Loading...
HomeMy WebLinkAboutPlans 1EQUIPMENT TAG NORTH ARROW LEVEL CALLOUTS BUILDING SECTION A101 1 REF RE F REF RE F BUILDING ELEVATION A101 1 SIM DETAIL INDICATOR 1 1 A101 SIM T.O. FND. WALL 100'-0" DATE ISSUED SHEET NUMBER 1898 S. FLATIRON CT. SUITE 125 BOULDER, CO 80301 e. info@ceresgs.com p. 303.495.5006 9/1/2020 7/30/2021 9/15/2021 A-0.0 COVER SHEET GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 MIN MINIMUM N/A NOT APPLICABLE NTS NOT TO SCALE O.C. ON CENTER(S) OSB ORIENTED STRAND BOARD PCM PHASE CHANGE MATERIAL PSI POUNDS PER SQUARE INCH R.O. ROUGH OPENING RM ROOM S.F. SQUARE FEET SCHED SCHEDULE SPEC SPECIFICATIONS T.O. TOP OF TBD TO BE DETERMINED THERM. THERMOSTAT W/ WITH W/O WITHOUT WP WATER PROOF ARCH ARCHITECTURAL AWIP ALL WEATHER INSULATED PANELS B.O. BOTTOM OF BLDG BUILDING CD CONSTRUCTION DOCUMENT CFM CUBIC FEET PER MINUTE CIRC. CIRCULATION CMU CONCRETE MASONRY UNIT CONC CONCRETE DBL DOUBLE DIA DIAMETER DIM DIMENSION ELEC ELECTRIC(AL) EQ EQUAL ETFE ETHELYNE TETRAFLUOROETHELYNE FND FOUNDATION FT FOOT/FEET GAHT GROUND TO AIR HEAT TRANSFER SYSTEM GH GREENHOUSE HDPE HIGH-DENSITY POLYETHYLENE HH HEAD HOUSE HP HORSE POWER HVAC HEATING/VENTILATION/AIR CONDITIONING IMP INSULATED METAL PANEL ABBREVIATIONS GENERAL NOTES INDEX OF DRAWINGS A-0.0 COVER SHEET A-1.0 PERSPECTIVES A-1.1 FLOOR PLAN A-2.0 ELEVATIONS A-3.0 SECTIONS A-3.1 WALL SECTIONS A-4.0 STANDARD FAN, LOUVER & DOOR DETAILS A-5.0 ETFE ROOF & SOUTH WALL A-5.1 ETFE EAST & WEST WALL A-5.2 ETFE DETAILS A-6.0 GAHT® DESIGN A-7.0 ELECTRICAL PLAN A-8.0 SCHEDULES SYMBOLS ANDY BRUNO 364 Storm King Road, New Castle, CO 81647 CLIENT DESIGN PROFFESIONAL CERES GREENHOUSE SOLUTIONS 1898 S. FLATIRON CT. SUITE 125 BOULDER, CO 80301 e. info@ceresgs.com p. 303.495.5006 ANDY BRUNO STRUCTURAL ENGINEER DOTEC ENGINEERING 242 JEFFERSON STREET ST. CHARLES, MO 63301 636-724-9872 364 STORM KING ROAD, NEW CASTLE, CO 81647 GREENHOUSE COMPLEX THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, WITHOUT WRITTEN AUTHORIZATION FROM CERES GREENHOUSE SOLUTIONS LLC. DRAWINGS AND SPECIFICATIONS, AS INSTRUMENTS OF SERVICE, ARE THE EXCLUSIVE PROPERTY OF CERES GREENHOUSE SOLUTIONS WHETHER THE PROJECT FOR WHICH THEY WERE PREPARED IS EXECUTED AND CONSTRUCTED OR NOT. THESE DOCUMENTS ARE NOT TO BE REPRODUCED IN ANY FORM AND THEY ARE NOT TO BE USED BY THE PROJECT OWNER NOR ANY OTHER ENTITY ON ANY OTHER PROJECTS OR FOR ANY EXTENSIONS OR ADDITIONS OR ALTERATIONS TO THE ORIGINAL PROJECT EXCEPT BY WRITTEN AUTHORIZATION AND PERMISSION FROM AN AGREEMENT WITH CERES GREENHOUSE SOLUTIONS. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS AT THE JOB SITE AND SHALL NOTIFY THE DESIGN PROFESSIONAL OF ANY DISCREPANCIES, OMISSIONS, AND/OR CONFLICTS BEFORE PROCEEDING WITH THE WORK. THE CONTRACTORS ARE TO VERIFY ALL FIELD CONDITIONS BEFORE PROCEEDING WITH WORK. EACH SUB-CONTRACTOR IS TO FIELD VERIFY THE CONDITION OF THE SITE PRIOR TO COMMENCING THAT PORTION OF THE WORK AND IS TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE GENERAL CONTRACTOR AND THE DESIGN PROFESSIONAL BEFORE PROCEEDING. SUB-CONTRACTORS PROCEEDING WITH THEIR PORTION OF THE WORK WITHOUT REPORTING ANY DEFECTS IN PRIOR WORK WILL BE JUDGED TO HAVE ACCEPTED THE WORKING CONDITIONS AND AGREE THAT THEIR NEW WORK CAN ACCEPTABLY BE CONSTRUCTED ON THE WORK THAT HAS PRECEDED THEM. CONTRACTOR MUST COMPLY WITH THE RULES AND REGULATIONS OF AGENCIES HAVING JURISDICTION AND SHALL CONFORM TO ALL CITY, COUNTY, STATE, AND FEDERAL CONSTRUCTION, SAFETY AND SANITARY LAWS, CODES, STATUTES AND ORDINANCES. ALL FEES, TAXES, PERMITS, APPLICATIONS, AND CERTIFICATES OF INSPECTIONS, AND THE FILING OF ALL WORK WITH GOVERNMENTAL AGENCIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL WORK SHALL BE PERFORMED BY SKILLED AND QUALIFIED WORKMEN IN ACCORDANCE WITH THE BEST PRACTICES OF THOSE TRADES INVOLVED, AND IN COMPLIANCE WITH BUILDING REGULATIONS AND/OR GOVERNMENTAL LAWS, STATUTES OR ORDINANCES. CONTRACTORS SHALL BE RESPONSIBLE FOR THE DISTRIBUTION OF DRAWINGS AND/OR SPECIFICATIONS TO THE TRADES UNDER THEIR JURISDICTION. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE, TRUE, AND IN PROPER ALIGNMENT. ALL MATERIALS SHALL BE NEW, UNUSED AND OF THE HIGHEST QUALITY IN EVERY RESPECT, UNLESS NOTED OTHERWISE. MANUFACTURED MATERIALS AND EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS. ANY AND ALL FREIGHT DAMAGE OR LOSSES SHALL BE REPORTED WITHIN 24 HOURS OF DELIVERY. THERE SHALL BE NO SUBSTITUTION OF MATERIALS WHERE A MANUFACTURER IS SPECIFIED, WHERE THE TERMS "EQUAL TO", "EQUIVALENT" OR "APPROVED EQUAL" ARE USED THE ARCHITECT SHALL DETERMINE EQUALITY BASED ON INFORMATION SUBMITTED BY THE CONTRACTOR. CONTRACTOR SHALL AT ALL TIMES KEEP THE PREMISES FREE OF THE ACCUMULATION OF WASTE MATERIALS OR RUBBISH. PREMISES SHALL BE SWEPT CLEAN DAILY OF RELATED CONSTRUCTION DEBRIS AT THE COMPLETION OF THE WORK TO LEAVE THE JOB SITE FREE OF ALL MATERIALS. DO NOT SCALE DRAWINGS, DIMENSIONS SHALL GOVERN, LARGER SCALE DRAWINGS SHALL GOVERN SMALLER SCALE. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT TO REVIEW AND APPROVAL BY THE DESIGN PROFESSIONAL. THE CONTRACTOR SHALL CHECK AND COORDINATE WITH THE ELECTRICAL AND MECHANICAL CONTRACTORS FOR BLOCK-OUTS, CONDUIT, PIPE SLEEVES, EMBEDDED ITEMS, ETC. TO BE PLACED IN THE CONCRETE AND MASONRY, AS WELL AS OPENING IN THE STRUCTURE FOR MECHANICAL AND ELECTRICAL INSTALLATIONS. ANY CHANGE WHICH RESULTS IN EXTRA COST SHALL NOT PROCEED WITHOUT WRITTEN AUTHORIZATION OF THE OWNER AND THE DESIGN PROFESSIONAL. THE DESIGN, ADEQUACY, AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC. IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND HAS NOT BEEN CONSIDERED BY THE ARCHITECT OR ENGINEER. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE AND STRUCTURAL MEMBERS THROUGHOUT CONSTRUCTION. ANY AMBIGUITIES, DISCREPANCIES, OR CONFLICTS DISCOVERED THROUGH THE USE OF THESE DRAWINGS SHALL BE REPORTED IMMEDIATELY TO THE DESIGN PROFESSIONAL. THE CONTRACTOR IS RESPONSIBLE TO SECURE ANY AND ALL PERMITS, FEES, LABOR, EQUIPMENT, ETC. REQUIRED TO PROVIDE A COMPLETE PROJECT. THE CONTRACTOR IS REQUIRED TO PROVIDE THE NECESSARY STEPS TO FULLY PROTECT THE PUBLIC FROM INJURY AND ADJACENT PROPERTIES FROM DAMAGE DURING CONSTRUCTION AS REQUIRED BY LOCAL CODES. THE CONTRACTOR WILL ALSO PROVIDE FOR THE PROTECTION OF WORK TO DATE, ENSURING THAT NEW TRADES DO NOT DAMAGE THE FINISHED WORK OF OTHER TRADES. THE OWNER SHALL OBTAIN 'ALL RISK' INSURANCE FOR THE DURATION OF THE PROJECT. THE CONTRACTOR SHALL OBTAIN THE CUSTOMARY STATUTORY INSURANCES, COMPREHENSIVE GENERAL LIABILITY, WORKMAN'S COMPENSATION, ETC. THE DESIGN PROFESSIONAL AND THE OWNER SHALL BE NAMED AS AN INSURED PARTY TO THE 'ALL RISK' POLICY. DIMENSIONS SHOWN OUTSIDE OF BUILDING ARE FROM FACE OF FRAMING TO CENTER OF ROUGH OPENINGS OR FACE OF FRAMING, UNLESS NOTED OTHERWISE. DIMENSIONS SHOWN INSIDE OF BUILDING ARE FROM FACE OF FRAMING TO FACE OF FRAMING, UNLESS NOTED OTHERWISE.. DATE ISSUED SHEET NUMBER 1898 S Flatiron Ct Suite 125, Boulder, CO 80301 e. info@ceresgs.com p. 303.495.5006 THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, W ITHOUT WRITTEN AUTHORIZATION FROM CERES GREENHOUSE SOLUTIONS LLC. 9/1/2020 7/30/2021 A-1.0 PERSPECTIVES GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 A-1.0 3 SOUTH PERSPECTIVE A-1.0 2 SOUTH EAST PERSPECTIVE A-1.0 1 SOUTH WEST PERSPECTIVE A-1.0 4 NORTH WEST PERSPECTIVE A-1.0 6 EAST INTERIOR PERSPECTIVE A-1.0 5 WEST INTERIOR PERSPECTIVE 2 A-3.0 2 A-3.0 A-2.0 1 A-2.0 2 300 300 319300 1 A-3.0 1 A-3.0 300 335 300 2 2 3 3 12 12 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 13 13 1 1 A A B B H H 15 ' - 0 " 300 1' - 6 " 436.33 SF MECHANICAL 445.92 SF OFFICE 629.90 SF STORAGE 68.12 SF UNISEX RR #273.51 SF JANITORIAL 7240.00 SF GREENHOUSE E E 2 A-3.1 68.12 SF UNISEX RR #1 12 . 2 3 S F CL O S E T 300 300 A-5.0 2 A-5.1 1 A-5.1 2 1 A-3.1 3 A-3.0 3 A-3.0 A-5.2 1 WT-ROS WT-TRO WT-FPS P-BSP-BS P-URP-UR P-WCP-WC 1' - 6 " C-TM C-TM C-TM C-TMC-TM C-TM C-GEXC-GEXC-GEX C-GEX C-GEXC-GEX 9' - 8 " 4' - 3 1 / 2 " 4"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"4" G G F F D D C C 6' - 0 " 20 ' - 6 " 3' - 6 " 3' - 6 " 20 ' - 6 " 6' - 0 " 15 ' - 0 " 120' - 8" 31' - 11"15' - 3"64' - 0" 2' - 0 " 3' - 0" 3' - 0" 29 ' - 0 " 31 ' - 0 " 38' - 5"39' - 3"37' - 0" 3' - 0" 29 ' - 0 " 2' - 8"5' - 2"4' - 2" 60 ' - 0 " 7' - 7"2' - 9" 14 ' - 4 " 42' - 7 1/2"29' - 9"24' - 1 1/2" 7' - 0 1/2"7' - 0 1/2" 75 ' - 0 " 3' - 2 1/2"6' - 4" 6' - 8 1/2"9" 4' - 2 " 12 ' - 0 " 1' - 3 " 3' - 2 1 / 2 " 39 ' - 5 " A-2.0 4 A-2.0 3 NO SLAB SLAB NOTE: SLAB EXTENDS TO SOUTH FACE OF PARTITION WALL @ GL "B" AND WILL BE POURED AFTER PIERS AND FROST WALLS. SEE STRUCTURAL FOR DETAILS. 15 ' - 0 " S L A B 60 ' - 0 " N O S L A B DATE ISSUED SHEET NUMBER 1898 S Flatiron Ct Suite 125, Boulder, CO 80301 e. info@ceresgs.com p. 303.495.5006 THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, W ITHOUT WRITTEN AUTHORIZATION FROM CERES GREENHOUSE SOLUTIONS LLC. 9/1/2020 7/30/2021 A-1.1 FLOOR PLAN GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 SCALE: 3/16" = 1'-0"A-1.1 1 FLOOR PLAN KEYNOTE LEGEND KEY VALUE KEYNOTE TEXT C-GEX GAHT® EXHAUST C-TM AUTOMATED GAHT® TRANSITION MANIFOLD P-BS BATHROOM SINK - SEE FIXTURE SCHEDULE P-UR URINAL - SEE FIXTURE SCHEDULE P-WC WATER CLOSET - SEE FIXTURE SCHEDULE WT-FPS FOGGING PUMP SKID WT-ROS R.O. SKID WT-TRO 80 GALLON R.O. TREATED RESERVOIR Produced with a Trial Version of PDF Annotator - www.PDFAnnotator.com T.O. FND WALL 100' - 0" T.O. GH EAVE 112' - 0" GH PEAK 122' - 0" 1 A-3.0 1 A-3.0 2 2 3 3 12 12 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 13 13 1 1 319 300 M-E36M-E36M-E36M-E36M-E36M-E36M-E36M-E36 C-IMPW C-IMPR M-HEX C-RGF M-HEX C-RKF C-IMPW M-HEXM-HEXM-HEX C-FND T.O. FND WALL 100' - 0" T.O. KNEE WALL 103' - 0" T.O. GH EAVE 112' - 0" GH PEAK 122' - 0" 1 A-3.0 1 A-3.0 2 2 3 3 12 12 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 13 13 1 1 O.C. TYP. 3' - 0" M-I10 GZ-EW GZ-ER M-HEX C-RKF GZ-EF GZ-EC M-HEX C-IMPK M-I10 1' - 6 " C-FND T.O. FND WALL 100' - 0" 2 A-3.0 2 A-3.0 T.O. GH EAVE 112' - 0" GH PEAK 122' - 0" A A B B H H E E 3 A-3.0 3 A-3.0 G G F F D D C C M-I41M-I41 C-IMPW C-IMPR C-IMPW C-RKF GZ-EW M-HEX C-FND 3" / 12" 2 " / 1 2 " T.O. FND WALL 100' - 0" 2 A-3.0 2 A-3.0 T.O. GH EAVE 112' - 0" GH PEAK 122' - 0" A A B B H H E E 3 A-3.0 3 A-3.0 G G F F D D C C M-I41M-I41 C-IMPW GZ-E3 C-RKF GZ-ECM-HEX C-FND 3 " / 1 2 " 2" / 12" DATE ISSUED SHEET NUMBER 1898 S Flatiron Ct Suite 125, Boulder, CO 80301 e. info@ceresgs.com p. 303.495.5006 THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, W ITHOUT WRITTEN AUTHORIZATION FROM CERES GREENHOUSE SOLUTIONS LLC. 9/1/2020 7/30/2021 A-2.0 ELEVATIONS GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 SCALE: 1/8" = 1'-0"A-2.0 1 NORTH ELEVATION GH SCALE: 1/8" = 1'-0"A-2.0 2 SOUTH ELEVATION GH KEYNOTE LEGEND KEY VALUE KEYNOTE TEXT C-FND CONCRETE FOUNDATION RE: STRUCTURAL C-IMPK INSULATED METAL PANEL KNEE WALL BY AWIP C-IMPR INSULATED METAL PANEL ROOF BY AWIP C-IMPW INSULATED METAL PANEL WALL BY AWIP C-RGF RIDGE FLASHING BY AWIP C-RKF RAKE FLASHING BY AWIP GZ-E3 TRIPLE LAYER ETFE GLAZING GZ-EC ETFE CAP PROFILE GZ-EF ETFE TO KNEE WALL FLASHING GZ-ER TRIPLE LAYER ETFE GLAZED ROOF GZ-EW TRIPLE LAYER ETFE GLAZED WALL M-E36 36" EXHAUST FAN M-HEX UNIT HEATER EXHAUST M-I10 10' x 2' INSULATED METAL INTAKE LOUVER M-I41 41" INTAKE LOUVER SCALE: 1/8" = 1'-0"A-2.0 4 EAST ELEVATION GH SCALE: 1/8" = 1'-0"A-2.0 3 WEST ELEVATION GH T.O. FND WALL 100' - 0" B.O. GAHT SYSTEM 95' - 6" T.O. GH EAVE 112' - 0" 1 A-3.0 1 A-3.0 2 2 3 3 12 12 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 ' - 0 " O.C. TYP. 12' - 0" O.C. TYP. 12' - 0" O.C. TYP. 12' - 0" 300 300 300 319P-BSP-BS C-MBC-MB WT-FPS WT-TRO WT-ROS C-IMPR C-IMPW C-FND C-FND C-IN2 T.O. FND WALL 100' - 0" B.O. GAHT SYSTEM 95' - 6" GH PEAK 122' - 0" 1 A-3.0 1 A-3.0 2 2 3 3 12 12 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 13 13 1 1 A-5.2 4 A-5.2 5 300 O.C. TYP. 12' - 0" O.C. TYP. 12' - 0" O.C. TYP. 12' - 0" 300 C-RGF C-TM C-GF M-HAF M-E36 M-ERH C-TM C-GF M-E36 M-ERH M-HAF M-HAF M-E36 M-ERH C-MB C-IMPW C-TM C-GF C-MB C-GI C-GI C-GI GZ-E3GZ-E3 C-CS INSTALL NOTE: DO NOT EXCAVATE BELOW BOTTOM OF PIER! T.O. FND WALL 100' - 0" B.O. GAHT SYSTEM 95' - 6" 2 A-3.0 2 A-3.0 T.O. GH EAVE 112' - 0" GH PEAK 122' - 0" A A B B H H E E 3 A-3.0 3 A-3.0 G G F F D D C C M-E36 M-I41M-I41 M-ERH M-HAF M-ERH M-HAF C-TM C-TM C-GF C-GF C-MB GZ-E3 C-GI C-GEX M-HEX GZ-E3 C-IMPK C-GEXC-MB C-MB C-IMPR C-IMPW C-GC C-GEC C-GE C-MB C-MB 7' - 6" 300 300 C-CS C-FND INSTALL NOTE: DO NOT EXCAVATE BELOW BOTTOM OF PIER! C-IN2 15' - 7" SLAB 335 DATE ISSUED SHEET NUMBER 1898 S. FLATIRON CT. SUITE 125 BOULDER, CO 80301 e. info@ceresgs.com p. 303.495.5006 9/1/2020 7/30/2021 9/15/2021 A-3.0 SECTIONS GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 SCALE: 3/16" = 1'-0"A-3.0 2 HEADHOUSE SECTION SCALE: 3/16" = 1'-0"A-3.0 3 NORTH SOUTH INTERIOR SECTION GH SCALE: 3/16" = 1'-0"A-3.0 1 EAST WEST INTERIOR SECTION GH KEYNOTE LEGEND KEY VALUE KEYNOTE TEXT C-CS CONCRETE SLAB RE: STRUCTURAL C-FND CONCRETE FOUNDATION RE: STRUCTURAL C-GC GAHT® COUPLER C-GE GAHT® ELBOW C-GEC GAHT® ENDCAP C-GEX GAHT® EXHAUST C-GF FKD 18 GAHT® FAN C-GI GAHT® INTAKE C-IMPK INSULATED METAL PANEL KNEE WALL BY AWIP C-IMPR INSULATED METAL PANEL ROOF BY AWIP C-IMPW INSULATED METAL PANEL WALL BY AWIP C-IN2 2" POLYSTYRENE RIGID INSULATION C-MB PRE-ENGINEERED METAL BUILDING C-RGF RIDGE FLASHING BY AWIP C-TM AUTOMATED GAHT® TRANSITION MANIFOLD GZ-E3 TRIPLE LAYER ETFE GLAZING M-E36 36" EXHAUST FAN M-ERH ELECTRIC RESISTANCE UNIT HEATER M-HAF HAF FAN M-HEX UNIT HEATER EXHAUST M-I41 41" INTAKE LOUVER P-BS BATHROOM SINK - SEE FIXTURE SCHEDULE WT-FPS FOGGING PUMP SKID WT-ROS R.O. SKID WT-TRO 80 GALLON R.O. TREATED RESERVOIR T.O. FND WALL 100' - 0" B.O. GAHT SYSTEM 95' - 6" GH PEAK 122' - 0" A-5.2 2 100K BTU ELECTRIC MODINE HEATER AUTOMATED GAHT® TRANSITION MANIFOLD 18" DIA. GAHT® INTAKE PIPE 15 ' - 1 0 1 / 2 " 6' - 1 1 / 2 " FKD 18 GAHT® FAN C 3x4.1 GALVANIZED GIRT RE: STRUCTURAL 41" SQ. INSULATED LOUVER 6" CONCRETE SLAB RE: STRUCTURAL CONCRETE PIER BEYOND RE: STRUCTURAL 18" GAHT® ELBOW 18" GAHT® COUPLERS 18" DIA. GAHT® PIPE T.O. FND WALL 100' - 0" B.O. GAHT SYSTEM 95' - 6" T.O. KNEE WALL 103' - 0" T.O. GH EAVE 112' - 0" A-5.2 6 A-5.2 3 W 18x35 COLUMN RE: STRUCTURAL W 24x62 RAFTER RE: STRUCTURAL C 3x4.1 GALVANIZED GIRT RE: STRUCTURAL ROTATED C 3x4.1 GALVANIZED GIRT RE: STRUCTURAL C 3x4.1 GALVANIZED PURLIN RE: STRUCTURAL 10' x 2' INSULATED INTAKE LOUVER INSULATED METAL PANEL KNEE WALL BY AWIP 2" POLYSTYRENE RIDGID INSULATION AROUND EXTERIOR PERIMETER TYP. 6" CONCRETE FROST WALL AROUND BUILDING PERIMETER RE: STRUCTURAL EAVE FLASHING BY AWIP ETFE GLAZING TRACK ASSEMBLY TRIPLE LAYER ETFE GLAZING TRIPLE LAYER ETFE GLAZING 6" 4' - 6 " DATE ISSUED SHEET NUMBER 1898 S. FLATIRON CT. SUITE 125 BOULDER, CO 80301 e. info@ceresgs.com p. 303.495.5006 9/1/2020 7/30/2021 9/15/2021 A-3.1 WALL SECTIONS GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 SCALE: 1/2" = 1'-0"A-3.1 1 NORTH PEAK WALL SECTION SCALE: 1/2" = 1'-0"A-3.1 2 SOUTH WALL SECTION DATE ISSUED SHEET NUMBER 1898 S. FLATIRON CT. SUITE 125 BOULDER, CO 80301 e. info@ceresgs.com p. 303.495.5006 9/1/2020 7/30/2021 9/15/2021 A-4.0 STANDARD FAN, LOUVER & DOOR DETAILS GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 ETFE PROFILES -3'-0" O.C. -SEE A-5.2 FOR DETAILS TRIPLE LAYER ETFE WALL GLAZING FLASHING -SEE A-5.2 & AWIP DRAWINGS FOR MORE DETAILED INFORMATION CL CL 3' - 0" CL CL 3' - 0" A-5.2 10 A-5.2 9 A-5.1 1 A-5.1 2 CLCL 1' - 9"3' - 0" ETFE PROFILES -EDGE SPACING 1'-9" -3'-0" O.C. FOR ALL OTHER TRACKS -SEE A-5.2 FOR DETAILS TRIPLE LAYER ETFE WALL GLAZING FLASHING -SEE A-5.2 & AWIP DRAWINGS FOR MORE DETAILED INFORMATION CLCL 3' - 0"1' - 9" A-5.2 14 A-5.2 13 DATE ISSUED SHEET NUMBER 1898 S Flatiron Ct Suite 125, Boulder, CO 80301 e. info@ceresgs.com p. 303.495.5006 THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, W ITHOUT WRITTEN AUTHORIZATION FROM CERES GREENHOUSE SOLUTIONS LLC. 9/1/2020 7/30/2021 A-5.0 ETFE ROOF & SOUTH WALL GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 SCALE: 1/4" = 1'-0"A-5.0 2 ETFE LAYOUT SOUTH ELEVATION SCALE: 1/8" = 1'-0"A-5.0 1 ETFE ROOF LAYOUT PLAN ETFE PROFILES -3'-0" O.C. -SEE A-5.2 FOR DETAILS TRIPLE LAYER ETFE WALL GLAZING FLASHING -SEE A-5.2 & AWIP DRAWINGS FOR MORE DETAILED INFORMATION CLCL 3' - 0" A-5.2 12 A-5.2 11 1' - 6" ADDITIONAL GLAZING BAR REQUIRED AT ENDS TYP. CLCL 3' - 0" ETFE PROFILES -3'-0" O.C. -SEE A-5.2 FOR DETAILS TRIPLE LAYER ETFE WALL GLAZING FLASHING -SEE A-5.2 & AWIP DRAWINGS FOR MORE DETAILED INFORMATION A-5.2 7 A-5.2 8 1' - 7" ADDITIONAL GLAZING BAR REQUIRED AT ENDS TYP. DATE ISSUED SHEET NUMBER 1898 S Flatiron Ct Suite 125, Boulder, CO 80301 e. info@ceresgs.com p. 303.495.5006 THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, W ITHOUT WRITTEN AUTHORIZATION FROM CERES GREENHOUSE SOLUTIONS LLC. 9/1/2020 7/30/2021 A-5.1 ETFE EAST & WEST WALL GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 SCALE: 1/4" = 1'-0"A-5.1 2 ETFE LAYOUT WEST ELEVATION SCALE: 1/4" = 1'-0"A-5.1 1 ETFE LAYOUT EAST ELEVATION DATE ISSUED SHEET NUMBER 1898 S. FLATIRON CT. SUITE 125 BOULDER, CO 80301 e. info@ceresgs.com p. 303.495.5006 9/1/2020 7/30/2021 9/15/2021 A-5.2 ETFE DETAILS GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 A-5.2 1 ETFE TO ETFE CORNER DETAIL A-5.2 3 ETFE SOUTH EAVE A-5.2 4 ETFE TO ETFE TRANSITION RAKE DETAIL A-5.2 5 ETFE TO IMP TRANSITION RAKE DETAIL A-5.2 6 ETFE TO KNEE WALL TRANSITION A-5.2 7 ETFE EAST WALL RAKE MITER A-5.2 8 ETFE EAST WALL BOTTOM A-5.2 9 ETFE SOUTH WALL TOP A-5.2 10 ETFE SOUTH WALL BOTTOM A-5.2 11 ETFE WEST WALL RAKE MITER A-5.2 12 ETFE WEST WALL BOTTOM A-5.2 13 ETFE ROOF RIDGE A-5.2 14 ETFE ROOF SOUTH EAVE A-5.2 2 ETFE ROOF RIDGE APEX (3) STAGGERED ROWS OF 4" SINGLE WALL/ PERFORATED/ SLEEVED PIPE @ 2' 6" O.C. 18" SOLID/ DOUBLE WALL HDPE PIPE. W/ DRILLED WEEP HOLE AT BOTTOM. 2 2 3 3 12 12 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 13 13 1 1 B B H H E E 2' - 6 " G G F F D D C C C-GC C-GEC C-GC C-GC C-GEC C-GC C-GC C-GE C-GC C-GEC C-GC C-GE C-GC C-GEC C-GC C-GE C-GC C-GE C-GEC C-GC C-GE C-GIC-GI C-GI C-GI C-GI C-GI C-GEX C-GEX C-GEX C-GEXC-GEXC-GEX CONCRETE PIER FOUNDATION RE: STRUCTURAL 6" FROST WALL RE: STRUCTURAL 2" POLYSTYRENE RIDGID INSULATION AROUND EXTERIOR OF FROST WALL CONCRETE PIER RE: STRUCTURAL 1' - 1 1 " 2' - 8" 1' - 1 1 " 6' - 11"5' - 1" 1' - 1 1 " 1' - 1 1 " 2' - 8" 1' - 0 " 2' - 8"4' - 2" 1' - 0 " 1' - 0 " 2' - 8" 2' - 0 " 2' - 3" 2' - 11" 2' - 0 " 2' - 11" 1' - 0 " 2' - 8" 2' - 6" 36' - 2 1/2"2' - 8"2' - 2 1/2"37' - 9"36' - 2 1/2"2' - 8" 36' - 0"2' - 5 1/2"2' - 9"36' - 6"3' - 8"33' - 4" 2 A-6.0 2 A-6.0 DRILLED WEEP HOLE 4" HOLE DRILLED FOR 4" GAHT PIPE 3 LAYERS OF 8 PIPES/ STAGGERED 18" SOLID/ SINGLE WALL HDPE PIPE BE L O W B . O . S L A B 4' - 0 " 1' - 0 " 1 ' - 0 " 2 ' - 0 " FROST WALL VARIES 2" OF RIGID INSULATION 6"2" INSTALL NOTE: MUST NOT EXCAVATE BELOW B.O. FROST WALL OR CONCRETE PIERS! T.O. FND WALL 100' - 0" B.O. GAHT SYSTEM 95' - 6" GH PEAK 122' - 0" B B H H E E G G F F D D C C 20' - 0" CUT LENGTH 5' - 2 " C U T L E N G T H 3' - 2 " 9' - 6 " C U T L E N G T H 5' - 2 " C U T L E N G T H 3' - 2 " 6' - 6 " C U T L E N G T H C-GI C-TM C-GF C-GI C-GI C-TM C-GF C-GI C-GCC-GC C-H4 C-H18C-GE C-H4 C-H18 CU T L E N G T H 3' - 6 " 20' - 0" CUT LENGTH 1' - 6 " C-GC C-GE C-GEX 2' - 6" O.C. TYP.2' - 6" O.C. TYP. DATE ISSUED SHEET NUMBER 1898 S Flatiron Ct Suite 125, Boulder, CO 80301 e. info@ceresgs.com p. 303.495.5006 THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, W ITHOUT WRITTEN AUTHORIZATION FROM CERES GREENHOUSE SOLUTIONS LLC. 9/1/2020 7/30/2021 A-6.0 GAHT® DESIGN GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 SCALE: 3/16" = 1'-0"A-6.0 1 GAHT PLAN SCALE: 1/2" = 1'-0"A-6.0 3 18" PIPE SECTION GAHT MATERIAL SCHEDULE QTY TAG DESCRIPTION SIZE VENDOR 12 C-GE new GAHT ELBOW 18"ø-18"ø AGS 35 C-GC GAHT COUPLER 18"ø-18"ø AGS 12 C-GEC GAHT ENDCAP 18"ø AGS KEYNOTE LEGEND KEY VALUE KEYNOTE TEXT C-GC GAHT® COUPLER C-GE GAHT® ELBOW C-GEC GAHT® ENDCAP C-GEX GAHT® EXHAUST C-GF FKD 18 GAHT® FAN C-GI GAHT® INTAKE C-H4 4" DIA. PERFORATED HDPE GAHT® PIPE C-H18 18" DIA. SOLID/ SINGLE WALL HDPE PIPE C-TM AUTOMATED GAHT® TRANSITION MANIFOLD SCALE: 3/16" = 1'-0"A-6.0 2 GAHT® SECTION CLCLCLCL 18 C-H18 20' L HDPE SOLID PIPE 18" Ø AGS 69 C-H4 100' L HDPE PERF. PIPE 4" Ø AGS BACKFILL WITH LOAMY SOIL FOR BEST PERFORMANCE 2 2 3 3 12 12 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 13 13 1 1 A A B B H H E E G G F F D D C C 80 GAL. STORAGE TANK BY OTHERS C-TM C-GF M-E36 M-ERH M-E36 C-TM M-E36 C-GF M-E36 M-ERH M-E36 C-GF C-TM M-E36 M-E36 M-ERH M-E36 C-GF C-TM M-HAF M-HAF M-HAFM-HAFM-HAFM-HAF M-HAF M-I10 M-I10 M-I10 M-I10 M-I41 M-I41 M-I41 M-I41 M-ERH C-GF C-TM M-ERH C-TM C-GF M-HAF M-HAFM-HAF M-HAF M-HAF M-HAF M-HAF M-HAF M-HAF M-HAF WT-FPS WT-ROS DATE ISSUED SHEET NUMBER 1898 S Flatiron Ct Suite 125, Boulder, CO 80301 e. info@ceresgs.com p. 303.495.5006 THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, W ITHOUT WRITTEN AUTHORIZATION FROM CERES GREENHOUSE SOLUTIONS LLC. 9/1/2020 7/30/2021 A-7.0 ELECTRICAL PLAN GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 SCALE: 3/16" = 1'-0"A-7.0 1 ELECTRICAL PLAN ELECTRICAL/MECHANICAL SCHEDULE TAG QTY COMPONENT VOLTAGE AMPERAGE MODEL # VENDOR NOTES M-E36 8 36" EXHAUST FAN W/ LOUVER 230 4.9 FG36H CANARM FIBERGLASS FAN M-I41 4 41" INTAKE LOUVER 24 0 TICD-52 POTTORFF M-I10 4 10'X2' INTAKE LOUVER 24 0 TICD-52 POTTORFF GC TO PROVIDE ADDITIONAL BLOCKING AS NEEDED FOR INSTAL M-HAF 18 18" CIRCULATION FAN 115 1.45 LF18HVW CANARM RECOMMENDED INSTALL HEIGHT OF 10' - 12' M-ERH 5 100K BTU MODINE HEATER 120 4.2 107441N MODINE RECOMMENDED INSTALL HEIGHT OF 10' - 12' C-GF 6 FKD 18 GAHT FAN 120 12.04 FKD-18 FANTEK FKD 18 GAHT FAN RATED @4448CFM C-TM 6 AUTOMATED GAHT TRANSITION MANIFOLD 24 0 CERES CUSTOM AIR MECHANICAL INC. SEE GAHT WIRING DIAGRAM WT-ROS 1 460 3.5 AXEON WT-FPS 1 460 30 COLD FOG PROVIDED BY OTHERSRO SKID FOGGING SKID CF6S-3.3 DATE ISSUED SHEET NUMBER 1898 S Flatiron Ct Suite 125, Boulder, CO 80301 e. info@ceresgs.com p. 303.495.5006 THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR IN PART, W ITHOUT WRITTEN AUTHORIZATION FROM CERES GREENHOUSE SOLUTIONS LLC. 9/1/2020 7/30/2021 A-8.0 SCHEDULES GR E E N H O U S E C O M P L E X AN D Y B R U N O 36 4 S T O R M K I N G R O A D , N E W C A S T L E , C O 8 1 6 4 7 DOOR SCHEDULE TAG QTY DESCRIPTION SIZE ROUGH WIDTH ROUGH HIEGHTWIDTH HEIGHT 300 8 CERES 30-68 SINGLE DOOR 3' - 0" 6' - 8" 3' - 2 1/2" 6' - 10" 319 1 60-68 DOUBLE DOOR 6' - 0" 6' - 8" 6' - 4" 6' - 10" 335 1 12x12 GARAGE DOOR 12' - 0" 12' - 0" 12' - 2" 12' - 1" Grand total: 10 ELECTRICAL/MECHANICAL SCHEDULE TAG QTY COMPONENT VOLTAGE AMPERAGE MODEL # VENDOR NOTES M-E36 8 36" EXHAUST FAN W/ LOUVER 230 4.9 FG36H CANARM FIBERGLASS FAN M-I41 4 41" INTAKE LOUVER 24 0 TICD-52 POTTORFF M-I10 4 10'X2' INTAKE LOUVER 24 0 TICD-52 POTTORFF GC TO PROVIDE ADDITIONAL BLOCKING AS NEEDED FOR INSTAL M-HAF 18 18" CIRCULATION FAN 115 1.45 LF18HVW CANARM RECOMMENDED INSTALL HEIGHT OF 10' - 12' M-ERH 5 100K BTU MODINE HEATER 120 4.2 107441N MODINE RECOMMENDED INSTALL HEIGHT OF 10' - 12' C-GF 6 FKD 18 GAHT FAN 120 12.04 FKD-18 FANTEK FKD 18 GAHT FAN RATED @4448CFM C-TM 6 AUTOMATED GAHT TRANSITION MANIFOLD 24 0 CERES CUSTOM AIR MECHANICAL INC. SEE GAHT WIRING DIAGRAM WT-ROS 1 460 3.5 AXEON WT-FPS 1 460 30 COLD FOG FINISH SCHEDULE ROOM NAME FLOOR WALL FINISH CEILING REMARKSN E S W MECHANICAL SEALED CONCRETE IMP W/ EXPOSED FRAMING IMP W/ EXPOSED FRAMING IMP W/ EXPOSED FRAMING IMP W/ EXPOSED FRAMING IMP W/ EXPOSED FRAMING OFFICE SEALED CONCRETE IMP W/ EXPOSED FRAMING 5/8" GYP. OR SIMILAR IMP (NO FRAMING) 5/8" GYP. OR SIMILAR IMP W/ EXPOSED FRAMING GYP. & STICK FRAMING BY GENERAL CONTRACTOR STORAGE SEALED CONCRETE IMP W/ EXPOSED FRAMING IMP W/ EXPOSED FRAMING IMP (NO FRAMING) 5/8" GYP. OR SIMILAR IMP W/ EXPOSED FRAMING GYP. & STICK FRAMING BY GENERAL CONTRACTOR UNISEX RR #2 SEALED CONCRETE 5/8" GYP. OR SIMILAR 5/8" GYP. OR SIMILAR IMP (NO FRAMING) 5/8" GYP. OR SIMILAR IMP W/ EXPOSED FRAMING GYP. & STICK FRAMING BY GENERAL CONTRACTOR JANITORIAL SEALED CONCRETE 5/8" GYP. OR SIMILAR 5/8" GYP. OR SIMILAR IMP (NO FRAMING) IMP W/ EXPOSED FRAMING IMP W/ EXPOSED FRAMING GYP. & STICK FRAMING BY GENERAL CONTRACTOR GREENHOUSE SEALED CONCRETE IMP W/ EXPOSED FRAMING IMP, EXPOSED FRAMING & ETFE GLAZING IMP KNEE WALL & ETFE GLAZING IMP, EXPOSED FRAMING &ETFE GLAZING TRIPLE LAYER ETFE GLAZING UNISEX RR #1 SEALED CONCRETE 5/8" GYP. OR SIMILAR 5/8" GYP. OR SIMILAR IMP (NO FRAMING) 5/8" GYP. OR SIMILAR IMP W/ EXPOSED FRAMING GYP. & STICK FRAMING BY GENERAL CONTRACTOR CLOSET SEALED CONCRETE IMP W/ EXPOSED FRAMING 5/8" GYP. OR SIMILAR 5/8" GYP. OR SIMILAR IMP W/ EXPOSED FRAMING IMP W/ EXPOSED FRAMING GYP. & STICK FRAMING BY GENERAL CONTRACTOR GAHT MATERIAL SCHEDULE QTY TAG DESCRIPTION SIZE VENDOR 12 C-GE new GAHT ELBOW 18"ø-18"ø AGS 35 C-GC GAHT COUPLER 18"ø-18"ø AGS 12 C-GEC GAHT ENDCAP 18"ø AGS PROJECT KEYNOTES KEY VALUE KEYNOTE TEXT C-CS CONCRETE SLAB RE: STRUCTURAL C-FND CONCRETE FOUNDATION RE: STRUCTURAL C-GC GAHT® COUPLER C-GE GAHT® ELBOW C-GEC GAHT® ENDCAP C-GEX GAHT® EXHAUST C-GF FKD 18 GAHT® FAN C-GI GAHT® INTAKE C-H4 4" DIA. PERFORATED HDPE GAHT® PIPE C-H18 18" DIA. SOLID/ SINGLE WALL HDPE PIPE C-IMPK INSULATED METAL PANEL KNEE WALL BY AWIP C-IMPR INSULATED METAL PANEL ROOF BY AWIP C-IMPW INSULATED METAL PANEL WALL BY AWIP C-IN2 2" POLYSTYRENE RIGID INSULATION C-MB PRE-ENGINEERED METAL BUILDING C-RGF RIDGE FLASHING BY AWIP C-RKF RAKE FLASHING BY AWIP C-TM AUTOMATED GAHT® TRANSITION MANIFOLD GZ-E3 TRIPLE LAYER ETFE GLAZING GZ-EC ETFE CAP PROFILE GZ-EF ETFE TO KNEE WALL FLASHING GZ-ER TRIPLE LAYER ETFE GLAZED ROOF GZ-EW TRIPLE LAYER ETFE GLAZED WALL M-E36 36" EXHAUST FAN M-ERH ELECTRIC RESISTANCE UNIT HEATER M-HAF HAF FAN M-HEX UNIT HEATER EXHAUST M-I10 10' x 2' INSULATED METAL INTAKE LOUVER M-I41 41" INTAKE LOUVER P-BS BATHROOM SINK - SEE FIXTURE SCHEDULE P-UR URINAL - SEE FIXTURE SCHEDULE P-WC WATER CLOSET - SEE FIXTURE SCHEDULE WT-FPS FOGGING PUMP SKID WT-ROS R.O. SKID WT-TRO 80 GALLON R.O. TREATED RESERVOIR ** IMPORTANT! Unpack and inventory all materials against their Bill of Materials or Inventory List within 5 days of delivery. If any materials are damaged or missing, inform Ceres Greenhouse Solutions immediately. If there is no Bill of Materials or Inventory List included in the shipment, please inform Ceres. ** When doing the inventory for the INSULATED METAL PANELS from All Weather Insulated Panels, count the panels, count the trim, count the fasteners, and verify that the number of boxes of screws matches the inventory list. ** Client is responsible for storing materials on site in such a way that protects them from exposure to the elements. If no indoor storage is available, it is recommended that shipments be securely tarped to prevent water infiltration, stored off the ground (on top of pallets), and placed out of direct sunlight. PROVIDED BY OTHERSRO SKID FOGGING SKID CF6S-3.3 18 C-H18 20' L HDPE SOLID PIPE 18" Ø AGS 69 C-H4 100' L HDPE PERF. PIPE 4" Ø AGS 4'-0" 2 ' - 0 " 2'-0" 7 6 ' - 1 0 " FR O S T W A L L O U T - T O - O U T 2 ' - 0 " 2'-0" 4 ' - 0 " 8" F R O S T W A L L AT P E R I M E T E R 1 4 ' - 1 1 " 8 " 122'-0" STEM WALL OUT-TO-OUT 8 " 1 1 ' - 6 " 1 2 ' - 0 " 1 2 ' - 0 " 1 ' - 9 " 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 7 ' - 0 " 2 0 ' - 6 " 5 ' - 6 " 1 ' - 9 " 7 ' - 6 " 1 6 ' - 0 " 1'-0" 1'-0" 1 ' - 0 " 1 5 ' - 1 " 1 5 ' - 7 " 1 5 ' - 6 " 2 0 ' - 6 " 5 ' - 6 " 1 5 ' - 1 " 1 5 ' - 7 " 5 ' - 0 " 1 5 ' - 0 " 6 ' - 0 " 2 0 ' - 6 " 3 ' - 6 " 3 ' - 6 " 2 0 ' - 6 " 6 ' - 0 " 4" 4" 7 5 ' - 0 " S T E E L O U T - T O - O U T 120'-8" STEEL OUT-TO-OUT 1 ' - 0 " 1'-0" 7 " 1 ' - 3 " NORTH PLAN VIEW SCALE: 1/8" = 1'-0" PIER A1PIER A1PIER A1PIER A1PIER A1PIER A1PIER A1PIER A1PIER A1 PIER B PIER B PIER B PIER BPIER BPIER BPIER BPIER B PIER B PIER B PIER B PIER B PIER B PIER B PIER B PIER B PIER B PIER B PIER B PIER B PIER A2 PIER A2 PIER A2 PIER A2 PIER A2 PIER A2 PIER A2 PIER A2 PIER A2 PIER B SLAB POURED LATER NON-STRUCTURAL WALL, CAN BE ADDED AT A LATER DATE SAME REINFORCEMENT DETAILS AS FROST WALL AA C C D D E E F F G G H H B B 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 1 4 ' - 6 " 122'-0" SOUTH ELEVATIONSCALE: 1/8" = 1'-0" 8" FROST WALL 1 ' - 0 " TY P . 1'-3" 6" FROST WALL DETAIL VIEW SCALE: 1/2" = 1'-0" #4 REBAR @ 12" SPACING BOTH WAYS #5 VERTICAL @ 18" #4 REBAR CONTINOUS (5) PLACES SLAB POURED LATER #6 DOWEL BAR @ 6" O.C. EPOXY NOTES: FOUNDATION: THE FOUNDATION SHALL REST ON SOUND SOIL1. THAT IS FREE OF ORGANIC AND DELETERIOUS MATERIALS AND CAPABLE OF SUPPORTING 1500 PSF VERTICAL BEARING PRESSURE AND 100 PSF/FT LATERAL BEARING PRESSURE. FOUNDATION DESIGN SHOWN IS BASED ON2. THE MINIMUM PRESUMPTIVE SOILSTRENGTHS FROM THE SPECIFIED BUILDING CODE. OWNER SHALL VERIFY ACTUAL SOIL CONDITIONS AT EACH JOB SITE AND ANY REQUIRED ADJUSTMENTS TO THE FOOTING DESIGN SHALL BE DESIGNED BY OTHERS. CONCRETE: COMPRESSION STRENGTH OF ALL1. REINFORCED CONCRETE SHALL NOT BE LESS THAN 4000 PSI AT 28 DAYS. REINFORCING BARS SHALL BE DEFORMED2. BARS CONFORMING TO THE REQUIREMENTS OF MINIMUM ASTM A615 GRADE 40 FOR #4 AND SMALLER BARS AND GRADE 60 FOR BARS LARGER THAN #4. MINIMUM CONCRETE CLEAR COVER FOR3. REINFORCING BARS SHALL BE 3". ANCHOR RODS SHALL BE F1554 GRADE 364. ROD, HEADED, OR WITH HEAVY HEX NUT TACKED TO ROD. DESIGN PARAMETERS: SOILD DESIGN BEARING STRENGTH 1500 PSF.1. BUILDING CODE IBC 2015, ACI 318-14.2. FOUNDATION SHEET NUMBER: EN G I N E E R : DR . A L G O N Z A L E Z P . E . P H D DO T E C E N G I N E E R I N G 42 4 J E F F E R S O N S T R E E T ST . C H A R L E S , M O 6 3 3 0 1 PH 6 3 6 - 7 2 4 - 9 8 7 2 FA X 6 3 6 - 7 2 4 - 9 0 3 2 WW W . D O T E C E N G I N E E R I N G . C O M AL G @ D O T E C E N G I N E E R I N G . C O M MA N U F A C T U E R : CE R E S G R E E N H O U S E SO L U T I O N S 18 9 8 S . F L A T I R O N C T . S U I T E 1 2 5 BO U L D E R , C O 8 0 3 0 1 PH 3 0 3 - 4 9 5 - 5 0 0 6 CE R E S G S . C O M IN F O @ C E R E S G S . C O M PR O F E S S I O N A L S E A L : CHECKED BY:DRAWN BY: PO NUMBER:JOB NUMBER: TITLE: OW N E R : 00045 2006087 BQ ALG SI T E A D D R E S S : AN D Y B R U N O 36 4 S T O R M K I N G R D NE W C A S T L E C O 8 1 6 4 7 A A B B C C D D 8 8 7 7 6 6 5 5 4 4 3 3 2 2 1 1 09 / 1 0 / 2 0 2 1 4'-0" 4 ' - 6 " 8 " EM B E D M E N T 12 " B A S E P L A T E 1 ' - 0 " T Y P . 3/4 HEAVY HEX BOLT FLAT WASHER HEX NUTPLATE A/B PIER A1/A2 PIER A1/A2 SIDE VIEWSCALE: 1" = 1'-0" 4'-0" 4 ' - 6 " 8 " EM B E D M E N T 1 ' - 0 " T Y P . PLATE A/B PIER A1/A2 END VIEW SCALE: 1" = 1'-0" PIER A1/A2 4 ' - 6 " 2'-0" 6 " EM B E D M E N T 12 " BA S E P L A T E 1 ' - 0 " T Y P . 3/4 HEAVY HEX BOLT FLAT WASHER HEX NUTPLATE C/D/E PIER B PIER B SIDE VIEWSCALE: 1" = 1'-0" 2'-0" 4 ' - 6 " 6 " EM B E D M E N T 1 ' - 0 " T Y P . PIER B PLATE C/D/E PIER B END VIEWSCALE: 1" = 1'-0" 4'-0" 4 ' - 0 " 3" 3 " PLATE A/B PIER A1/A2 PLAN VIEWSCALE: 1" = 1'-0" #4 @ 12" (16) #8 REBAR VERTICAL PIER A1/A2 2 ' - 0 " 2'-0" 1'-0" 3 " 6 " PIER B PLATE C/D/E PIER B PLAN VIEWSCALE: 1" = 1'-0" #4 @ 12" (8) #6 REBAR VERTICAL NOTES: CENTRALIZE BASE PLATE AT EACH PIER.1. REFER PLATE SIZE AND ANCHOR LOCATION IN FRAMING DRAWING.2. PIER DETAILS SHEET NUMBER: EN G I N E E R : DR . A L G O N Z A L E Z P . E . P H D DO T E C E N G I N E E R I N G 42 4 J E F F E R S O N S T R E E T ST . C H A R L E S , M O 6 3 3 0 1 PH 6 3 6 - 7 2 4 - 9 8 7 2 FA X 6 3 6 - 7 2 4 - 9 0 3 2 WW W . D O T E C E N G I N E E R I N G . C O M AL G @ D O T E C E N G I N E E R I N G . C O M MA N U F A C T U E R : CE R E S G R E E N H O U S E SO L U T I O N S 18 9 8 S . F L A T I R O N C T . S U I T E 1 2 5 BO U L D E R , C O 8 0 3 0 1 PH 3 0 3 - 4 9 5 - 5 0 0 6 CE R E S G S . C O M IN F O @ C E R E S G S . C O M PR O F E S S I O N A L S E A L : CHECKED BY:DRAWN BY: PO NUMBER:JOB NUMBER: TITLE: OW N E R : 00045 2006087 BQ ALG SI T E A D D R E S S : AN D Y B R U N O 36 4 S T O R M K I N G R D NE W C A S T L E C O 8 1 6 4 7 A A B B C C D D 8 8 7 7 6 6 5 5 4 4 3 3 2 2 1 1 09 / 1 0 / 2 0 2 1 1 ' - 9 " 1 1 ' - 6 " 1 2 ' - 0 " 1 2 ' - 0 " 7 ' - 6 " 1 6 ' - 0 " 1 5 ' - 1 " 1 ' - 0 " 7 6 ' - 1 0 " SL A B / F R O S T W A L L O U T - T O - O U T 1 ' - 9 " 5 ' - 6 " 2 0 ' - 6 " 7 ' - 0 " 2 0 ' - 6 " 5 ' - 6 " 1 5 ' - 1 " 1 ' - 0 " 1 7 ' - 7 " 4'-0" 2'-0" 122'-0" SLAB/FROST WALL OUT-TO-OUT 4 ' - 0 " 2'-0" 2 ' - 0 " 5 7 ' - 3 " 1 4 ' - 3 " SL A B 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 1'-0" 12'-0" 1'-0" 1'-0" NORTH PIER A2 PLAN VIEWSCALE: 1/8" = 1'-0" PIER A1 PIER B PIER B PIER B PIER A1 PIER A1 PIER A1 PIER A1 PIER A1 PIER A1 PIER A1 PIER A1 PIER B PIER B PIER B PIER B PIER B PIER BPIER BPIER BPIER BPIER BPIER BPIER B PIER B PIER BPIER B PIER B PIER B PIER B PIER A2PIER A2PIER A2PIER A2PIER A2 PIER A2 PIER A2 PIER A2 NO SLAB THIS AREA PIER B SLAB AREA POURED LATER SOUTH ELEVATION SCALE: 1/8" = 1'-0" MICRO PILE DESIGN BY OTHERS MICROPILE PLAN NOTES: MICRO PILE DESIGN BY OTHERS1. SHEET NUMBER: EN G I N E E R : DR . A L G O N Z A L E Z P . E . P H D DO T E C E N G I N E E R I N G 42 4 J E F F E R S O N S T R E E T ST . C H A R L E S , M O 6 3 3 0 1 PH 6 3 6 - 7 2 4 - 9 8 7 2 FA X 6 3 6 - 7 2 4 - 9 0 3 2 WW W . D O T E C E N G I N E E R I N G . C O M AL G @ D O T E C E N G I N E E R I N G . C O M MA N U F A C T U E R : CE R E S G R E E N H O U S E SO L U T I O N S 18 9 8 S . F L A T I R O N C T . S U I T E 1 2 5 BO U L D E R , C O 8 0 3 0 1 PH 3 0 3 - 4 9 5 - 5 0 0 6 CE R E S G S . C O M IN F O @ C E R E S G S . C O M PR O F E S S I O N A L S E A L : CHECKED BY:DRAWN BY: PO NUMBER:JOB NUMBER: TITLE: OW N E R : 00045 2006087 BQ ALG SI T E A D D R E S S : AN D Y B R U N O 36 4 S T O R M K I N G R D NE W C A S T L E C O 8 1 6 4 7 A A B B C C D D 8 8 7 7 6 6 5 5 4 4 3 3 2 2 1 1 09 / 1 0 / 2 0 2 1