PROJECT DETAIIS
Describe Work:Demo and Haul off Mobile Home Unit
Job Address:3369A County Road 313, New Castle, CO 81647
Assessor's Parcel Number:
Sub.
239921300012
Lot Block
Owner's Valuation of Work: Property Size (Sq. Ft. or Acres)
Sq. Ft. of Building Height:f of Floors:
Class of Work:New Remodel/Alteration Addition
Garage:Attached Detached
Docusign Envelope lD: 7C6C3178-709C-4FF3-9964-44A60E6D095E
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have
provided the required information which is correct and accurate to the best of my knowledge.
Signed by:
Kc[ fa'nnUrn"sow 05t22t25
Property Owner Print and Sign Date
Type of Heat:
Septic:
PROJECT DETAI[S CONTINUED
Community
ral Gas Propane Electric Other
Driveway
Permit:
NOTICE
AuthoriU. ThisapplicationforaBuildingPermitmustbesignedbytheOwneroftheproperty,describedabove,
oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby
the Owner, must be provided with this Application.
Lesal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (L) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
lherebycertifythatlhavereadthisApplicationandthattheinformationcontainedaboveistrueandcorrect. I
understand that the Building Division accepts the Application, along with the plans and specifications and other data
submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness
of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as
Owner, to construct ihe structure(s) anci faciiities cietaiieci on the submittais revieweci bythe Buiiciing Division. in
consideration of the issua nce of the Building Permit, I agree that I and my agents will comply with provisions of a ny
federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and
applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for
residential uses are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building
Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the
structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other
applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring
the correction of errors in the submittals, ifany, discovered after issuance; or (2) stopping construction or use ofthe
structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this
Application, including submittals, and inspections of the work by the Building Division do not constitute an
acceptanceof responsibilityorliabilitybytheCountyof errors,omissions,ordiscrepancies. AstheOwner, I
acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with
me and my authorized agents, including without limitation my architect designer, engineer and/ or builder.
Permit #:
OFFICIAL USE ONtY ?o.'sfD
Special Conditions:I
Alli.'c+ael llalr ra+iaa.^iYipi ""''""Dl-h ali^-|, E^^.'#'trrflri=Darmi+ Eaa.'F5S*er"ina*.' U^*a Eaa'.\t\
J R
nniar Eaar."'f5lR
Total FEes:sff)"ec''s'$".*,Balance Due:#5 "e'o
BP No: "
Oxrro-gZ*S
Setbacks: ^\\ t r\l\ I I t--1,
ottktilof+'"ft\'|"ff'zflrlc:
BUILDTNG / PTANNTNG DtVtStON :
a:---l A ----.,-aJ16l lEu APPI rrv.ll
v t
Docusign Envelope lD: 7C6C31 78-709C-4FF3-9964-A4A60E6D095E
ASBESTOS ABATEMENT NOTIFICATION and PERMIT APPLICATION FORM
FEE MUST ACCOMPANY THIS FORM. INCOMPLETE APPLICATIONS WILL BE RETURNED.
Colorado Deparment
of Public Heal*r
rndfnvimnmenr
Submit form to:
Permit Coordinator
Colorado Dept. of Public Health
and Environment
APCD-IE-81
4300 Cherry Creek Drive South
Denver, CO 80246-1530
Phone: 303-692-3100
Fax: 303-782-0278
asbestos@state.co.us
Public and Comme rcial Building, School, and Single-Family
Residential owAtino: > 260 LF or 160 SF or a S5aallon drum
Courtesy Notice
Non-Public Access Notice
Notice
30-Dav P&C/SFRD Permit
90-Dav P&C/SFRD Permit
365-Dav P&C/SFRD Permit
Phase
Phase
of Multiple
Permit #
$0
$80
$80
$400
$800
$1200
$80
code 100
LI
I code 190/292 I Ll
code 165/267
I code 177 ] Ll
t code 1 05
code 1 10
Single Family Residential Dweiling (SFRD)
> 50 LF or 32 SF or a 55-gal. drum, but < 260 LF or 160 SF or a S5gallon drum
Courtesv Notice
Non-Public Access Notice (Opt Out)
Notice
30-Dav Permit
90-Dav Permit
365-Day Permit
Notice or Permit Transfer
$0
$60
$60
$180
$300
$420
$55
code 200
code 205 I Ll
code 210
code230ll I
code290ll I
code 265
I code 1 80/280 ] Ll
Building Owner
Owner Name
Contact
Street Address
Zip code
Fax #()
Disposal Site
Landfill Name
Street Address
Zip code
CDPHE Use Only
Approved by:
PM req'd?
N W
Date lssued:
State
State
City
City
Postmark or Delivery date
Form of Payment & #
Record #
Telephone #()
Permit#
Abatement Site
Building Name
Specify location in the building where work will take place (e.9. floor, room, wing, etc.)
Street Address
Zip code
Cell Phone #()
Project lnformation
End Date
End Time
AM PM
Check the day(s) of operation: Sun MTuWThFSantntrnn
Type of ACM: TSl, Texture, VAT, etc.
55 gal. Drums
County
Square Feet / Type
Building Contact
Start Date
Start Time
PM
AM
City
Emergency?YN NN
Linear Feet / Type
Abatement Contractor
Company Name
Street Address
Zip code
Fax #()
CO. Cert #
Project Personnel
CO Project Mgr. Name
CO Project Designer #
CO Project Designer Name
CO Project Designer #
Registration #
A.M.S. Name
CO A.M.S. Cert #
State
Project Supervisor
Consulting Firm Name
City
Telephone #()
Cell Phone #()
Cell Phone #()
Cell Phone #()
Please describe below the work practices and procedures to be employed in conducting the abatement of asbestos. BE SPECIFIC. lndicate type(s) of ACBM to be abated (e.9. VAT,
ceiling tile, TSl, etc.). Use another page if necessary.
Fom: AANPA08 Rw. 01/30/2008
Docusign Envelope lD: 7C6C31 78-709C-4FF3-9964-A4A60E6D095E
Asbestos PermiUNotice Application Form lnformation and Instructions:
1. There is a 10 working-day advance notification requirement for permit applications. Day 1 is the 1't business day following the
postmark or hand-delivery date. (Working Day means Monday through Friday and including holidays that falls on any of the days
Monday througFr Friday.)
2. lf you wish to request a deviation from Colorado Regulation No. 8. Part B, a Variance Request Form must be completed and
submitted to the Division with a $50 review fee. Variances must be submitted on the Division's form to be accepted.
3. Please be specific on the types of materials to be abated and the work practices to be used.
4. All spaces must be filled in on the permit. lf the information is not applicable, please write N/A. lncomplete informaiion may result in
a delay in processing the application, which may delay your project.
5. ln the "Abatement Site' box, we must have a building contact telephone number on the permit application before it can be processed.
This must be someone other than the GAC or its employee who can provide the Division access to the site if the GAC is not on site.
6. lf there needs to be modifications to the notice after the application has been submitted, notify the Asbestos Unit by fax at 303-782-
0278 or e-mail at asbestos@state.co.us before the end of the next regular state business day following the modiiication. Project
modifications include changes in scope of work, AMS, supervisor, the scheduled work dates or scheduled work t mes. Please use
the PermiUNotice Modification Form.
7. Supporting digital photographs or documentation may be e-mailed to: asbestos@state.co.us
8. Prior to the start of any asbestos abatement in an area of public access of a non-school building, in which the amount of asbestos-
containing material to be abated exceeds 1,000 linear feet on pipes or 3,000 square feet on other surfaces, a Project Designer
certified under Regulation No. 8, Part B, shall develop a written project design.
9. Prior to the start of any asbestos abatement in a school building in which the amount of friable asbestos-containing material to be
abated exceeds 3 linear feet on pipes or 3 square feet on other surfaces, a written project design shall be developed by a Project
Designer certified under these regulations, in accordance with paragraph lV.G.7 of Regulation No. 8, Part B.
10. A Project Manager is required on all projects where the amounts of friable asbestos-containing materials to be abated exceed 1,000
linear feet and/or 3,000 square feet. The Project Manager requirement may be waived; please see section lll.8.6 of the CAQCC's
Regulation No. 8, Part B, for more information.
11. All provisions of laws and ordinances governing this type of work shall be complied with whether specified herein or not. Abatement
permits or approval notices appearing to give authority to violate or override the provisions of any other laws or ordinances shall be
invalid. Furthermore, abatement permits or approval notices issued in error or based upon incorrect information supplied to the
Division shall also be invalid.
Fom: AANPAoS R* 0lA0/2008
Docusign Envelope lD: 7C6C31 78-709C-4FF3-9964-A4A60EOD095E
GENERAL INFORMATION
ON ASBESTOS
What is Asbestos?
Asbestos is the name given to a number of naturally occurring minerals that have been
mined for their useful properties such as thermal insulation, chemical and thermal stability,
and high tensile strength. The types of asbestos that are regulated are: Chrysotile,
Amosite, Crocidolite, Anthophyllite, Tremolite, and Actinolite. Asbestos deposits can be
found throughout the world and are still mined in South America, Australia, Canada, South
Africa, and the former Soviet Union.
Why is Asbesfos a hazard?
Asbestos is made up of microscopic bundles of fibers that may become airborne when
disturbed. lf these fibers get into the air, they can be inhaled into the lungs where they
may cause significant health problems. Researchers still have not determined a "safe
level" of exposure but we do know that the higher the concentration of fibers and the
longer the exposure, the greater the risk of contracting an asbestos-related disease. Some
of these health problems include:
. Asbestosis - a lung disease that causes scarring of the lungs. Eventually, this
scarring may become so severe that the lungs cannot function. The latency period
(meaning the time between the exposure and the onset of disease) is often 25-40
years.. Mesothelioma - a cancer of the lining of the lung and chest and/or the lining of the
abdominal wall. Asbestos exposure is one of the few causes of this cancer. The
latency period for mesothelioma is often 15-50 years.
. Lung Cancer- Lung cancer can be caused by exposure to asbestos. A person has
a much greater chance (50 to 84 times greater) of developing lung cancer if they are
exposed to asbestos and they smoke. Cancer of the gastrointestinal tract can also be
caused by asbestos exposure. The latency period for these cancers is often 15-30
years.
Despite the common misconception, eposuretoasbestos fibers does not cause
headaches, upper respiratory irritation or other immediate symptoms. As mentioned
above, the effects often go unnoticed for 15-50 years.
When is Asbesfos a hazard?
Asbestos-containing materials (ACM) in good condition should not pose ahazard to building
occupants. lf these materials can be maintained in good condition, it is recommended that
they be left alone and periodic surveillance performed to monitor their condition. lt is only
when ACM is disturbed or the materials become damaged that it becomes ahazard. When
the materials become damaged, the fibers separate and may then become airborne. ln the
asbestos industry, the term 'friable' is used to describe an ACM that can be reduced to
powder by hand pressure. 'Non-friable'means an ACM that is too hard to be reduced to
powder by hand pressure. Mechanical grinding, sanding and dry-buffing are some ways of
causing non-friable materials to become friable.
COLORADO
Revised 3/24115 1tffi
Docusign Envelope lD: 7C0C3178-709C-4FF3-9964-A4460E6D0gSE
Where Can Asbesfos Be Found?
Asbestos was, and still is, used in building materials for a variety of reasons. Asbestos
fibers are incredibly strong and have properties that make them resistant to heat, chemical
damage and insulate against electricity as well as adding durability to a product. Asbestos
was added to thermal and acoustic insulation, fireproofing, roofing products and flooring.
Some of the more common products that may contain asbestos include.
ustical Plaster rative Plaster
Wasn't Asbesfo s Ban ned?
There are common misunderstandings about an Environmental Protection Agency (EPA) ban
on ACM products or uses from 1989. Many sources incorrectly report that all asbestos-
containing products have been banned. ln 1991, the U.S. Fifth CircuitCourtof Appeals
vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA.
Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing,
or distribution in commerce of many asbestos-containing product categories was set aside and
did not take effect. Six asbestos-containing product categories are still subject to the 1989
asbestos ban. However, EPA has no existing bans on other asbestos-containing products or
uses. Products manufactured in other countries may also contain asbestos and can be
imported into the United States.
EPA does NOT track the manufacture, processing, or distribution in commerce of
asbestos-containing products. lt would be prudent for a consumer or other buyer to
inquire as to the presence of asbestos in particular products. Possible sources of that
information would include inquiring of the dealer/supplier or manufacturer, refer to the
product's "Safety Data Sheet" (SDS), or consider having the materialtested by an
accredited laboratory before installing it in your building.
For More Information, please eontact:
Asbestos Compliance Assistance Group
Phone: (303) 692-3100
Fax: (303) 782-0278
Toll Free: 1-800-886-7689
Web page: www. colorado. gov/cdphe/asbestos
Email address: cdphe.asbestos@state.co.us
cotoFAno
)eco Uoint Comoounds
Adhesives and Mastics )uctwork Flexible Fabric Connections lLaboratorv Gloves
Asphalt Floor Tile !lectric Wirino lnsulation lLaboratorv Hoods/Table Toos
Base Flashing Electrical Cloth lPacking Materials (for wall/floor
lpenetrations)
Blown-in lnsulation Electrical Panel Partitions lpi
lot
pe lnsulation (corrugated air-cell,
ock. etc.)
Boiler lnsulation Elevator Brake Shoes lRoofinq Felt
Breaching lnsulation Elevator Eouioment Panels iRoofino Shinoles
Carpet Backinqs Fire Blankets lspackling Compounds
Caulking/Putties Fire Curtains lsprav-Applied I nsulation
Ceilinq Tiles and Lav-in Panels Fire Doors lTapino Compounds (thermal)
Cement Pipes Fireproofing Materials lTextured Paints/Coatinqs
Oement Sidinq Floorinq Backinq lThermal Paper Products
Oement Wallboard Heatinq and Electrical Ducts Minvl Floor Tile
0halkboards
Oonstruction Mastics (floor tile, carpet
-^:l:-- r:r^ -r- \Jcil[tg Urtr, gtu,,
High Temperature Gaskets lVinvl Sheet Floorinq
High Temperature Paper Products [VinylWall Coverings
I
Oooling Towers HVAC Duct lnsulation lwallboard
Revised 3/24115 2 t^ffi
Docusign Envelope lD: 7C6C3178-709C-4FF3-9964-,A4460E6D095E
ffiTEOFCOLORADC
Bill Owens, Governor
Dennis E. Ellis, Executive Director
Dedicat€d to protecting and lmproving th€ health and envlronm€nt ol the psople of Colorado
4300 Cherry Creek Dr. S, Laboratory $ervices Divlsion
Denver, Colorado 80246-1530 81 00 Lowry Blvd.
Phono {30s) 692-2000 Denver, Colorado 80230-6928
TDD Llne (303) 69.1-200 (303) 692-3090 Colorado DeparrmentLocated in Glendale, Colorado ofpubficftealthhttp://www.cdphe.6tate.co.us andfnvironment
BUILDING RENOVATION AND DEMOLITION
WI{AT YOU NEED TO KNOW!
Are you Remodeling, Renovating or Demolishing?
Yo.q are subiest to,Slate,andEslleral Regulations requiring_inspection for asbestos. Avoid penalties and
delays: have your project inspected for asbestos by a Coforado-ce(ifled asbestos building inspector before
commencing work.
It is illegal to improperly disturb asbestos containing materials!
Asbestos can be found in these and other common building materials: Ceiling texture$, vinyl floor coverings
and mastic, boiler and pipe insulation, heating and cooling duct insulaiion, ceiling tile, roofing products,
elapboard shingles, etcetera, These materials are regulated; a certified asbestos inspector can determine
which materials contain asbestos and which are regulated. Buildings ol any age may contain asbestos; even
those newly built may have asbestoscontaining materials,
For ALL Renovation Projects:. Buildings of any age may contain asbestos; even those newly built may have asbestos containing
materials.. lnspection: the structures/components to be disturbed rnusf be inspecfed for asbestos by a state-
certified asbestos inspector. Contact CDPHE or go to ourweb site for a current list of Asbestos lnspectors
http:/Aulvw._e-dphe,stale.cg.tlp/ao/asbeshom.qgp or Asbestos Building lnspector Consulting firms can be
found in the yellow pages section of most telephone books, under the heading "Asbestos Consulting and
Testing".. lf the amount of asbestos-containing material to be disturbed exceeds the following trigger levels than an
abatement contractor must remove the material.o Trigger levels means amounts of material as follows:. With regard to single-family residential dwellings, the trigger levels are 50 linear feet on
pipes, 32 square feet on other surfaces, orthe volurne equivalent of a S5-gallon drum.
' With regard to all areas other than single-family residential dwellings, the trigger levels are
260linear feet on pipes, 160 square feet on other surfaces, orthe volume equivalent of a
55-gallon drum.r A certified removal contractor (General Abatement Contractor) must remove asbestos-containing materia{s
that are regulated or may become regulated before they ate disturbed by renovation or demolition
activities. Conlact CDPHE or go to our web site for a current list of General Abatement Contractors
httB://wrlt|"!y,p.dphejitateso.us/ap/asbeshom.asp or Contractors can be found in lhe yellow pages section of
most telephone books, underthe heading 'Asbestos Abatement".o Notification: A written notlfication to CDPHE, payment of a notification fee and ten (10) working clay
waiting period is rec;uired before the removal (abatement) of regulated asbestos containing materials.
Page 1 of 3
J:\Asbosbs and Lead Unlts\Asbesbs Foms\CoPHE\Renovaff on and Demolltlon.doc
Docusign Envelope lD: 7C6C3178-709C-4FF3-9964-44460E6D095E
All asbestos abaterilent and demolition permit application form$ are available from our web site or by callingthe asbesios program.
I-.nVE YOLIR PRQJHCT IIISPECTED BY A COLORANO-CHRIIF I Eil ASBSSTCIS
BffiFORH YOU EEGINB {"Jl LDI l{ G I I'ISFECTOR
msnet$ry psnaltie.$ and project rJelays.
' Regulated asbestos-containing waste material must be disposed of at an approved aebestos wastedisposat site.
Demolitions, Destrucflve salvage, Hous e [vlovinglf you demolish, perform destructive salvage, perform de-construciion, burn, des-troy, dismanle, clynamite,implode, knock down, level' pult down, pilveiize, raze, teai clovun, wreili '"rr-oi
a' etructure or structuratcontponents or you move a house you are subjec't to staie and Fedeial negutations even when there is Noasb€Btor in tho faclfity.
Prior to Demolitian:
' lnspection: the building mast be insneclT.tt.foyllfsgtos by a state.certified asbestos inspector. contact
9DPHE or go to our web site for a cunent rist of Asbestos tndpectors
orAsbestosBuiIdinglnspectorConsultinglirmscanbe
found in the yellow page section of mom6Fone uoor.s,-unoerthe heading,Asbestos consulting andTesting''.
" Asbestos Removal (if.necessary) must be performed by a colorado-certifled GeneralAbatementcontractor. Any'asbestos coniaining material that is irialrte or will be made friabte Juring demolitionactivities must be removed prior to demolition. Removit, in accoroance with Regulation No. g, is required ifthe amount of asbestos-containing material that is friable or *itt n""o*e rriaote o-uiing demolition exceedsthe trigger tevets.o lEttlflgq!.i9,q gf DelTplitio$ Fqrm must be subrnitted to the cDpHE, evsn if no asbesto$ rwas foundduring the inspection, payment of a notification fee and ten ilo) wcrrlring day waiting period is requiredbefore the demolition can proceed.
During Demolitian:
' Recycling af materials, such as concreie or woocl, that are bondecl or contaminaied with asbestos-containing maieriar (AcM), such ag floor tire or mastic, is NbT permitted." Demplition of a building that has non-friahle asbestos containing. vAT or tar-impregnated rooflng materialsremaining must be completed without eausing the asbestos-containing materials to become friable.concrele floors covered with floor tile shall he removed in as large. sections as possible. operations suchas crushing, pneurnaiic jacking, etc. of matsrinis containin[ aiidstos ui* *i p,i*iiiuc.o when imploding or burning a structure, ALL aehestor-.oni"ining material, regardless of quantity, must beremoved prior to demolition.
Fs r Nlsre dsEforrma ti,o n, pre€se e& ffitect:
Asbestos Compliance Assistance, Groun
Asbestos and Demoliiion permit Coordinatsr
Phsne: i303) 6pE-S100
Fax: i303) 7&2-AZT?
Toll Free: 1-8fi0-Ag6-7689
Web.page: atgjlryIry=
E ma il aeldre ss: gs-he$as(Aglat j,go_.jJg"-*
Vio{ation of asbestos negufintisns cen !"ost!trt in
J:lqsbdsbs snd Lrad unrsBsl,esbs Forms\corro***** fif,$"?"?ollr.1
Docusign Envelope lD: 7COC31 78-709C-4FF3-9964-A4460E6D095E
STATE OF' COLORADO RENOVATION/DEMOLITION
FACT SHEET
Prior to ANY renovation or demolition in any public and commercial building that may disturb
greater than the trigger levels of a suspect asbestos-containing material (ACM), an inspection
must be performed to determine if abatement is required.
Trigger Levels
Single-family residential dwelling - 32 square feet
(SFRD) 50 linear feet
The volume of a 55-gallon drum
All other areasexcluding a SFRD - 160 square feet
260 linear feet
The volume of a 55-gallon drum
Individuals performing these inspections shall be State of Colorado certified Building
Inspectors.
The inspection, sampling and assessments of the suspect materials must be performed as
required by Colorado Regulation No. 8, Part B.
Buildings, or those portions thereof, that were constructed after October, 12,1988 shall
be exempt from inspection requirements IF an architect or project engineer responsible
for the construction of the building or a State of Colorado certified Building Inspector,
signs a statement that no ACM was specified as a building material in any construction
document for the building or that no ACM was used as a building material in the
building.
Building Inspectors must be independent of the General Abatement Contractor (GAC)
who will be abating any asbestos found.
Abatement, in accordance with Regulation No. 8, is required if the amount of ACM that
will be disturbed in connection with the renovation exceeds the trigger levels.
ANY ACM that is friable or will be made friable during demolition activities MUST be
removed prior to demolition. Removal, in accordance with Regulation No. 8, is required
if the amount of ACM that is friable or will become friable exceeds the trigger levels.
A permit for abatement of friable ACM or demolition of a building, or a notice for the
removal of non-friable ACM, must be applied for and received from the Division prior to
commencing the activity.
o Abatement and Demolition application forms can be obtained from:
r www.cdphe.state.co.us/aplasbeshom.asp
o Completed applications, along with the requisite fee, can be submitted to:
r Permit Coordinator, CDPHE, APCD-SS-B1, 4300 Cherry Creek Drive S.,
Denver, CO 80246-1530, (303) 692-3100 by mail or in person
There is a 10 working day waiting period from the postmark or hand-delivery date to start
work on a project requiring a permit or notice.
a
a
a
a
a
a
a