HomeMy WebLinkAboutConditions of PermitCONDITIO NS OF PERMIT
BLRE-Os -2s-9234
SCOTT & JESSICA BALTZER
Detached Garage / Living Space Above
(not an ADU, no kitchen tub or shower facilities)
138 Sunlight Dr, GWS
Sunlight View Sub, Blk 6, Lot 1 1 - 23950310601 1
1 ) ALL WORK SHALL COMpLY W|TH THE 2015 TNTERNATTONAL RESTDENTTAL CODE (r.R.C.)AND 2018
I NTERNATIONAL ENERGY CONSERVATION CODE ( I.E.C.C.)
2) PROPOSED IN/PROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) ALL EXTERTOR LtGHTING TO BE DOWNCAST AND SHIELDED.
5) WILDFIRE lvllTlcATlON RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY CON4MUNIry DEVELOPMENT WEBSITE FOR
ADDITIONAL I NFORMATION.
6) OPEN HOLE SOTLS REpORT tS REOUTRED AT FOOTTNG TNSPECTTON AND PRIOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
1,500 PSF soil bearing.
7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERTNG FOR BUtLDtNG INSPECTOR AT TIME OF
FRAME INSPECTION.
8) BLOWER DOOR TEST tS REOUTRED FOR LtVtNG SPACE. MUST SUBMIT BLOWER DOOR TEST REPORT
TO GARFIELD COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL
BUILDING INSPECTION / C.O, FINAL. SEE STAMP ON COVER SHEET FOR SMALL SO FT DWELLINGS.
9) ACCESSORY STRUCTURE BATHROOM: ACCESSORY BUILDINGS _ OTHER THAN APPROVED
ACCESSORY DWELLING UNITS _ ARE NOT ALLOWED TO HAVE A SHOWER OR BATHTUB PER
GARFIELD COUNTY'S BUILDING RESOLUTION.
1O) WET BAR: AN AREA OF A ROOM THAT IS DESIGNED TO BE USED FOR SERVING OF BEVERAGES, THAT
MAY ONLY HAVE A SINGLE BAR SINK AND NO STANDARD SIZE KITCHEN APPLIANCES SUCH AS A
STOVE, OVEN, DISHWASHER OR FULL-SIZE REFRIGERATOR. COUNTER SPACE IS LIMITED TO 25 SO FT.
1 1) PRESCRIPTIVE PATH USING ATTACHED RESCHECK REPORT HAS BEEN CHOSEN FOR ENERGY
COMPLIANCE OF THIS HOME DESIGN. I\4ANUAL J REPORT ALSO ATTACHED FOR REFERENCE.
ALL NEW HOMES TO HAVE WHOLE-HOUSE N/ECHANICAL VENTILATION SYSTEM INSTALLED (2015
IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET.
N
s
N