Loading...
HomeMy WebLinkAboutEngineer's Report,Inw t Colleen Wirth From: Sent: To: Cc: Subject: Attachments: Follow Up Flag: Flag Status: I Vance King <vanceking@civcoengineering.com > Monday, May 5, 2025 2:16 PM Colleen Wirth; Gonzalez, Karen jamiebeyes@gmail.com RE: BLMF-04-25-9183 - SUTHERLAND manufactured home at279 Mohawk Dr is UNDFR REVIEW Westbrook Soils Report.pdf Follow up Flagged Hello Colleen, Here is the Geotechnical lnvestigation Report that my plans reference. Thanks, Vonce King CIVCO Engineering, Inc. PO Box 1758 Verrcl, UT 84078 435-789-5448 vanc ek i ng@ c ivco eng i nee r i ng. co m From: Col leen Wirth <cwirth @ga rfieldco untyco.gov> Sent: Monday, May 5,2025 1:29 PM To: Gonzalez, Karen <Ka ren.Gonzalez@ClaytonHomes'com> Cc: Vance King <va nceking@civcoengineering.com>; ja miebeyes@gmail.com Subject: BLMF-04-25-9183 - SUTHERLAND manufactured home at279 Mohawk Dr is UNDER REVIEW N s $ cfr you don't often get email from cwirth@sarfieldcountvco.gov. Learn whv this is important a RE: BLMF-04-25-9183 279 Mohawk Dr, Lot 10 Mineota Rdge' Ftg 1 Courtesy Message for SUTHERLAND Manufactured ADU on Lot '10: Hetlo, this is Garfietd County Ptans Examiner, Cotteen Wirth, with an update on your buitding apptication review. l,m activety reviewing your case now and woutd Like to obtain a couple added items for the permanent buitding fite record. REQUESTED ITEMS: 1. On S1 .0, CIVCO Engineering references Huddleston-Berry geotechnicaI report dated January 16, 2025. Can you ptease emait an etectronic copy of such report to me at clvirth@garfteldcountyco.gov? 2. Witt the proposed ADU be accessed by homeowner's via the originat existing driveway that also services the SUTHERLAN D',s primary residence? 2.a. OR witt the ADU be accessed via a separate driveway and a newty created second access location from Mohawk Drive? 1 - t$. *r*ixu{:f, ht -',[s*rritn*ui' * 'ti. wnitb the Property Qwn$l AOU Ceriiticate ot Comptiance signed by owners on March 2s,2o2s inctudes buttet #5 tabeted":utffSrii3nflnev${if;tbi'tine is shown on the futt size entarged site ptan - it remains a tittte unclear what the watdr tirfe is connecting to???? 3. 3.a. Does the water [ine connect to an existing or new private wetl on Lot 10? lf so, do you have a written copy of an historic or proposed state wetl. Permit demonstrating adequate water suppty to serve a second dwel.Ling on the tot? 3.b. Does the water line connect to a shared community wett system? lf so, do you have any written letters of proof from an HOA / Mineota Ridge Property Association (or other appticabte party) tisting evidence the shared potabte water suppty system a[[ows for an additional ADU at this tocation? 3.c. OR witt the new water [ine connect to a metropotitan district and municipaI water suppty source? lf so, do you have a 'tap fee' receipt or other formaI correspondence affirming such is approved? NEXT ACTION STEPS: Please respond to items 1 - 3 as best able. Respond referencing BLMF-04-25-9183 SUTHERLAND, attn: Cotteen Wirth, Plans Examiner, cwirth@garfietdcountyco.gov. Golteen Wirth Buitding Plans Examiner Garfietd Gounty Community Devetopment 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-1377 ext 1610 cwi r ltr@ga r{ieldcou ntyco.gov Staff email addresses are shifting to end in @garfieldcountyco.gov. However, personal names/prefixes on email addresses will remain the same. Please update our contact information domain. 2 Huddleston-Berry Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, Colorado 81501 Phone: 970-255-8005 Info@huddlestonberry. com January 16,2025 Project#O 1303-01 09 Clayton Homes 67123 Road Grand Junction, Colorado 81505 Attention: Ms. Karen Gonzalez Subject:Geotechnical Investigation 2T9MohawkDrive Silt, Colorado Dear Ms. Gonzalez, This letter presents the results of a geotechnical investigation conducted by Huddleston-Berry Engineering & Testing, LLC (HBET) for 279 Mohawk Drive in Silt, Colorado. The site location is shown on Figure I - Site Location Map. The proposed construction is anticipated to consist of a new Accessory Dwelling Unit (ADU). The scope of our investigation included evaluating the subsurface conditions at the site to aid in developing foundation recommendations for the proposed construction. Site Conditions At the time of the investigation, the southeast portion of the site was occupied by an existing residence. The remainder of the site was open with undulating terrain. However, the investigated area, to the north of the existing residence, was fairly flat due to previously conducted grading. As a result of the grading, vegetation in the vicinity of the proposed construction was mostly absent. The site was bordered to the north, west, and east by rural residential properties, and to the south by a rural residential property and Mohawk Drive. Subsurface Investiqation The subsurface investigation included six test pits at the site as shown on Figure 2 - Site Plan. The test pits were excavated to depths of between 6.0 and 8.0 feet below the existing ground surface. Typed test pit logs are included in Appendix A. As indicated on the logs, the subsurface conditions encountered at the site were slightly variable. Test Pits TP-l and TP-2, conducted in the vicinity of the proposed ADU, encountered tan to brown, moisto stiff to very stiff lean clay with gravel and cobbles soils and lean clay soils that extended to the bottoms of the excavations, respectively. Groundwater was not encountered in TP-1 or TP-2 at the time of the investigation. Test Pit TP-3, conducted in the northeastern portion of the investigated area, encountered 1.0 foot of topsoil above brown to grayish tan, soft, highly weathered claystone bedrock that extended to the bottom of the excavation. Groundwater was not encountered in TP-3 at the time of the investigation. $ { R .E\\ttu\sa 279 Mohawk Dr #01303-0109 01116/2s Huddlcston-Bsry En8in..rini& lt$id8, l-l-C :l ,,,fr' +"' Test Pit TP-4, also conducted in the northeast portion of the investigated area, encountered tan to brown, moist, very stiff to hard lean clay soils that extended to a depth of 2.5 feet below the existing ground surface. The clay soils were underlain by reddish brown to tano soft, highly weathered claystone bedrock that extended to the bottom of the excavation. Groundwater was not encountered in TP-4 at the time of the investigation. Test Pits TP-5 and TP-6, conducted in the vicinity of the proposed Soil Treatment Area (STA), encountered tan to brown, moist, stiff lean clay soils that extended to a depth of 4.0 feet below the existing ground surface. The clay soils were underlain by tan to brown, moist, stiff to very stiff lean clay with gravel and cobble soils that extended to the bottoms of the excavations. Groundwater was not encountered TP-5 or TP-6 at the time of the investigation. Laboratorv Testing Laboratory testing was conducted on samples of the native soils collected from the test pits. The l: testing included rtatural rnoisture content and density determination, grain-size analysis, Atterberg limits determination, swell/consolidation testing, and maximum dry density and optimum moisture content (Proctor) determination. The laboratory testing results are included in .- Appendix B. .nol . ,rra ft lf.* )tn, I t,' {fnF #'{fr&.t# t The laboratory testing results indicate that the native clay soils are slightly plastic. In addition, the native clay soils were indicated to be slightly collapsible, with up to approximately l.\Yo collapse measured in the laboratory.,,* l''q Due to the degree of weathering/fracturing of the material, undisturbed samples of the claystone {* h^,{*^^L ",---,,-^hl- i^ L^ ^^ll^^+^l f^- -,,,^ll/^^--^l:l^+:^- +^-+:-- LI^.,,^,,^- L^-^l ,,^^- ^,,- tl' # il;il; J" -',n',i " . r"r uil." ffi '*ffi ;ffi i ;il il;il'' "oii"i-'',.,' ;''[ ;;; J-;#ffi il; }lt the site is anticipated to be slightly to moderately expansive. Foundation Recommendations Based upon the results of the subsurface investigation and nature of the proposed construction, shallow foundations are generally recommended. Spread footings and monolithic (turndown) structural slab foundations are both appropriate alternatives. However, as discussed previously, the native clay soils are slightly collapsible. Therefore, in order to provide a uniform bearing stratum and reduce the risk of excessive differential movements, it is recommended that the foundations be constructed above a minimum of 24-inches of structural fill. However, the f^,,-.{-+i^-- -l^^,,1I L^ ^^^^-^+^l f-^* +L^ ^l^,,^+^-^ L^l-^^|. ^ *:-:*,,'- ^c Aa 2^^L^^rvurruqlrvrrJ Jrruulu uv JlPorctriy|lt rr\Jrrr Lrrv vr(lJJL\Jrrg ugLtlrJvI\ 4lttlttilltuttl ut.+o-iltvtl(;J, The native clay soils, exclusive of topsoil, are suitable for reuse as structural fill. In general, the claystone bedrock materials are not suitable for reuse as structural fill. Imported structural fill should eonsist of a- gra-nula-r, non-expansive, non-free d-rsining material with greater than !}o./a passing the #200 sieve and Liquid Limit of less than 30. However, all proposed imported structural fill materials should be approved by HBET. 2Z:\2008 AIL PROJECTS\01303 - Clayton Homes\o1303-0109 279 Mohawk Drive\200 - Ceo\o1303-01 09 LRol l625.doc 279 Mohawk Dr #01303-0109 0U16125 Huddleston-Berry For spread footing foundations, the footing areas may be trenched. However, for monolithic slab foundations, the structural fill should extend across the entire building pad area to a depth of 24' inches below the turndown edges. Structural fill should extend laterally beyond the edges of the foundations a distance equal to the thickness of structural fill for both foundation types. Prior to placement of structural fill, it is recommended that the bottom of the foundation excavation be scarified to a depth of 6 to 9 inches, moisture conditioned, and compacted to a minimum of 95oh of the standard Proctor maximum dry density, within t 2o/o of the optimum moisture content as determined in accordance with ASTM D698. Structural fill should be moisture conditioned, placed in maximum 8-inch loose lifts, and compacted to a minimum of 95Yo of the standard Proctor maximum dry density for fine grained soils and 90o/o of the modified Proctor maximum dry density for coarse grained soils, within + 2%o of the optimum moisture content as determined in accordance with ASTM D698 and D1557, respectively. Structural fill should be extended to within 0.l-feet of the bottom of the foundation. No more than O.l-feet of gravel should be placed below the footings or turndown edge as a leveling course. For structural fill consisting of the native soils or imported granular materials, and foundation building pad preparation as recommended, a maximum allowable bearing capacity of 1,500 psf may be used. In addition, a modulus of subgrade reaction of 150 pci may be used for structural fill consisting of the native soils and a modulus of 200 pci may be used for suitable imported structural fill. Foundations subject to frost should be at least 36 inches below the finished grade. Water soluble sulfates are common to the soils in Western Colorado. Therefore, at a minimum, cement adequate for Sulfate Exposure Class Sl is recommended for construction at this site. Any stemwalls or retaining walls should be designed to resist lateral earth pressures. For backfill consisting of the native soils or imported granular, non-free draining, non-expansive material, we recommend that the walls be designed for an equivalent active fluid unit weight of 45 pcf in areas where no surcharge loads are present. An at-rest equivalent fluid unit weight of 65 pcf is recommended for braced walls. Lateral earth pressures should be increased as necessary to reflect any surcharge loading behind the walls. Non-Structural Floor Slab and Exterior Flatwork Recommendations In order to limit the potential for excessive differential movements of slabs-on-grade it is recommended that non-structural floating floor slabs be constructed above a minimum of 18- inches of structural fill with subgrade preparation and fill placement in accordance with the Foundation Recommendations section of this report. It is recommended that exterior flatwork be constructed above a minimum of 12-inches of structural fill. Ensin...ina & T.ilhg, l-t,C JZ:UOO8 ALL PROJECTS\o1303 - Clayton Homes\01303-0109 279 Mohau'k Drive900 - Go\o1303-0109 LRoll625.doc 279 Mohawk Dr. #01 303-0 I 09 01116125 Drainage Recommendations Huddlsston-BcrrJ' Grading and drsinage sre criticsl to the long-term nerformance of the structure. Grading around the structure should be designed to carry preuipitation and runoff away from the structure. It is recommended that the finished ground surface drop at least twelve inches within the first ten feet away from the structure. It is also recommended that landscaping within five feet of the structure include primarily desert plants with low water requirements. In addition, it is recommended that automatic irrigation, including drip lines, within ten t-eet of tbundations be minimized. HBET recommends that surface downspout extensions be used which discharge a minimum of 15 feet from the structure or beyond the backfill zone, whichever is greater. However, if subsurface downspout drains are utilized, they should be carefully constructed of solid-wall PVC and should daylight a minimum of 15 fent from the stnrcture, In addition, an impermeahle membrane is recommended below subsurface downspout drains. Dry wells should not be used. In order to limit the potential for surface moisture to adversely impact the structure, a perimeter foundation drain is recommended. In general, the perimeter foundation drain should consist of prefabricated drain materials or a perforated pipe and gravel system with the flowline of the drain at the bottom of the foundation (at the highest point). The perimeter drain should slope at a minimum of 1.0Yo to daylight or to a sump with pump. The drain should also include an impermeable membrane at the base to limit the potential for moisture to infiltrate vertically down below the foundations. General Notes The recommendations inciuded above are boseci upon thc rcsuits of thc subsurfacc invcstigation and on our local experience. These conclusions and recommendations are valid only for the proposed construction. As discussed previously, the subsurface conditions encountered at the site were slightly variahle. However, the precise nature and extent of subsurface variability may not become evident until construction. As a result, it is recommended that HBET provide construction materials testing and engineering oversight during the entire construction process. In addition, the homeowner and any subcontractors working on the project should be provided a copy of this report and infurmed of the issues associated with the presence of moisture sensitive subgrade materials at this site. It is imnortsnt to note that the recommendaiions herein are intended io reduce ihe risk of slructural movemenl and/or domope- lo desrees. associated with volume chanse of the native soils and claystone bedrock. However, HBET cannot oredict lone-term changes in subsurfsce moisture conditions and/or the precise magnitude or extent of volume change. Whnrn sio-iGnn-| i-^-^-.^- ih 61,h-"-4'-^^^^i-1,,-^ l,.a ta -^^- *-^.1:-- :^^-^^^-ttaatata4, c I,LLur u4c aat ttttttr Y, uuata{. ,trtttt atttet stormwater management, utilitv line failure, excess imigation, or other cause, either during construction or the result of actions of the owner, severul inches of movement ure possible. In addiliutt, unv fuilure lu cumolv with the recummendutions in this repurt releuset Haddleston-Berrv Ensineerino & Tcslins- L of anv liabilitv with resard to the structure Engin..ring &'Icari.!. t.l.C performance. 4Z:U008 AIL PROJECTS\o1 303 - Clayton Homes\o1303-01 09 279 Mohawk Driveg00 - Geo\o1 303-0109 LRol 1625.doc 279 Mohawk Dr #01303-0109 0l/t6125 @ 3ndnctu8 & L$g, ltc Huddleston-Berry We are pleased to be of service to your project. Please contact us if you have any questions or comments regarding the'contents of this report. Respectfully Submitted: Huddleston-Berry Engineering and Testing, LLC Michael A. Berry, P.E. Vice President of Engineering 5z:u008 ALL PROJECTS\01303 - Clayton Homs\01303-0109 279 Mohawk Drive\200 - Go\01303-0109 LRol l625.doc FIGURES Location FIGURE 1 Site Location Map PqPublic.net'" Garfield County, Co D ale cr e aled: 7 / 74 / 2O2 5 Last Data tJploaded: 1/74/2O25 2:OA:22 AM Deverooed bvfl sc HcT.El,?Fn FIGURE 2 Site Plan APPENDIX A Typed Test Pit Logs GEOTECH BH COLUhINS 01303-01cs 279 MOHAWK DRIVE.GPJ GINT US LAII.GDT 1/12U25 !voLmo{zc =@mv o =mz-{ o 0i o -o 3oou)o(l) O oc) gA ODr5 a, :-u= 6iJOO35' o p-o $ o L :l€ 5 cq 3 t cq In' ga 1 vx' 6< G< !voLmo-{ 5o Ioz q. ;o !no(- mo-{z =m N{ @ o o* 0 o + nr @{!{zc =,E PTT i',4V -{ 9P -J zo-{tfto t-ooom0 E -{o mx C) {dz =mJIoc' mxo -{5zoo2-{v o-{ov C) o E, -{m u,-{ a{ m0 N (, NA{ oox F 0,or cooI moxmc, E tI, oo =!t-m-{m E, N (, NA ouo+rr= *E#;5H9S?*en ;Egf r95'12 ovoczc' m m { 6z g:o ? -{mo+ !J ENm o DEPTH (ft) GRAPHIC LOG t mntr(f m U)on :o+ z SAMPLE TYPE NUMBER RECOVERY o/o (ROD) BLOW COUNTS (N VALUE) POCKET PEN (ts0 DRY UNIT WT (pcD MOISTURE CONTENT (o/o) --{r-{ =ms;o -l@@mvo FINES CONTENT (Y") LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX @- =o:lo +fo-- ()qt a, =A++ o OJ o; =CLoo ito e.(o:r' o,f o cr o 5 3o.o [E o 3 o oo E. o) Po oor+ GEOTECH BH COLUMNS 01303-0109 279 !vo(- moIzc =I!mv otr mz-{ ot c Ic 3oa c i0c}) c io sANJi'l-JX'-J= .' ll 9= q-io6' &b.n Oa9;?(^o ow50@i -f^ ^Y!aoFo @<tFGEFo i.i 0a F,lo g. se-r.o !vo(- mo-{ 5o JJoz !vo(- mo -.1z =m N{(o o5 0tt o =.o { nr cn{!+zc =@mn {! TN T om o.Tl zo-{mtn t-ooomI E -{o mxo { 6z =m -oI mxo { 6z ooz-{a o{on Io:J E, -{m aa-{ a{mo t9 o) NA-t l)3xJ trl)-:tooo-moxmo @ TD oo =!t-m -.1mq N (, N5 ovo>>>E #E*;HV9S38xu dEin r96tz2. onocz E, mt-m -{6z tf:U: -{mo -.{ !-{ g, Nm Po DEPTH (fi) GRAPHIC LOG --l mntro maon !-lo2 SAMPLE ryPE NUMBER RECOVERY o/o (ROD) BLOW COUNTS (N VALUE) POCKET PEN. (tsD DRY UNITWT (pcf) MOISTURE coNTENT (%) -{r-l =m=u-l tDafino FINES CONTENT (Y.\ LIQUID LIMIT PLASTIC LIMIT PLASICIry INDEX \) 3] o @-t-s)cto otoo =oa r-o 0) or- c) F-v o) o E ts €f ; 9.q :+ od+ o (D€o4 o (o-{ o (3 o @ A N(o 6 (o @o o 3 o o @ p. o, tro oor+ 279 MOHr'.W( DRIVE.GPJ GINT US I.L.A.GDT 1/14125 zo-{rno t-ooo mo E -lc) mxo -.1 o-z =m-{roo mxo {6zooz{7 o ov o o5 o -.1ma-{ v{mI N (r) t\)+ !voC-mo zc =@mv lelolol"lotJlo l." otr mz,{ o ll tf I)l Dn o T moxm E, E @ -{ 0loxJ @ !JoF oo oo =!|-m{mo N (/) Ns s A I'J Fri -l X' -J :rON 6= oo5.i oe9; ?bo ow500 oF!o+et 6..< R;Ei & R" "J6 E go--(l an{mv mxo -{oz -{ mz0o-n mxc' -{6z g a ono>.= -lO #Eq! frfrfh{ oz Uz ovocz0 mt-m -{6z !voLmo{ l.oo{ oz a bo !7oLmo-{z =m N\I(o 5 B)tx o5, (D {m @{ ! {zc =olD>mi4n --{ 9P -ql -{m an{!{ aNm Io DEPTH (ft) GRAPHIC LOG I mn Fr Um CNon ll-l oz SAMPLE ryPE NUMBER RECOVERY o/o (ROD) BLOW COUNTS (N VALUE) POCKET PEN (ts0 DRY UNITWT (pcD MOISTURE coNTENT (%) -tr --{ =m=n-l@@mno FINES CONTENT eA) LIOUID LIMIT PLASTIC LIMIT PLASTICITY INDEX , .li ,.1/-. rr.. l,rt .', {4 ,- l{-'-t4 .. 1: . -.1\ - tt. t\ , .tt: roof o 0) €. odgt 6o -loll U)o t- or (t-lozF c' o 5 (o o) =.o 0t -f @oF (6'5 €o BI =o d CL @o o 3 o oo ='q, Jo oo a+ GEOTECH BH COLU|V|NS 01303-0109 279 !voL mo-{zc, =I!mn o (,o(r) o o@ otr mz{ oq) oJ I 3ob \on r5uau= 6iJ 83.uo ; - c. @ o. @ O FI 0a @o 0c FIo' s. 0a Fo !vo(- mo t-oo Ioz 1tvo(- mo z 3 m N{ @ !)* o o -{m U,{ ! {zc =trm7 {!II ll o m o.Tl zo-{m6 t-ooo tr.| c, tr +o mxo -{6z =m{-o0{Ix5 @g) ox oo mxo -{6z ooz - o-{ov Io3 E, -{ TTI anI u -.1mo N =(, oo =!t-m{mo oI moxmq @ tI, N (l) N5 ono+rr= *E#E6HqS ixilfreI{h r9o-,22 ovocz0 mt-m -{6z o ?o a -{mo-l!-{ g, Nt'] Io DEPTH (fr) GRAPHIC LOG -{mn Ft-o m U)on 1' -.|oz SAMPLE TYPE NUMBER RECOVERY % (ROD) BLOW COUNTS (N VALUE) POCKET PEN (tsD DRY UNIT WT (pc0 MOISTURE coNTENr (%) --{ --l=m=n--{ @amno FINES CONTENT (o/.) LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX N J] .lrr '\l . r,. rs.. l/r'l-- .,, {a ,- l<-': .t<'. t:.". t-o 0)3 o o, €. J od!) =.o @ -to T](tor- r-o otJor c)t-; ot o ct o €fio.o5+ oeof. o =o)o sro ilil ililililil il ililil il ililltil il ililililil il ltilil il ilil il il ot a -loz .!'n o CLg @5 g o 5 o 0) -foo ;(ct J {o o, Jo o CL ql o o3 o oo p. o, Io (Dof+ zo mo t-ooomI E -lo mxo {6z =mI+oo -tilo-f E o)o- o(D mxo -{62ooz-{u o-{ov g of tr' -{mo-{ 8{m(f N N-..t l\tA 'ovoLmo{zc, =@mv o o)oq) o o(o otr mz-{ a ]J c I3 3 Dn \o{ N) 6 o oo 6 {6\o o a.o ,t{ o.on o It 0a =.oo 0q F -lo 0a |.-o oImoxm tr' E oo =1trm-{m tr, N N{ N5 .n{mF mxo -loz -{ m2 E, o-rt mxo { 62 E? ovo>=-lO #Eqs rHsh-{6z o: onoczI m-m -{6z !voL mo{t-oo -{oz a. 'o o !noL mo-{z 3 m N{ @ o5 o)*o o {m CN{ 3{zC =.oEtmi4n-{qP -(ll {m at,-{c-{ g, NtI c DEPTH (fl) GRAPHIC LOG --{ mn r o m @ c)v -u --{ oz SAMPLE TYPE NUMBER RECOVERY % (ROD) BLOW COUNTS (N VALUE) POCKET PEN. (tsD DRY UNITWT (pcD MOISTURE coNTENT (%) --{r-l =n-l@@mno FINES CONTENT (To) LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX .t., t: .'t/-.1\-.'l').[:. y-. l; 1;.. l*; .t/-.1\ . t/,. 1\ .tt r-o 0)fo 0) z. o @ ol o'o --lo-oao t- ro 0)f r orv 0)f o EI o €f 3o.6a+ o =. @- =o:ID+59o OLe< @,*=+= o ol o;5o.oou o-'o a.(oY s: o d a F 3 9.oF (Do o 3 o oo p. ol Po oo N+ Foq 6I alFz6 Iq U tro B Io oNNoo o o o @z fJoo Io IouFoUo Huddleston-Berry Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, CO 81501 970-255-8005 TEST PIT NUMBER TP.6 PAGE 1 OF 1 CLIENT Clavton Homes PROJECT NAME 279 Mohawk Drive PROJECT NUMBER o 1303-0'109 PROJECT LOCATION SiIt, CO DATE STARTED 12127124 COMPLETED 12t27124 GROUND ELEVATION TEST PIT SIZE EXCAVATION CONTMCTOR Client GROUND WATER LEVELS: AT TIME OF EXCAVATION AT END OF EXCAVATION AFTER EXCAVATION .-- EXCAVATION METHOD Trackh/Backhoe Drv LOGGEDBY TC CHECKEDBY MAB Drv NOTES =F TL IUo 0.0 C) Trn +Ed-o MATERIAL DESCRIPTION uJ o->tFul 3gtLl>z a s ga gs H AG>Fl ^zrHasoz z I.JJ o_ FCu9 oofL LI zo5s tro u.r St-lr- f, Pr -roz>oo ATTERBERG LIMITS Fz IJJFz 88 u)ulz IL OL e= J_ (JF-tg= (L F ;1 XY[l 6e1= o- 5.0 13 ! 2!! .v. j Lean Clay with Organics (TOPSOIL) Lean CLAY (CL), tan to brown, moist, stiff Lean CLAY with Gravel and Cobbles (clg), tan to brown, moist, stiff to very stiff Bottom of test pit at 6.0 feet. APPENDIX B Laboratory Testing Results N o Foq @I @l Fzo cq U Eo oNNq Huddleston-Berry Engineering & Testing, LLC GRAIN SIZE DISTRIBUTION Riverside Parkway Grand Junction, CO 81501 970-255-8005 CLIENT Clavton Homes PROJECT NAME 279 Mohawk Drive PROJECT NUMBER 01 303-0 1 09 PROJECT LOCATION U.S, SIEVE OPENING IN INCHES6 4 3 21.5 1314 U,S. SIEVE NUMBERS HYDROMETER 3 4 6 81014 20 30 40 FIo LrJ =dt t uJztr Fz uJ Ot uJ TL 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 100 0 1 GRAIN SIZE IN MILLIMETERS 0.1 0.01 0.001 1 )J-I-1IT COBBLES GRAVEL SAND SILT OR CLAY coarse fine coarse medium fine Specimen ldentification Classification LL PL PI Cc Cu o TP-2, GB-l 12t13 LEAN CLAY(CL)29 18 11 Specimen ldentification D100 D60 D30 D10 %Gravel %Sand %silt %Clay o TP-2, GB-l 12113 1.18 0.0 8.6 91.4 Huddleston-Berry Engineering & Testing, LLC ATTERBERG LIMITS' RESULTS I 970-255-8005 CLIENT Clayton Homes PROJECT NAME 279 Mohavvk Drive PROJECT NUMBER PROJECT LOCATION P L A S T I c I T I N D E X 50 40 30 20 10 CL-ML @ @ 0 00 LIQUID LIMIT Specimen ldentification LL PL PI #200 Classification a TP.2, GB.1 12113 29 18 11 91 LEAN CLAY(CL) N N F 6o ai 5 @l F7,o cq U 0ao Y B I =N Noo o o o aF =:oEU @ tr,uFF af Fzo co ui to =I =oNN oo o o zatF @ J az (_) Huddleston-Berry Engineering & Testing, LLC 2789 fuverside Parkway Grand Junction, CO 81501 970-255-8005 CONSOLIDATION TEST CLIENT Clavton Homes PROJECT NAME 279 Mohawk Drive PROJECT NUMBER 01 303-01 09 PROJECT LOCAI]ON s 2 v.F U) 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 3.8 4.0 4.2 100 1,000 10,000 STRESS, psf Specimen ldentification Ta MC% () \ ()\ \ \ \ \ \ \ \ I O TP-2, MC-1 2.0 Classification 97 8 Nb N FoU ai 5 al Fzo orl U to =Io NN oo o o o zo Fo I O Huddleston-Berry Engineering & Testing, LLC 2789 ltverside Parkway Grund Junction, CO 81501 970-255-8005 MOISTU RE-DENSITY RELATIONSH I P PROJECT NAME 278 Mohaurk Drive PROJECT NUMBER 01303.0109 PROJECT LOCAI]ON SiIt. CO CLIENT Clayton Homes JI \ \ \ \ \ \ \ /\/ /\ 7 \ Sample Date: Sample No.: Source of Material: Description of Material 12t13t2024 24-0846 145 TP.z. GB.I LEAN CLAY(CL) Test Method (manual):ASTM D698A 140 135 TEST RESULTS Maximum Dry Density 110.5 PCF Optimum Water Content 15.5 % 130 125 GRADATION RESULTS (% PASSING) #200 #4 314" 91 100 100 oatF6z trJo E.o ATTERBERG LIMITS 1 20 LL PL PI 29 18 11 115 Curves of 100% Saturation for Specific Gravity Equal to: 110 2.80 2.70 2.64 105 100 95 5 15 WATER CONTENT, % 90 0 10 20 25 30