HomeMy WebLinkAboutObservation of Excavation:# CTL THOMPSON
1|'t
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 970-945-2809
Field Observation Report Report#: FOR{00001
Mt22t2025
Cllent:Project:
Maura & Breft Wamsley
54 Pino Street
Carbondale, CO 81623
GS06929.000F-305
lce House Addition
54 Pine Stroet
Carbondale, CO
Ac{lvlty D ale: 0 4 I 22 I 2O25 Technlclan: Downlng, Thonras
Plans/Details:
CTLIThompson Report GS06929.000-120-R1, dated December
11,2024
Discrepancy:
The items observed were found to be in general conformance with the approved drawlngs and standard construction
practice:
I ves E t'to
Discrepancy:
flvesnNo
Discrepancy Remarks:
Clays encountered in the south and east footing excavation are to be removed and replaced with densely compacted structural
fill material per the report.
General Remarks:
As requested, a site visit was made to observe the soils exposed in the footing excavations. Per CTLIT report GS06929.000-
120-R1 , dated December 1 1 , 2024, lhe footings can be supported by the undisturbed, silty gravel andlor structural fill. The silty
gravels encountered on the west side of the excavation are appropriate for footings support, however the clay material exposed
at footing elevation on the east and south sides should be removed and replaced with densely compacted structural fill
material per the report. The contractor wati notified of our observations. Additional site visits will be made with required.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of3
*ffi CTL THOMPSOhI
llil l::.
Glenwood Sprlngs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 970-945-2809
Field Observation Report Report#: FOR-000001
0412212025
Glient:Project:
Maura & Brett Wamsley
54 Pine Street
Carbondale, CO 81623
GS06S29.000F-305
lce House Addition
54 Pine Street
Carbondale, CO
lmages:
Gomments: overall site Commenls: gravels exposed in northwest corner
': .. .,
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 3
ffi CTLITHOMPSON
Glenwood Sprlngs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 970-945-2809
Field Observation Report Reportf: FOR{00001
0412a2025
Gllent:Prolect:
MauraE BlettWamsloy
5'l Plne Street
Carbondale, CO 81623
GS06929,000F-305
lce Hous€ Addition
8[ Pine Street
Caftondale, CO
Gommente: clays exposed in northeast footing comer
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 3 of3
ffi CTL THOMPSON
Glenwood Sprlngs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 970-945-2809
Field Observation Report Report#: FOR{00002
05t02t2025
Gllent:ProJect:
Maura & Breft Wamsley
54 Pine Street
Carbondale, CO 81623
GS06S29.000F-305
lce House Addition
54 Pino Sk$et
Carbondale, CO
Actlvlty Dats: O 5 I O2l 2025
Plans/Detalle;
CTLlThompson Report GS06929.000-120-R1, dated December
11,2024
Techniclan: Downing, Thonras
Discrepancy:
The items observed were found to be ln general conformance wlth the approved drawings and standard construction
practice:
Elvo n ruo
Dlscrapancy:
I ves E] tto
General Remarks:
As requested, a site visit was made to observe the soils exposed in the footing excavations. Per CTLIT report GS06929.000-
120-R1 , dated December 11, 2024, the footings can be supported by the undisturbed, silty gravel and/or structural fill. The
contractor has removed the clayey soils encountered on the south and east sides ofthe excavation and has achieved
proposed footing subgrade with densely compacted structural fill. We judge the footing excavation as appropriate for
construction of spread footings. The contractor was notified of our olrservations. Additional site visits will scheduled with our
office when required.
Legal: Contractor to ensurs integrity of completed work is maintained during subsequent construction activities.Page 1 of3
# CTL THOMPSON
|l'il
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 970-945-2809
Field Observation Report Report#: FOR400002
0510212025
Cllent:Project:
Maura & Brett Wamsley
& Pine Street
Carbondale, CO 81623
GS06929.000F-305
lce House Addition
54 Pine Street
Carbondale, CO
lmages;
Gommonts: overall site, looking northwest Gomments:
structural fill placed and compacted in south footing line
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities Page 2 of 3
'ffi CTL THOMPSON
Glenwood Sprlngs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 970-945-2809
Field Observation Report
Gllent:
Report#: FOR400002
05t0212025
Project:
Maura & Brett Wamsley
54 Pine Street
Carbondale, CO 81623
GS06929.000F-305
lce House Addition
54 Pine Street
Carbondale, CO
Gomments: overall site, looking northeast
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 3 of 3