HomeMy WebLinkAboutObservation of Excavation:# CTL THOMPSON 1|'t Glenwood Springs 234 Center Drive Glenwood Springs, CO 81601 Phone: 970-945-2809 Field Observation Report Report#: FOR{00001 Mt22t2025 Cllent:Project: Maura & Breft Wamsley 54 Pino Street Carbondale, CO 81623 GS06929.000F-305 lce House Addition 54 Pine Stroet Carbondale, CO Ac{lvlty D ale: 0 4 I 22 I 2O25 Technlclan: Downlng, Thonras Plans/Details: CTLIThompson Report GS06929.000-120-R1, dated December 11,2024 Discrepancy: The items observed were found to be in general conformance with the approved drawlngs and standard construction practice: I ves E t'to Discrepancy: flvesnNo Discrepancy Remarks: Clays encountered in the south and east footing excavation are to be removed and replaced with densely compacted structural fill material per the report. General Remarks: As requested, a site visit was made to observe the soils exposed in the footing excavations. Per CTLIT report GS06929.000- 120-R1 , dated December 1 1 , 2024, lhe footings can be supported by the undisturbed, silty gravel andlor structural fill. The silty gravels encountered on the west side of the excavation are appropriate for footings support, however the clay material exposed at footing elevation on the east and south sides should be removed and replaced with densely compacted structural fill material per the report. The contractor wati notified of our observations. Additional site visits will be made with required. Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of3 *ffi CTL THOMPSOhI llil l::. Glenwood Sprlngs 234 Center Drive Glenwood Springs, CO 81601 Phone: 970-945-2809 Field Observation Report Report#: FOR-000001 0412212025 Glient:Project: Maura & Brett Wamsley 54 Pine Street Carbondale, CO 81623 GS06S29.000F-305 lce House Addition 54 Pine Street Carbondale, CO lmages: Gomments: overall site Commenls: gravels exposed in northwest corner ': .. ., Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 3 ffi CTLITHOMPSON Glenwood Sprlngs 234 Center Drive Glenwood Springs, CO 81601 Phone: 970-945-2809 Field Observation Report Reportf: FOR{00001 0412a2025 Gllent:Prolect: MauraE BlettWamsloy 5'l Plne Street Carbondale, CO 81623 GS06929,000F-305 lce Hous€ Addition 8[ Pine Street Caftondale, CO Gommente: clays exposed in northeast footing comer Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 3 of3 ffi CTL THOMPSON Glenwood Sprlngs 234 Center Drive Glenwood Springs, CO 81601 Phone: 970-945-2809 Field Observation Report Report#: FOR{00002 05t02t2025 Gllent:ProJect: Maura & Breft Wamsley 54 Pine Street Carbondale, CO 81623 GS06S29.000F-305 lce House Addition 54 Pino Sk$et Carbondale, CO Actlvlty Dats: O 5 I O2l 2025 Plans/Detalle; CTLlThompson Report GS06929.000-120-R1, dated December 11,2024 Techniclan: Downing, Thonras Discrepancy: The items observed were found to be ln general conformance wlth the approved drawings and standard construction practice: Elvo n ruo Dlscrapancy: I ves E] tto General Remarks: As requested, a site visit was made to observe the soils exposed in the footing excavations. Per CTLIT report GS06929.000- 120-R1 , dated December 11, 2024, the footings can be supported by the undisturbed, silty gravel and/or structural fill. The contractor has removed the clayey soils encountered on the south and east sides ofthe excavation and has achieved proposed footing subgrade with densely compacted structural fill. We judge the footing excavation as appropriate for construction of spread footings. The contractor was notified of our olrservations. Additional site visits will scheduled with our office when required. Legal: Contractor to ensurs integrity of completed work is maintained during subsequent construction activities.Page 1 of3 # CTL THOMPSON |l'il Glenwood Springs 234 Center Drive Glenwood Springs, CO 81601 Phone: 970-945-2809 Field Observation Report Report#: FOR400002 0510212025 Cllent:Project: Maura & Brett Wamsley & Pine Street Carbondale, CO 81623 GS06929.000F-305 lce House Addition 54 Pine Street Carbondale, CO lmages; Gommonts: overall site, looking northwest Gomments: structural fill placed and compacted in south footing line Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities Page 2 of 3 'ffi CTL THOMPSON Glenwood Sprlngs 234 Center Drive Glenwood Springs, CO 81601 Phone: 970-945-2809 Field Observation Report Gllent: Report#: FOR400002 05t0212025 Project: Maura & Brett Wamsley 54 Pine Street Carbondale, CO 81623 GS06929.000F-305 lce House Addition 54 Pine Street Carbondale, CO Gomments: overall site, looking northeast Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 3 of 3