HomeMy WebLinkAboutCold Formed Steel Framing ReportsActivity Date:08/30/2024 Technician:Downing, Thomas
Placement Location:
Building A, cold formed steel framing observation, level 1 to level
2. Between gridlines A to U, from 1 to 36 line
Plans/Details:
AO Drafting, Inc, Job # GLENWOOD, dated March 1, 2024. Sheet
S210, S410, S420
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe the cold formed steel framing for the level 1 to level 2 framing for building "A".
Items inspected included layout and spacing of structural members, and screw size and layout. All framing inspected today
was erected per approved drawings and standard construction practices.
✔
✔
Field Observation Report FOR000001Report #:
08/30/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F391
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 4Page 1 of 3
Activity Date:08/30/2024 Technician:Downing, ThomasPlacement Location:Building A, cold formed steel framing observation, level 1 to level2. Between gridlines A to U, from 1 to 36 line Plans/Details:AO Drafting, Inc, Job # GLENWOOD, dated March 1, 2024. SheetS210, S410, S420Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe the cold formed steel framing for the level 1 to level 2 framing for building "A".
Items inspected included layout and spacing of structural members, and screw size and layout. All framing inspected today
was erected per approved drawings and standard construction practices.
Images:
Comments:Typical header framing at corridor Comments:Typical framing at corridor
✔
✔
Field Observation Report FOR000001Report #:
08/30/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F391
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 4Page 2 of 3
Activity Date:08/30/2024 Technician:Downing, ThomasPlacement Location:Building A, cold formed steel framing observation, level 1 to level2. Between gridlines A to U, from 1 to 36 line Plans/Details:AO Drafting, Inc, Job # GLENWOOD, dated March 1, 2024. SheetS210, S410, S420Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes NoGeneral Remarks:As requested, a site visit was made to observe the cold formed steel framing for the level 1 to level 2 framing for building "A".Items inspected included layout and spacing of structural members, and screw size and layout. All framing inspected todaywas erected per approved drawings and standard construction practices.Images:
Comments:Typical header framing at corridor Comments:Typical framing at corridor
Comments:Typical corridor framing
✔✔
Field Observation Report FOR000001Report #:
08/30/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F391
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 3 of 4Page 3 of 3
Activity Date:08/30/2024 Technician:Downing, Thomas
Placement Location:
Building A, level 2 steel pan deck. Between gridlines A to U, from 3
to 36 line
Plans/Details:
AO Drafting, Inc, Job # GLENWOOD, dated March 1, 2024. Sheet
S211, S410, S420
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe the level 2 steel pan deck for the north half of building "A". Items inspected
included screw size and layout of screw patterns. All pan decking inspected today was erected per approved drawings and
standard construction practices.
✔
✔
Field Observation Report FOR000002Report #:
08/30/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F391
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 4Page 1 of 3
Activity Date:08/30/2024 Technician:Downing, ThomasPlacement Location:Building A, level 2 steel pan deck. Between gridlines A to U, from 3to 36 line Plans/Details:AO Drafting, Inc, Job # GLENWOOD, dated March 1, 2024. SheetS211, S410, S420Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe the level 2 steel pan deck for the north half of building "A". Items inspected
included screw size and layout of screw patterns. All pan decking inspected today was erected per approved drawings and
standard construction practices.
Images:
Comments:Typical screw spacing at panel overlap Comments:Typical screw spacing at perimeter
✔
✔
Field Observation Report FOR000002Report #:
08/30/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F391
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 4Page 2 of 3
Activity Date:08/30/2024 Technician:Downing, ThomasPlacement Location:Building A, level 2 steel pan deck. Between gridlines A to U, from 3to 36 line Plans/Details:AO Drafting, Inc, Job # GLENWOOD, dated March 1, 2024. SheetS211, S410, S420Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes NoGeneral Remarks:As requested, a site visit was made to observe the level 2 steel pan deck for the north half of building "A". Items inspectedincluded screw size and layout of screw patterns. All pan decking inspected today was erected per approved drawings andstandard construction practices.Images:
Comments:Typical screw spacing at panel overlap Comments:Typical screw spacing at perimeter
Comments:Typical screw spacing at panel overlap
✔✔
Field Observation Report FOR000002Report #:
08/30/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F391
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 3 of 4Page 3 of 3
Activity Date:09/12/2024 Technician:Downing, Thomas
Placement Location:
Building A, cold formed steel framing observation, level 1 to level
2. Between gridlines U to PP, from 1 to 36 line
Plans/Details:
AO Drafting, Inc, Job # GLENWOOD, dated March 1, 2024. Sheet
S210, S410, S420
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe the cold formed steel framing for the level 1 to level 2 framing for the south half
of building "A". Items inspected included layout and spacing of structural members, and screw size and layout. All framing
inspected today was erected per approved drawings and standard construction practices.
✔
✔
Field Observation Report FOR000003Report #:
09/12/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F391
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 4Page 1 of 3
Activity Date:09/12/2024 Technician:Downing, ThomasPlacement Location:Building A, cold formed steel framing observation, level 1 to level2. Between gridlines U to PP, from 1 to 36 line Plans/Details:AO Drafting, Inc, Job # GLENWOOD, dated March 1, 2024. SheetS210, S410, S420Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe the cold formed steel framing for the level 1 to level 2 framing for the south half
of building "A". Items inspected included layout and spacing of structural members, and screw size and layout. All framing
inspected today was erected per approved drawings and standard construction practices.
Images:
Comments:Typical header framing at corridor Comments:Typical framing at corridor
✔
✔
Field Observation Report FOR000003Report #:
09/12/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F391
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 4Page 2 of 3
Activity Date:09/12/2024 Technician:Downing, ThomasPlacement Location:Building A, cold formed steel framing observation, level 1 to level2. Between gridlines U to PP, from 1 to 36 line Plans/Details:AO Drafting, Inc, Job # GLENWOOD, dated March 1, 2024. SheetS210, S410, S420Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes NoGeneral Remarks:As requested, a site visit was made to observe the cold formed steel framing for the level 1 to level 2 framing for the south halfof building "A". Items inspected included layout and spacing of structural members, and screw size and layout. All framinginspected today was erected per approved drawings and standard construction practices.Images:
Comments:Typical header framing at corridor Comments:Typical framing at corridor
Comments:doorway framing detail
✔✔
Field Observation Report FOR000003Report #:
09/12/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F391
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 3 of 4Page 3 of 3
Activity Date:11/18/2024 Technician:Downing, Thomas
Placement Location:
Building C, interior partition wall cold formed steel framing
observation
Plans/Details:
AO Drafting, Inc, Job # S KINGC, dated June 24, 2024. Sheet
S210, S410, S420, S430, S440
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe the cold formed steel partition wall framing for Building "C". Items inspected
included layout and spacing of cold formed steel partition wall framing, and screw size and layout. Any missing screws in
partition framing were installed in our presence during todays inspection. All framing inspected today was installed per
approved drawings and standard construction practices at the conclusion of our inspection. The general contractor was
notified of our observations. Additional site visits will be scheduled with our office when required.
✔
✔
Field Observation Report FOR000004Report #:
11/18/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F391
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 4Page 1 of 3
Activity Date:11/18/2024 Technician:Downing, ThomasPlacement Location:Building C, interior partition wall cold formed steel framingobservation Plans/Details:AO Drafting, Inc, Job # S KINGC, dated June 24, 2024. SheetS210, S410, S420, S430, S440Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe the cold formed steel partition wall framing for Building "C". Items inspected
included layout and spacing of cold formed steel partition wall framing, and screw size and layout. Any missing screws in
partition framing were installed in our presence during todays inspection. All framing inspected today was installed per
approved drawings and standard construction practices at the conclusion of our inspection. The general contractor was
notified of our observations. Additional site visits will be scheduled with our office when required.
Images:
Comments:Typical partition framing at bottom channel Comments:Typical partition framing at top channel
✔
✔
Field Observation Report FOR000004Report #:
11/18/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F391
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 4Page 2 of 3
Activity Date:11/18/2024 Technician:Downing, ThomasPlacement Location:Building C, interior partition wall cold formed steel framingobservation Plans/Details:AO Drafting, Inc, Job # S KINGC, dated June 24, 2024. SheetS210, S410, S420, S430, S440Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes NoGeneral Remarks:As requested, a site visit was made to observe the cold formed steel partition wall framing for Building "C". Items inspectedincluded layout and spacing of cold formed steel partition wall framing, and screw size and layout. Any missing screws inpartition framing were installed in our presence during todays inspection. All framing inspected today was installed perapproved drawings and standard construction practices at the conclusion of our inspection. The general contractor wasnotified of our observations. Additional site visits will be scheduled with our office when required.Images:
Comments:Typical partition framing at bottom channel Comments:Typical partition framing at top channel
Comments:Typical partition framing at top channel Comments:Typical partition framing at doorway header
✔✔
Field Observation Report FOR000004Report #:
11/18/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F391
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 3 of 4Page 3 of 3