HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PER MIT
BLMF-O4-25-91 83
CHIP & REBECCA SUTHERLAND
MFH / ADU
Mohawk Dr, Silt
PRE-FABRICATED HOME ON ENGINEERED FOUNDATION CRAWL SPACE
Mohawk Dr, Silt - Mineota Ridge Est, Amd FLG 1, Lot 10
MANUFACTURED HOUSESARE REGULATED & INSPECTED BYCOLORADO DEPT. OF HOUSING (C.D.O.H.)
AND ALt FACTORY.BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET
C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE.
(2018 |ECC 'BLOWER DOOR TESTtNG', ON PREMTSES AFTER INSTALLATION SHALL NOT APPLY FOR
MANUFACTURED HOME TYPE -
AS CURRENT ENERGY COMPLIANCE FOR STATE OF COLORADO IS TO BE VERIFIED AT THE FACTORY)
1)
o\
3)
FOUNDATION CRAWL SPACE & EXTERIOR DOOR LANDING / STAIRS SHALL COMPLY WITH 2015 I.R.C.,
201 8 I.E.C.C. AND MANUFACTURER'S INSTALLATION REOUIREMENTS.
REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENTS AND
MAN UFACTURER'S I NSTALLATION REQUI REM ENTS.
WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNIry DEVELOPMENT WEBSITE FOR
ADDITIONAL I N FORMATION.
ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
ELECTRICIAN.
ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL, ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF
OCCUPANCY.
PROPANE FUEL TYPE SPECIFIED: SEE ATTACHED GUIDE.
CERTIFICATE OF PERMANENT LOCATION FOR MANUFACTURED HOME STAPLED TO FIELD COPY
FOR OWNER'S USE, IT IS OWNER'S RESPONSIBILIry TO COMPLETE PURSUANT TO INSTRUCTIONS.
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING
INSPECTOR WITH FINAL APPROVAL / SIGN.OFF FROM GARFIELD COUNry'S PUBLIC HEALTH
DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM.
GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS DESIGNED AT 1,500 PSF, VERIFY MINIMUM FROST DEPTH & UFERGROUND
INSTALLED. lnclude compaction report for any structural fill. OPEN HOLE SOILS REPORT REOUIRED
AT FIRST FOOTING INSPECTION.
B. FOUNDATION
C. SEPTIC SYSTEM CONNECTION
D. PLUMBING/GAS
E. SITE FRAMING, STAIRS, HANDRAILS PER STRUCTURAL ENGINEERS PLANS AND FIELD COPY.
F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY*
*NOTE: GARFIELD COUNry REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR
TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY
N
$
att
.s
a\
-N-
4)
s)
e)
6
7