HomeMy WebLinkAboutOWTS Design ReportProposed Single-Family OWTS System Onsite Wastewater Treatment System Design 3-BR Single-Family Residence TBD Rapids View Lane New Castle, CO 81,647 Parcel No. 2181-013-07 -021 Prepared for: Jason Minasian TBD Rapids View Lane New Castle, CO 81647 Muyo 2025 Prepared by: Digitally $igned by Jeremy Gilliam Date: 2025.A513 12:50:41-06'00' $Ilest Water En g i n eeri n g .4 Environrnental Consulting Se-vices 2516 Foresight Circle #1, Grand Junction, CO 81505 Telephone: (970)241-7076 1.0 SCOPE This report presents the findings of an On-Site Wastewater Treatment System (OWTS) design for a proposed three-bedroom (3-BR) single-family residence at Parcel # 218l-043-07-021(TBD Rapids View Lane) in New Castle, Colorado. The purpose of this report was to establish design critena for a new OWTS system. The report includes an assessment of observed subsoil and groundwater conditions, percolation test results, and the design and construction parameters for the OWTS. The findings are based on data gathered from field percolation testing, and engineering evaluation informed by experience with similar site conditions. 2.0 DESIGN SUMMARY 1. Encountered subsurface conditions consisted of I foot of topsoil underlain by 3 feet of silty clay underlain by gravelly sand (<35oh rock) to the maximum depth explored of 8 feet below ground surface (Appendix A). Groundwater was not encountered at the time of observation to 8 feet below ground surface. 2. The average percolation result was 9.9 minutes per inch. We determined from Table l0-1 of Garfield County's On-Site Wastewater Treatment System Regulation (Regulations) the treatment area soil type to be Type I and used "Long Term Acceptance Rate" (LTAR):0.80 gallons per day per square foot. . 3. The design system will utilize a new 1,000 gallon septic tank, which will discharge effluent to four new (4) Quick 4 Plus Infiltrator trenches, each with nine (9) units, for atotal minimum disturbed area of about 24 feetby 39 feet. 4. Design placement based on setbacks and comparison to minimum requirements, which must be confirmed prior to installation by the licensed installation contractor 3.0 EXISTING SITE CONDITIONS The Z.}-acre parcel located at TBD Rapids View Lane was barren lot with minimal vegetation. The lot is relatively flat and is in a developing subdivision of single-family residences. 4.0 PROPOSED SITE IMPROVIMENTS A proposed 3-BR single-family residence and detached plumbed garage is to be constructed. The structures will have no below grade/basement areas. If the proposed construction is different than what is described above, WestWater Engineering should be notified to re-evaluate the recommendations made herein. The new 3-BR dwelling and accessory buildings will be served by a new 1,00O-gallon septic tank (minimum) and a total of 36 new Standard Plus Quick4Infitrator@ units configured in four (4) trenches, each with nine (9) Q4 Plus units for a minimum 24' x 39' footprint including 4 feet separation distance between trenches and chamber end caps (FigureB2). 5.0 SOIL INVtrSTIGATION WestWater Engineering collected soil and percolation data on Apnl22,2025, in accordance with the Regulations. The soil profile in the vicinity of the proposed Soil Treatment Area (STA) shows topsoil I foot below ground surface underlain by 3 feet of silty clay underlain by gravelly sand (<35o/o rock) to the maximum depth explored of 8 feet below ground surface. No groundwater was encountered at the time of observation (Appendix A). Percolation rates ranged from 13.8 to 7.3 minutes per inch (Appendix A). WestWater Engineering finds the average percolation rate of 9.9 minutes per inch to be most applicable. Based on the Garfield County, On-Site Wastewater Treatment System Regulations effective Apnl2O,2023, Table l0-1, the soil type was determined as Soil Type l,Long Term Acceptance Rate (LTAR):0.80 gallons per day per square foot which most nearly describes the condition for this site and proposed construction. 6.0 OWTS WASTEWATER DESIGN FLOW As per guidelines, the occupancy is 6 persons, tabulated as 2 people per bedroom for the first 3 bedroom. The design flow is 6 persons x 75 gallons per day per person : 450 gallons per day (see Table 6-l of the Regulations). 7.0 OWTS DESIGN Septic Tank The minimum septic tank capacity required to service atotal of three (3) bedrooms is 1,000 gallons in accordance with Table 9-1 of the Regulations. The minimum required septic tank volume will provide a 48-hour (Z-day) particle detention time for the wastewater flow capacity of the proposed OWTS. The required capacity of 1,000 gallons exceeds the estimated daily wastewater flow of 450 gallons per day (GPD) over a two-day period (450 GPD x 2 days : 900 gallons), ensuring compliance with the Regulations. The tank shall be equipped with locking or sscured access lids to prevent unintended access. Distribution Box For this design, use a new distribution box (D-box) approved for use in Garfield County. Ensure that the flow is equal between laterals by using flow equalizers in D-box and access is available for maintenance and inspection via an approved riser assembly with locking lid. Soil Treatment Area (STA) Silty clay occurring atthe 3.0-foot depth interval will be used for the upper infiltrative surface for the proposed STA (Figure B3). Maximum trench depth must not exceed 4 feet in accordance with the Regulations. Trench excavation will remove approximately 3.0 feet of soil and upper root mass to prepare the level surface for installing infiltrators on the receiving soil infiltrative surface, providing secondary treatment of discharged wastewater. Soil should not be wet at the time of excavation. Soils covering the STA must be crowned over proposed trenches or match the existing grade so water runs off and is not ponded over any area of the STA. Prior to backfilling the final soil cover, a pervious soil barrier of non-woven geotextile fabric (2 ozlyd2 minimum) or similar pervious mateial shall be installed over the STA to prohibit soil intrusion. All setback distances in accordance with the Regulations are applicable to septic system installation. The following design calculations propose to discharge septic tank effluent to four (a) Quicka Plus Infiltratortrenches, each with nine (9) units, for atotal minimum disturbed area of about24 feet by 39 feet. A total of 36 Quick 4 Standard Plus Infiltrator units will be installed in the four- trench configuration, which is generally oriented east to west. It should be noted that other manufacturers of infiltrators can be used, but use of alternative systcm components will rcquirc verification by the Engineer to determine conformance with design requirements for this system. Desian FlowSTA= L xMethodxMedia (1) (2) Where: STA: f)esign Flow: LTAR: Method: Media: Total surface area required to effectively discharge sewage effluent Estimated volume of wastewater per day Long-Term Acceptance Rate of soil treatment area Method of effluent application and type of soil treatment area Type of distribution media STA Total chambers - ctlamber Area Where Chamber Area: The County and State approved bottom chamber area for Quick 4 Plus Standard Infiltrator IJnit, 12 ft2 rf Per Regulations Table 6-1, Design Flow : 450 Gallons/Day Long Term Acceptance Rate (LTAR) review of Regulations Table 10-1, LTAR: 0.80 Gallons/Day Eoot2 Type of application is chosen as gravity fed trench system, per Regulations Table 10-2, Method: 1.0 Distribution media is chosen as chambers? per Regulation Table l0-3, Media:0.7 Then, 450 STA - mt L.O xo.7 The minimum STA Area is 393.75 ft2 393.75Total Chambers = T (1) (2) The minimum number of Quick 4 Plus Infiltrators is 32.8. As 32.8 Infiltrators cannot be evenly divided between four trenches to ensure equal effluent flow, the design increases the number of Quick 4 Plus Infiltrators to a total of 36, divided between four trenches with nine (9) units each. 8.0 SYSTEMINSTALLATIONREOUIREMENTS The installer should confirm the feasibility of gravity discharge of sewage effluent from the proposed residence to the STA. If field measurements do not confirm the design assumptions for gravity discharge of sewage effluent from the proposed residence to the STA, or if the installer does not consider the above design assumptions practical, please contact the design engineer to address any design modifications necessary for the effective operation of the OWTS. The installer must also confirm all setbacks from property lines, building envelopes, and existing easements aremaintained. Additionally, any unknown utility lines, easements, or other adverse conditions disclosed during construction must maintain at the required minimum setbacks. All sewer pipe couplings must be completed with primed and glued or bell and spigot joints using 4-inch SDR 35 PVC pipe. Schedule 40 PVC 4-inch pipe with a minimum 1-foot soil cover must be used if pipe is installed in a vehicular iraffrc crossing. Drain-waste-vent @WV) rated Schedule 40 PVC pipe is called out for crossings but may also be used instead of SDR 35 PVC pipe. Building sewer pipe must be installed at a slope between %-inch and V+-inch per foot slope (1 to 2o/o), preferably using lhe V+-inch per foot slope as recommended by the International Plumbing Code (IPC) as administered by the County. Fittings shall be sweep 90-degree curyes or two (2) 45-degree elbows at all influent pipe turns. Fittings must be DWV for schedule 40 PVC pipe. Two-way clean-outs are required between dwelling and tank and beyond tank where pipe lengths exceed 100-feet from tank to STA and at all pipe bends greater than 45 degrees. Clean outs shall be installed with screw caps at finished gradewith a protective housing for easy access by homeowner. The installer must adhere to minimum and maximum depth requirements for the STA. System components must be placed on native soils or re-stabilized soils, as specified by the engineered OWTS reports, in excavated areas. The owner will ultimately be responsible for septic system maintenance including pumping the septic tank once every 2-3 yews and cleaning the effluent filter (if applicable) every 6 months. 9.0 SYSTEM INSPECTION WestWater Engineering is responsible for inspecting the OWTS to ensure construction conforms to the design plan and meets all aspects of County Regulations, including: o Inspect and measure the system before backfilling, including piping and septic system components. o Complete the as-built drawing of the system and submit it to Garfield County for approval. o Reviewing and approving any submitted changes necessary for installation of the OWTS as deemed necessary by the owner or their contractor. Any system changes installed by the owner/contractor that were not approved by Engineer arelhe responsibility of the ownef. 1O.O DESIGNLIMITATIONS The OWTS design is based on site-specific soil conditions and percolation data collected in the vicinity of the proposed STA and local experience of designing OWTSs in Colorado. The design is only valid for the proposed new OWTS serving the proposed 3-BR dwelling at the referenced location provided in this report. WestWater Engineering assumes no liability for inaccurate information or conditions that vary from the design assumptions listed above. Additionally, WestWater Engineering is not responsible for the quality of work for any person(s) or entity performing or supporting construction activities relating to the project or for any contractor's failure to furnish or perform its work in accordance with the plans, specifications or the Regulations. The owner/contractor is to notifr WestWater Engineering and/or Garfield County immediately if actual site conditions differ from those described herein. Please do not hesitate to contact us if you have any questions regarding this report. APPEIIDIX A SOILS AI\D PERCOLATION DATA Q\lest Water E n g i n ee ri n g e consulting Engineers & Scientisis 2516 FORESTGHT CIRCLE, #1 GBAND JUNCTION, COTORADO 8X505 {970} ?4? -7075 - FAX (970} 24t-7097 SOILS AND PERCOLATION REPORT Date May 1,2025 Consultant:Curtis Beckel, EIT WestWater Engineering 2516 Foresight Circle #1 Grand Junction, CO 81505 (e70) 24t-7076 Client:Jason Minasian Land Parcel: TBD Rapids View Lane, New Castle, CO 87647 2r8t-043-07-021 SECTIONl_SOILSLOG One test pit was evaluated at the empty 2.}-acre parcel for an onsite wastewater treatment system (OWTS) that will serve a new proposed 3-BR single-family dwelling located at TBD Rapids View Lane, New Castle, Colorado. The Test Pit (TP-1) was located approximately 75 south of the north property line and 45 feel east of the west property line (see Figure Bl of the Design Report). The benched test pit was in general conformance with Figure Al with a maximum depth of 8 feet (96 inches) below ground surface. The visual description of the profile soils, with ASTM D 2488 used for guidance, is summarized below and in Table I - Log of Exploratory Test Pit. AI Table 1 - Log of Exploratory Test Pit TBD Rapids ViewLane New Castle, Colorado Location: See Figure B-l Date:4-22-25 Depth (f0 Description Interval Notes 0 Stifq dry, tan and grey, low plasticity, silty CLAY 0-1'Topsoil Stifq dry, brown,low plasticity, silty CLAY t-4' Dense, dry, grey and brown, gravelly SAND with cobble (Alluvium) Total Depth: 8 feet below ground surface 4-8',5 Subsurface conditions encountered in the test pit consisted of one foot of silty clay topsoil underlain by three feet of silty clay underlain by gravelly sand to the maximum depth explored of 8 feet below ground surface. The silty clay topsoil was stifl dry, tan and grey. The silty clay was stiff, dry and brown. The gravelly sand was dense, dry, grey and brown with maximum grain size neanng 3 inch (cobble) indicative of Alluvium deposit (<3s%rock). No groundwater was encountered at the time of observation. A2 SECTION 2 _ PERCOLATION TEST Three standard percolation rate tests were performed at the site referenced. TP-l contained 3 percolation test holes, approximately I foot in depth each, herein referred to as P-l,P-2 and P-3. P-l was located in TP-l at ground surface in silty clay topsoil.P-z was located in TP-l at2 feetbelow ground sur ce in silty clay. P-3 was located in TP-1 at 4 feet below ground surface in gravelly sand. All percolation holes were saturated}4 hours before testing. The percolation rates encountered were 13.8 minutes per inch in silty clay topsoil at the ground surface, 8.5 minutes per inch in a stratum of silty clay at2 feet below ground surface, andT .3 minutes per inch in silty sandy clay at 4 feet below ground surface. WestWater Engineering finds the average percolation rate of 9.9 most nearly describes the behavior of the soils at the expected infiltration elevation of 3 feet below ground surface. A3 PERCOLATION TEST RESULTS TBD Rapids View Lane,New Castle SATURATION AND PREPARATION DATE: 4-21-2025 PERCOLATION TEST DATE: 4-22-2025 HOLE REFERENCE NO: P-l PERC HOLE DEPTH: Surface TIME INTERVALS: 10 minutes AVERAGE PERCOLATION RATE (MIN/INCH)13.8 TIME AT START OF INTERVAL START OF INTERVAL (rNcH) END OF INTERVAL (rNcH) WATER DEPTH CTIANGE (rNCH) PERCOLATION RATE (MIN/rNCr{) 0755 0 1 I 10 0805 1 2 I 10 0815 2 3,5 1.5 6.66 0825 ?5 4.75 1.25 8 0835 0 1.5 1.5 6.66 0845 1.5 2.5 I 10 0855 2.5 3.5 1 10 0905 3.5 4.25 0.75 t3.33 0915 4.25 5 0.75 13.33 0925 0 0.75 0.75 13.33 0935 0.75 1.5 0.5 20 0945 1.25 1.75 0.5 20 0955 1.75 2.25 0.5 20 1005 2.25 2.75 0.5 20 1015 2.75 3.25 0.5 20 1025 3.25 3.75 0.5 20 A4 HOLE REFERENCE NO: P-2 PERC HOLE DEPTH: 2feet TIME INTERVALS: l0 minutes TIME AT START OF INTERVAL START OF INTERVAL (rNCH) END OF INTERVAL 0NCH) WATER DEPTH CHANGE (rNcH) PERCOLATION RATE (MrN/rNCH) 0755 0 4 4 2.5 0805 0 J J J.JJ 0815 0 -t 3 3,33 0825 ^t 5.5 2.5 4 0835 0 2.75 2.75 3.64 0845 2.75 4.75 2 5 0855 0 2 2 5 0905 2 3.5 1.5 6.66 0915 3.5 4.75 r.2s 8 0925 0 t.25 t.2s 8 0935 1.25 2 0.75 13.33 0945 )2.75 0.75 13.33 0955 2.75 3.5 0.75 13.33 1005 3,5 4.2s 0.75 13.33 1015 4.25 5 0.75 13.33 1025 5 5.5 0.5 20 AVERAGE PERCOLATION RATE (MIN/INCH)8.5 A5 HOLE REFERENCE NO: P-3 PERC HOLE DEPTH: 4 feet TIME INTERVALS: 10 minutes TIME AT START OF INTERVAL START OF INTERVAL (rNCH) END OF INTERVAL (INCrr) WATER DEPTH CHANGE (rNCH) PERCOLATION RATE (MrN/rNCH) 0755 0 6 6 r.66 0805 6 9 J 3.33 0815 0 3,5 3.5 2.86 0825 3.5 5 1.5 6.66 0835 0 J J 0845 J 4.75 1.75 5.7r 0855 0 2.s 2.5 4 0905 2.5 3.5 I 10 0915 3.5 4.25 0.75 13.33 0925 0 r.75 t.75 5.71 0935 1.75 2.75 1 10 0945 2.75 3.75 I 10 0955 3.75 4.75 I 10 1005 4.75 5.75 I 10 1015 5.75 6.75 1 10 r025 6.75 7.75 I 10 AVERAGE PERCOLATION RATE (MIN/INCH)7.3 A6 APPENDIX B FIGURES 1 ,f, ( ,l { I I I \i i {v.-- --t <!'. ! ,ji{,. q-za<s APPRB} (rP-1).. I LOCATION OF NING 1 l-,HOLES 1,2 ,J (P-1,P-3) 14NE \ J .,. {\\ I\f.' (\ I PROPERW LINE coUW rGIS, \ MAY ) ,/ f \ ll\ I.-./ l"{l t'nt t '.*}/\ ;Y ) ) 4 J.I II -J (-'rj \)I Iet'J5 /_7^r-r f \- i J .{ l tr { I ( I I f' ./o ) > t ! J. 7 t,4 { z l f./-.- t. )o {( - 5510 -' ILr\ r' lA CHRISTTIAJASON \ tao 8t ) I $ i" 1r! (F'ER I {} 'i't jir J I I " /tl \l- I I \ I I :ji APPROXIMATE EXISTING 2n zdzsACRESGARFIELD ]s,)t- 7i ,u' ./I Pt a{Le' I ,rt 1,4 .t i -t \ /\ r'/il I a\ \ 1 n\ilestUUtkltA Englneering500 FIGURE 81 TBD RAPIDS VIEW I.ANE DflSnNG OWTI| SnE PLAl,l 25 16 Foresight Chcle, #1 Grand Junstio& CO 81505 e7a)241-7076SCALE: 1":100' 100 -7 3-BR t i / \;\; APPROXIMATE ROXIMATE LOCATION OF METER OF TP-1 {t ,- &4,V€,NEW . HORZ0 -45 BEND (rYP) NEW 4" SDR 35 PVC SEWER SERVICE (t=+z.s L.F.t,s=2%) i1'l I { ,'a I 0 .E L.F. I 0 I 0+1u5 I 0 .qkt I I i I .!-- I i I I t tlllJi i..' ,'l sf Lt{, !ss liI,' f,,ft' u'* t'! l I +, MIN 5, MIN FUTURE STA REPAIR AREA, 24,X39' NEW DISTRIBUTION BOX VFLOW CONTROL NEW 4" SDR S t t I I 5510 I ! l I I x { i," I 1 0 0 tt / n t 0t T fl 0 0 L I I I I :; i I PROPOSED GAR4GE VBATHROOM,.I -wAY CLE*Nbur (rfP)NEW 2 --3--/ ,f APPROXIMATE EXI$ING PROPERTY LINE'J- 2.0 ACRES (een OAnFIELD QOUNTY- 615;= tlrAV ZOZS) - - : ':tt;-=--t I \l{estYU?EI GEnglnccring 25 16 Foresight Circlg #l Grand Junction, CO 81505 FIGURE 82 TBD RAPIDS VIEW I-.ATIE IrnnpnsFn nwTs I aY-nl lT 50 ^ ^t r tll r^t 50 NEW 10" ROUND IRRIGATION VALVE BOX AT EACH PORT MOUNTED FLUSH WNH GROUN NEW 4" SCH 40 P/C OBSERVATION PORT WITH CAP (WP 'PROXIMATE EXISTING g.o' PLACE GEOTEKnLE OVER TNFILTRATORS (Typ) CROWN BACKFILL OVER TRENCHES 1.0'or) 4.0'o @ g GROUNDWATER- GREATER THAN 8.0' TRENCH NOTE: MA(IMUM DEPTH 4.0 FEET MINIMUM DEPTH 3.0 FEET INSTALI.ATION NOTES: FOLLOW MANUFACTURERS INSTRUCTION www.infiltrotorsystems.com SCREW PIPE TOP PORT CHAMBER FACEPHTE SCREW FACEPTATES AND UNITS TOGETHER INSTALL MONITORING PORTS TRENCH ENDS ALL FOUR BED CORNERS 36 Q4 INFILTMTORS (4) TRENcHES (e) uNrrs EAcH TRENcH PROVIDE LEVEL SCARIFIED SURFACE ACROSS LENGTH OF TRENCH(S), NOTTFY ENGTNEER IF TRENCH BOTTOM(S) ARE WEr 1) 2) 3) 4) 4.0'4.0'4.0' TOPSOIL 3o E a oz lt =U eec' FIGURE B5 owTs cRoss A\]{estY}rEll 4Englneerlng 2516 Foresight Circle, #l Grand Junctio4 CO 81505 (97O\241:t076 www.westwatefco.crm SCALE 1'=5' NN 24"A ACCESS HATCHES WrTH LOCKTNG/ SECURE TANK LIDS MTIVE BACKFILL COMPATED TO 952 MSHTO T-99 *2% OPTIMUM SOIL MOISTURE FINISHED GRADE OPTIONAL ORENCO (oR EOUTVALENT) 4" EFFLUENT FILTER NEW 4, SCH 40 PVC SEWER UNE (L:42.S'*, 5:-2.00%) TO STA DISTRIBUTION BOX NEW 4" SCH 40 PVC SEWER LINE NEW 4' SCH 40 ryC WYE/IEE NEW I,OOO GALLON SEPTIC TANK GRAVITY FLOW + FROM DWELLING NEW 7+" MINUS WASHED ROCK I I x { ^ i , * x HWL 4' AFF rO (\I g 'v-l .). rf, N 1,000 cAtLON SEP'TIC TAl,lK FIGURE 84 2516 Foresight Circle, #1 Grand Junctioru CO 81505 (910)241-7076 tvww"westwat€fco.com (a" tncH DEPTH MINIMUM) APPENDIX C GARFIELD COUNTY ON.SITE WASTE WATER TREATMENT SYSTEM REGULATIONS, TABLE 7-1 FROM THE 2023 REGULATIONDOCUMENT CODE OF COLORADO REGULANAN Water Quality Control Commission SCCR 10024jt Table 7-1 Minimum Horizontal Distances in Feet Between Gomponents of an On..Site Wastewater Treatment System lnstalled After November 15 1973 and Water and Health lm Features ieptic Tank, {igher Level freatment Unit, )osing Tank, /ault or Vault 3uilding Sewer or iffluent Lines iTA Trench, STA led, Unlined iand Filter, Sub- ;urface Dispersal )ystem, Seepage )it -ined Sand Filter -ined Evapo- ranspiration Field :r Outside of 3erm of Lined /Vastewater Pond 5 5 5 Septic Tank, Higher level treatment Unit, Dosing Tank, Vault or Privy 01 1A2 25 01 10 Dry Gulch, Cut Bank, Fiil Area (from Crest) 25 50 502 503 25 Lake, Water Course, lrrigation Ditch, Stream, Wetland 102 25 01 10 Subsurface Drain, lntermittent lrrigation Lateral, Drywell, Stormwater Structure 0101 102 10 10 10 Property Lines, Piped or Lined lrrigation Ditch, upslope curtain drain 0 10 10 51 Structure without basement, crawl space or footing drains 55 0 20 15 51 Structure w/basement, crawlspace or footing drains 102 56 252 102 102 Potable Water Supply Line 2 60 60 502 502 100 3 Spring, Well,1 Suction Line, Potable Water Supply Cisterna 43 FrG. C-1 CODE OF COLORADO REGULANON Water Quali9 Control Commission Jnlined Sand :ilter in SoilWith r Percolation Rate ilower than 60 vlinutes per lnch, Jnlined or )artially Lined ivapotrans- :iration System, )utside of Berm :f Unlined Nastewater Pond, lr System Not Relying on STA br Treatment )ther than \erosol ilit Trench -atrin Pit P iystem Not ?elying on STA br NOTE: The minimum distances shown above must be maintained between the OWTS components and the features described. \Mrere soil, geological or other conditions warrant, or upgrading of existing OWTS lvhere the size of lot predudes adherence to these distances, a repaired OWTS must not be closer to setback features than the existing OWTS, as' reviewed and approved by the local public health agency. Components that are not watertight should not extend into areas of the root system of nearby trees. 1 lncludes potable wells, inigation wells and monitoring wells set within a potable aquifer and infiftration galleries permitted as wells by the Division of Water Resources. 5 CCR 1002-tti) N/A 01 Septic Tank, Higher level treatment Unit, Dosing Tank, Vauft or Privy 10 Dry Gulch, Cut Bank, Fiil Area (from Crest) 15 25 10 100 253 Lake, Water Course, lrrigation Ditch, Stream, Wetland 25 25 0 Subsurface Drain, lntermittent lrrigation Lateral, Drywell, Stormwater Structure 2510 25 01 Property Lines, Piped or Lined lrrigation Ditch, upslope curtain drain 15 25 1255 Structure without basement, crawl space or footing drains 25 125 Structure Wbasement, crawlspace or footing drains 15252 502 142 Potable Water Supply Line 2 100 100 3 Spring, Well,1 Suction Line, Potable Water Supply Cisterna 100 4 FIG. C-2 CODE OF COLORADO REGULANON Water Quality Control Commission 5 CCR 100243 2 Crossings or encroachments may be permitted at the points as noted above provided that the water or wastewater conveyance pipe is encased for the minimum setback distance on each side of the crossing. A length of pipe with a minimum Schedule 40 rating [ASTM Standard D 3034-16 (2016 version)] of sufficient diameterto easily slide over and completely encase the conveyance must be used. Rigid end caps of at least Schedule 40 rating [ASTM Standard D 3034-16 (201 6 version)l must be glued or secured in a watertight the bottom of the encasement pipe. The area in which the pipe passes through the end caps must be sealed with an approved underground sealant compatible with the piping used. Other methods of encasement that provide equal protection are allowed. These methods must be reviewed and approved by the local public health agency. 3 Add eight feet additional distance for each 100 gallons per day of design flows between 1,0@ and 2,000 gallons per day, unless it can be demon$rated by a professional required to minimize contamination as part of the Division site application and permitting process. 4 All horizontal setbacks to a potable water supply ci$em must be met unless a variance by the Board of Examiners of Water Well Construction and Pump lnstallation 11.4 of the WaterWell Construction Rules, as applicable. The minimum horizontal setback that may be granted through a variance is to 25 feet. 5 lf the structure is not used as a habitable unit, the isolation may be reduced by the local board of health to no less than 50 feet. 6. Building sewer installations shall meet the design requirements of the Colorado Plumbing Code. 45 FrG. C-3