Loading...
HomeMy WebLinkAboutCommercial Plan Review ChecklistGarfield County BUILDING DEPARTMENT 1U8 Ltghth Street,swte 4U:1, trlenwood spflngs, CO SlNl Tel: (970) 945-8212 Commercial Plan Review Checklist Reference Buitding Code:2075,Re f 6q. Permit Number:L(-o -c'{ - z5 -\ZIO STEP 1:DETERMINE THE USE OR USES OF THE BUILDING a. Determine the appropriate occupancy classification(s) b. Check for potential incidental accessory occupancies c. Determine if the building, if a mixed-occupancy condition, was designed using the separated, non-separated or accessory occupancy provisions d. Review for fire sprinkler requirements based on occupancy classification and related factors e. Check for hazardous materials that will be used or stored within building ppren z:DETERMINE DETAI LED BUILDING ATTRIBUTES . Determine square footage per floor . Determine grade plane elevation . Determine height of building in feet . Determine height in stories above grade plane . Check for basements . Check for mezzanines, or confirm areas labeled as mezzanines . Determine lowest level of fire department vehicle access . Determine if building is required to be fire sprinklered or not [<f-sree e: DETERMTNE THE TYPE oF coNsrRucrloN STEP 4:DETERMINE LOCATION OF THE BUILDING ON THE SITE ffiet"r^ine amount of open frontage E/Determine fire resistance of exterior walls E- Determine protection of openings $ tdentify any assumed property lines between two buildings on the same lot 6 Review projections STEP 5:DETERMINE ALTOWABLE BUILDING SIZE A. Determine tabular building height and area B. Calculate height increases in stories C. Calculate height increases in feet D. Calculate area increase i. Sprinkler increase ii. Frontage increase STEP 5: DETERMINE ALLOWABLE BUILDING AREA lF MULTI-STORY BUILDING STEP 7 DETERMI NE MIXED.OCCUPANCV APPLICATIONS i. Determinefire-resistiveseparationrequirements ii. Check missed area ratio Commercial Plon Review Checklist - Page 2 STEP 8:COMPARE ACTUAL CONDITIONS VS. MAXIMUM ALLOWABTES STEP 9:REVIEW SPECIAT OCUPANCY PROVISIONS STEP 10:REVIEW MEANS OF EGRESS STEP 11:DETERMI NE ACCESSI BILITY REQUIREMENTS STEP 12:DETERMINE FIRE RESISTANCE OF ASSEMBLIES ffi- >fioriffiemblies ffitee s, DETERMTNE DETAILED FIRE Type of sprinkler Detailed requirements N REQUIREMENTS & FIRE AREAS Type and location of alarms Type and location of standPiPes Type of fire protection system supervision STEP 14: DETERMINE INTERIOR FINISH REQUIREMENTS STEP 15:DETERMINE INTERIOR ENVIRONMENT REqUIREMENTS STEP 16:DETERMINE ALL OTHER APPLICABLE DETAILED CODE REQUIREMENTS Commerciol Plon Review Checklist - Page 3 STEP 17:DETERMINE GENERAT STRUCTURAL RFQUIREMENTS \{qO PSF up to 7000 feet elevation o 50 PSF TOOL - 8000 feet elevation o 75 PSF 800L - 9000 feet elevation o 100 PSF above 9001 feet elevation ,-{ZA inches up to 8000 feet elevation o 42 inches over 8001feet elevation *N.O [E: Not all of the above steps will opply to oll proiects' I p€ DaAA t 5 Cc",Js rD<'f-€D ?-'L dc\sPl's''' Lf 44€ Pa-r"eq-O \Da.rz{l^c-uf t: As-: o AJ kZ lrycffWSgE-:*b*rv..'c5-56?--1Br*c'L65 ZdfLE-\ Pcrf2-- ZSfoa-X P6tu*rcr tg r-'-rA.tueb 6.-,u71qB u^l (-