Loading...
HomeMy WebLinkAboutConditons of PermitCONDITIO NS OF PERMIT BLCO-06-2s-9286 RYOBI FOUNDATION _ POWERS ART CENTER ADDITION TO EXISTING BARN TO WORK ON ART 131 1 2 HIGHWAY 82, CARBONDALE, CO S-1 OCCUPANCY, VB CONSTRUCTION 1) THE APPROVED PLANS ARE TO BE ON-SlrE FOR INSPECTIONS. 2) SANTTARY FACTLTTES ARE REOUIRED TO BE PROVIDED FOR WORKERS. 3) A LIST OF REOUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT AND APPROVE THE ELECTRICAL WORK. RMITS 4) UNDERGROUND UTrLrry LOCATES rS THE RESPONSTBTLTry OF THE OWNER OR CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE. 5) DRAINAGE ACROSS PROPERry LINES SHALL NOT EXCEED THAT WHICH EXISTED PRIOR TO GRADING. EXCESS OR CONCENTRATED DRAINAGE SHALL BE CONTAINED ON SITE OR DIRECTED TO AN APPROVED DRAINAGE FACILIry. EROSION OF THE GROUND IN THE AREA OF DISCHARGE SHALL BE PREVENTED BY INSTALLATION OF NON-EROSIVE DOWN DRAINS OR OTHER DEVICES. 6) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTIONS. 7) GEOTECHNTCAL OBSERVATION lS REOUIRED WHEN THE EXCAVATION lS COMPLETE AND WRITTEN VERIFICATION BE SUPPLIED AT FOOTING INSPECTION, 2000PSF. 8) ALL EXTERTOR LIGHTING lS TO BE DOWNCAST AND SHIELDED. 9) SAFEW GLAZING IS NOT DESIGNATED ON THE PLANS. SAFETY GLAZING WILL BE CHECKED DURING THE FRAMING AND FINAL INSPECTION. (IBC 2406.4) 10)A KNOX BOX tS REOUTRED TO BE MOUNTED ADJACENT TO THE FRONT DOOR. PLEASE CONTACT THE LOCAL FIRE DISTRICT FOR EXACT LOCATION. 1 1)THE WALLS SURROUNDING THE TOILET ARE TO BE NON-ABSORBENT FOR A HEIGHT OF 48" AND 2' PAST ON EACH SIDE OF THE TOILET. 1 2)ALL ACCESSIBLE DOOR HARDWARE SHALL HAVE A SHAPE THAT IS EASY TO GRIP, TNCLUDTNG POCKET AND SLIDING DOORS. (ANSI A117.1 - 404.2.6) 13)GRAB BAR BACKTNG tS TO BE rN PLACE FOR THE TOTLET AT FRAMTNG TNSPECTION. THE REOUIRED VERTICAL GRAB BAR IS MISSING. REDLINED ON THE PLANS. r% 14)THE SLAB EDGE INSULATION IS NOT SHOWN CORRECTLY. THE INSULATION IS TO BE TO THE TOP OF THE SLAB. REDLINED ON THE PLANS. 15)A PASSING BLOWER DOOR TEST FOR THE HEATED AREAS IS REOUIRED TO BE SIJBMITTFD PRIOR TO ISSIJING THF CFRTIFICATF OF OCCIJPANCY. 16)ANY EXPOSED FOAM rS TO BE COVERED W|TH AN TGNtTtON BARRTER OR A THERMAL BARRTER BASED ON LOCAT|ON. (lRC R316) 1 7) M|N|MULLY THE tCE SHTELD tS TO BE TNSTALLED AT THE EAVES TO A MIN|MUM 24" UP FROM THE INSULATED WALLS. 18) DRATNAGE SWALE BEHTND THE BU|LD|NG TO BE COMPLETE AND FUNCTTONING PER THE PLAN PRIOR TO FINAL INSPECTION. 19) ATTENTION, SOME ANCHOR BOLTS ARE 5/8" AND SOME ARE y2', . 20) EX|T STGNS/EMERGENCY LTGHTS HAVE BEEN REDLTNED ON THE OR|GIALLY SUBMITTED ELECTRICAL PLANS.