Loading...
HomeMy WebLinkAbout1.02 Supplement Application Info - Updated Switzer NarrativeJune 2, 2025 Re; ADU located at 33 ST Finnbar Farm RD., Carbondale CO 81623 To whom it may concern, The barn ADU was completed in early 2023 and the building height from the finish floor to the ridge is unchanged and is the same as the permitted plans. The building elevation above sea level is higher than the plans. When the main home was being built the water - table was so high that we had to raise the foundation a foot so we could add material to stabilize the ground. For grading purposes, the finish floor of the ADU was elevated to match the main home at the time of construction. We are seeking to allow the building height at the midpoint of the roof to be at the measured 6285.4 MSL Elevation. If we do not get the variance, we may need to remove the roof of the barn and this would be extremely costly. This is a large lot and the ADU does not block anyone's views, it is also surrounded by trees. Below is an explanation of our request and the criteria contained in section 4-115. 1. Special Circumstances or Conditions Exist: The water table was so high that we had to raise the foundation of the main home a foot so we could add material to stabilize the ground. For grading purposes, the finish floor of the ADU was elevated to match the main home at the time of construction. 2. Not a result of the actions of the Application: This was a result of the water table conditions on the property. 3. Strict Application Consequence: If we do not receive the variance we may need to remove the roof of the barn. 4. Variance is necessary for Relief: If we have to remove the roof of the barn this would be extremely difficult and costly causing a hardship for the homeowners. 5. Not Detrimental to the public good: This is a large lot and the ADU does not block anyone's views, it is also surrounded by trees. 6. Variance will not impar the county's zoning: We are in compliance with article 7 and the ADU passes all building codes required. Patrick Maley, President -Ok Maley Building Corporation Maley Building Corporation 970.927.1026 Info@MaleyBuilding.com MaleyBuilding.com Fax: 970.927.1027 P.O. Box 4028 Basalt. Colorado 81621