Loading...
HomeMy WebLinkAboutEngineer's OWTS Design Planrrr @\bI TOM CRONI( ENGINEERING, tnc. 1737 -24- Road, Grand Junction, CO 81509 Grand Junction (970) 640-5Q29. Glenwood Springs/Aspen (970) 640-5029 . Montlose/Delta (970) 640-5429 Email: ccigi@msn.com ONSITE WASTEWATER TREATMENT SYSTEM DESIGN Date Prepared by Thomas A. Cronk, P.E. Tom Cronk Engineering Inc. ll3l -24- Road Grand Junction, CO 81505 970-640-s029 Type of Design: New Residential Client Papa Family Cabin 3s4 CR 31 1 silt, co 8t652 Property address: 354 CR 31 l, Silt, CO 8i652 Tax schedule No.: 2179-lA4-00-176 Legal Descript.: c/o Extreme Construction Grand Junction, CO 81505 970-2ss-81r6 1 1.0 Site History Tlre site consists of approxirnately I 1.19 acres of cultivated native soil. Drainage is approximately lYoto tlre soutlr. A percolation testisoils evaluation was conducted on the property of reference on 0412112025 by Tom A. Cronk, registercd professional engineer (R.P.E). A new three bedroom residence and two RV parking spaces are proposed for the site. The proposed construction will require installation of a new onsite wastewater treatment systern (OWTS to serve sewage loadings from the proposed residence and RV parking spots. The 04121/2025 site investigation will be used to provide design parameters for the new OWTS. Arr OWTS design lras been prepared for the project based on inforrnation disclosed during the 04121DA25 site investigatioirs. A discussion of the engineered OWTS design follows. The 04/2112025 perc test/soils evaluationis attached for reference as Appendix A. The site plan and locations of the 04/21/2025 soils excavations are shown on the attached plot plan. 2.0 Develooment of D,esien Parameters - The perc excavation trenches were extended to a depth of 72" below ground surface (BGS). There was no euidence of ground water in the open excavation to a depth of 72" BGS. The higlr seasonal water table, at the time of inspection, was estimated at 60" BGS. The soils evaluation indicates two distinct soil horizons underlie the site. A lithological description follows: depth (in.) description 0" - 48" sand, gray (USDA - sand, single grained, structureless, Soil Type -1) 48u -72" minor gravel in gray sand matrix, (USDA - satrd, single grained, structureless, SoilType -l) As based on the results frorn the 09/01123 site investigation (Appendix A), a design perc rate of 15 rnin/in. and corresponding long tenn acceptance rate (LTAR) of 0.80 are chosen for overall system sizing for a pressurized infiltrator trench absorption field designed to discharge to subsoils below the24" depth. 2 3.0 Systgrn Design A pressurized INFILTRAZOR absorption trench soil treatment area (STA) is proposed for disc6arge of septic effluent at the site. constructiorr of tlre systern will consi$t ofexoavating fevel trenches in the area cornprising-the absorption field. Each trench excavation shall be continued toi deptli of ?4,, BGS (see absorption field cross-section). After removal of sr"rrface soils, the open excavatioris will be disked or scarified to promote subsurface absorptiorr. A tift station clischaqging into pressurized effluent distribution laterals will be employed to discharge septic effluentlnt6 the absorption field. Following completion ofthe initial excavation,INFILTRAT)RS (QUlcK4 STANDARD or equivalent)will be used to construct a septic effluent distribution system. The INFILTRAZOR effluent disiribution system will be installed in accordance with the "lnfiltrator Technical Mannal", available frorn Infiltrator S.vstels Inc.,I23 Elm Street, Suite 12, Old Saybrook, Connecticut 06475. Adjacont INFILTMTORS slrall be fastened with a minimum of four (4) 314" x #8 self-tapping sheet rnetai or bright brass deck screws to prevent movement and separation during backfilling. After the INFILTMTORS are installed, synthetic filter fabric (140-200 mesh) will be placed over the INFILTRATORS and the system will be covered with a soil cap. The soil cap will consist of approxirnately 12" of sandy loarn soil tnounded 5olo to prornote surface run off away fronr the absorption field^ Septic effluent will be introduced into the INFILTRATORabsorption field throurgh pressurizecl distribution laterals installed in each row of INFILTRATORS u, ,ho*n in the attiched graphics. The injection laterals will consist of I " Schd 40 PVC pipe with 3/16" (0.1 872s") holes eq'a-lly spaced 4g,, o.c. along each row of /I/F'IITMTORS. Holes in the injection laterals will be clrilled at iZ:00 o'clock to direct effluent up for dispersal against tlre top of the charnber. Injection laterals shall be suspe'ded fi.om the top of the chamber.with all-weather plastic pipe strapping (min. 120 lbs tensile strength) at every charnber joint connectiofl. Septic effluent will be delivered to the distribution laterals thio'gh a 2" (Schd 40 PVC) pressure rnalifold. Tlre pressure rnanifold will be centrally located in the absorption field iseeattached absorption field plan view). A 2,000 galton, two compartment septic tank witl be used to accept sewage from the proposed 3 bedroom residence and two RV parking spaces. Alternatively, a single compaftrneit 1,000 galion'septic tank may be placed in series artd ahead off a second 1,000 gallon, tw6 compafturent septic tant. e screened effluent purnp will be placed in the final down-gradient cornpartrnent of the septic tank. Tlre efflr-rentpump system will employ an OSI high head, non-clog (3/4" solids handling capability), effluelt pump(oSI model no, PF5005l l) and screened pumping vauit (oSI modelno. pVujz-1sli-L). The site is located in the 100 year flood zone A for which no base flood elevation (BFE) levels have beenestablished' Linear interpolation of BFEs from the adjacent 100 year flood zone AE inciicate a BFE in theimrnediate vicinity of the proposed construction is 5,432'. To prevent intrusion of flood waters into theOWTS, all septic tank risers and cleanouts willbe of,water-tight construction. If possible septic tank/pump chamber access manholes will be constructed to a lieiglrt of 1' above ttte BFE for the site(5,432'+I':5,433')- All backfill associated with the OWTS will be constructed to prevent erosion andentry of flood waters into components ofthe OWTS. Finally, the OWTS will be constrLrcted to optimize the passage of floodwaters and prevent damning and retention of floodwater flows. A 2" Schd 40 PVC pressure transport line will be used to transfer septic effluent frorn the pumping system to the absorption field. The pressure main will be self-drailing or be blried a minirnum oi36" -1 below ground surface to prevent freezing. All pressure piping and soiI treatment area construction shall be completed in accordance with the attached graphics. The installer must also confirm the setbacks from propetty lines, building envelopes, and existing easements slrown in the attached graphics are maintained. Four inch clean outs shall be provided at maximum 100'intervals in all gravity flow efflr"rent lirres exceeding 100' in length. Vehicle traffic and parking is to be prevented over the absorption and repair area. Provide minimum schedule 40 PVC under all traffic areas. Pressure lines under all traffic/paved areas shall be sleeved to facilitate replacement and maintenance. A minirnum of 12" (18" recommended) of soil cover is required for all gravity flow effluent piping, the septic tanks/lift station, and the absorption field (excepting septic tank/lift station access ports which must be extended to the ground surface). Effluent piping in traffic areas with less thart 36" of cover shall be encased in 6" CMP or flow fill and covered with minirnuln 2" high density blue board insulation. All non-draining pressure effluent piping must be covered with a minimum of 36" of cover to prevent freezing. Sewer lines shall be encased with SCHD 40 PVC with water{ight endcaps at all points within 5' of all domestic water lines. All OWTS components in traffic areas shall consist of structural cornponents (i.e., concrcte tanks, structuml manltoles, and Schd 40 piping) capable of supporting anticipated loads. Finally, any unknown utility lines, easements, or other adverse conditions disclosed during construction must maintain the required setbacks listed on page 6 of this document. As discussed above, a two-piece,2,0A0 gallon, two comparfinent septic tank or two 1,000 gallon septic tanks placed in series will be used to receive sewage from the proposed three bedroom residence and two RV parking spaces. The last chamber in the septic tank/tanks shall serve as a pumping chamber for the pressurized soil treatment area. A screened effluent purnp will be installed in the final down-gradient compartment of the septic tank/tanks and will be used to deliver septage effluent frorn the septic tank/tanks to the soil treatment area. The septic tank/tanks will provide in excess of 48 hor.rrs retention time in addition to the displaced purnp chamber volume for sewage generated frorn the proposed use. As discussed above, an INFILTMIOR absorption trench is proposed to discharge septic effluent to the r"urderlying sub-soils. As shown in the attached graphics, the absorption trench will consist of two (2) trenches 3'wide x 24" deep x 76' long with nineteen (19) STANDARD INFILTRATOR (or equivalent) units each for a total of thirty eight (38) units. The absorption field will encompass an at'ea of 456 sq. ft. (effective area of 814.29 sq. ft.). Calculatiorrs and parameters used to size tl-re absorption field follow. 4 DESIGN CALCUI,ATIONS DESIGN LOADING RATE OF 3 BEDROOMS AT 150 GAL./BEDROOM-DAY + 2 RV HOOKUPLOCATIONS @ 100 GAL./HOOKUP-DAY: (3x150) + (2x100) = 650 cAL./DAy DESIGN PERCOLATION RATE: l5 MIN./INCH DESIGN LONG TERM ACCEPTANCE RATE (LTAR) = 0.80 cAL./DAy_Se. rT. a LTAR}A=WHERE, A = ABSORPTION FIELD AREA (Se. FT.) Q= DESIGN FLOW (cAL./DAy) LTAR: LONG TERM ACCEPTANCE RATE (cAL./DAy-Se. FT.) A: o*gq = 812'50 ABSORPTION FIELD AREA ADruSTMENT FACTOR FOR PRESSURE TRENCH DESIGN :0.8 ABSORPTION FIELD AREA ADruSTMENT FACTOR FOR USE OF CHAMBERS : 0.7 ADJUSTED ABSORPTION FIELD AREA:812.50 x 0.8 x 0.7 :45s se. FT. USE 38 QUICI(4 STANDARD INFILTRATORS AS 2 TRENCH OF 19 UNITS EACH ABSORPTION FIELD ADDITION SIZED AT 2 TRENCH 3 FT. x 76 FT :456 se. FT. 5 4.0 Site Specifi,c Instal lation/Operation Requirements The owner and system contractor shall be aware and comply with the following installation and system operation requirements. 4.1 Installation - Setbacks. Notifications. and Inspectioqg The systern contractor must be approved and licensed by the Mesa County for installation of onsite wastewater treatment systems. All installatiorl activities sball be conducted in accordance with cr.rrrent Mesa County OIIILS Regzlaliozs. If at any time durring construction. subsurface sitl?.cbnditions are gncountered which differ fi'om the design parameters developed in Section 2.0. cglnqtruction activities will stop and the design engineer and Mesa County will be contacted to address any necessar),, design modifications. Installation procedures including grade, location, setbacks, septic tank size, and absorption field size shall confonn with the attached graphic details. Construction activities and system components will not encroach upon existing easements or utility corridors. A minimum of 4 ft of undisturbed soil shallbe maintained between individual absorption elements and the septic tank and/or adjacent absorption elements. Minimum site specific setbacks for system cornponents ale: a a a a a Source domestic water line domestic well domestic water cistern property lines dry gulch subsurface drain stl'ucture w/o crawl space structure w/crawl space irigation ditch open intermittent irrigation gated solid pipe/lined Septic Tank 10' 50' 50' l0' l0' l0' 5' 5' 50' 10' 10' t0' 50' 2s', 25' l0' Absorption Field 25' I 00' I 00' 10' 2s', 25' l0' 20' Buildine Sewer 5' To avoid surface flow infiltration and saturation of the new absorptiou systern, abandonmerrt of irrigation in the vicinity of the disposal system is required. Diversion ditches necessary to divert surface flows around the new absorption bed rnust maintain the minimum setbacks listed above. All gravity flow sewer lines and effluent distribution piping shall be 4 inches in diarneter and have glued joints. All lines dischargirrg sewage from the residence to the septic tank shall maintain fall of between 1/8 in. and 1/4 in. per foot and shall employ sweep 90's or 2-45's at all turns. Sewer lines fiom the dwelling to the septic tank and at least 6 ft. frorn the septic tank outlet rnust meet minimum standard ASTM-3034. Sewer lines under driveways shall always meet minimurn Schedr"rle 40 PVC standards. Additionally, effluent piping in traffic areas with less than 24" of cover shall be encased in 6" CMP or flow fill and covered with 6 a a minimum 2" high density blue board insulation. A nrinimum of 72" of soil cover (18" recomlleuded) shall be lnaintained over all gravity draining ISDS cornponents to prevent freezing of septic effluent (excepting septic tank/lift station access ports which must be extended to the ground surface). Four in. sanitary clean- outs shall be installed at maximum 100' intervals in all gravity flow effluent lines exceeding 100' in length. The installer sliall not place the lnfiltrators in tlre open excavation until inspected and approved by the design engineer, Additionally, the final cover shall not be placed on sewer lines, septic tank, or the soil treatnlent area until the systern has been inspected and approved by the design engineer and Mesa County. The installer shall provide 48 hour notice for all required inspectious. The efflr.rent distribution system shall be constructed in accordance with the "Infiltrator Teclrnical Manual" available from lnfiltrator Systems lnc., 723 Elm Street, Suite 12, OId Saybrook, Connecticut 0647 5. Pressure piping shall consistof a2 in. pressure main,2 in. rnanifold, and 1 in. laterals. All pressure piping shall be rnin. Schd 40 PVC arrd have glued joints. The septic effluent pumping system shall consist of OSI components (OSI, non-c log (314- solids handling capability) effluent purnp model no. PF5005l I and OSI screened pumping vault rnodel no. PVU57-1819-L) as detailed in tlre attached effluent purnping system detail. The effluent punrp control panel shall be Orenco model no. S I ETM. Electriial wiring shall be continuous cable with all connections made in a weatherproof box. Limit switchirlg shall consist ofi l) low level/purnp off,2) high level/purnp on, and 3) Irigh level alarm/system failure. The high level alarm shall be both audible and visual and shall be easily detectable by occupants. Emergeucy notification infonnation (e.g., telephor-re rrumbers of owner, Mesa County, service persorrnel) shall be posted near the high level alarm. The effluent pump shall be configured with a minimum dose voh.une of 100 gal. (2.5,,float differential two compaftment,2,000 gal. tank). Storage capacity in excess of the high-level alann shall be 6" above the purnp-on float level. All access manholes on septic tanks and dosirrg chambers will be child proof and contain appropriate warning labels if accessible to the public. Confined space entry precautions should be observed by maintenance personnel. Tlre surface cap shallbe mourrded 5%o overtlre absorptiorr field to promote surface rLrnoff. The system contractor shall be aware of the potentiat for construction activities to redgce soil permeabilities at the site through compaction, srnearing, and shearing. The following precautiotls and construction procedures should be ernployed during installation to minimize distr"rrbance to native soils: ' i. Excavation shor.rld proceed only when the moistule content of the soil is below the plastic limit. lf a sample of soil forms a rope instead of crumbling when rolled between the harrds it is too wet and slrould be allowed to dry before 7 a a a a a a a ll excavation continues. Excavation arrd backfill equipment should work from the surface where at all practical to avoid compaction of the soils at depth. The bottom and sidewalls of the excavation should be left with a rough, open surface. The appearance should be that of broken or ripped soil as opposed to a sheared, smeared, or troweled surface. Any smoothed or smeared surfaces should be removed with a toothed rake or shallow ripper taking care to remove loose residues from the bottom of the excavation by hand if necessary. Care should be taken in placing fill materials in the excavation to avoid damagirrg the exposed soil surfaces. ilt. 4.2 Operation - Maintenance and Inspections The owner shall install a structural barrier if necessary and take precautions to prevent vehicular traffic, excessive surface watering, accidental floodirrg, or other activities in the vicinity of the absorption field which may compact, saturate, or otherwise alter the subsurface soil parameters used in designing the septic system. The owner will plant and maintain grass or other shallow rooted cover crop to prevent erosion and promote evapotranspiration over the absorption field. The owner will inspect and maintain the required mounding and drainage away frorn the absorption field to prevent saturation frorn precipitation and surface flows. To rnitigate the generation of preferential flow channels wlrich may compromise the operation of the system, the owner will inspect and prevent intrusion of burrowing animals and deep rooted plants into the absolption field. The septic effluent pump and the efflr.rent purnp filter shall be inspected and cleaned as necessary every six (6) months. The owner will condr"rct periodic maintenance of the septic system by rernoving accumulated sludge frorn the septic tank every 3-4 years to prevent clogging of the absorption field. a a a a a a 8 5.0 Limitations This report is a site specific desigri for installation of an onsite wastewater treatment system and is applicable only for the client for whom our work was performed. Use of this report under other circumstances is not an appropriate application of this document. This report ig a product of Tom Cronk Engineering Incorporated and is to be taken in its entirety. Excerpts frorn this report rnay be taken out of context and may not convey the true intent of the report. It is the owner's and owner's agent's responsibility to read this report and become familiar with ttre rccommendatiols and design guidelines contained herein. The recommendations arrd design guidelines outlined in this report are based op: l) the proposed site development and plot plan as fumished to Torn Cronk Eugineering Incorporated by the client, and 2) the site conditions disclosed at the specific time of the site investigation of reference. Tom Cronk Engineering Incorporated assumes no liability for the accuracy or completeness of information furlished by the client. Site conditions are subject to external environmental effects and may change over time. Use of this plan under different site conditions is inappropriate. If it becomes apparent that current site conditions vary from those anticipated, the design engineer and Mesa County should be contacted to develop any required design modifications. Tom Cronk Engineering Incorporated is not respolsible and accepts no liability for any variation in assumed design parameters. Tom Cronk Engineering Incorporated represertts this report has been prepared withirr the lirlits prescribed by the owner and in accordance wittr the cun'ent accepted practice of ihe civil engiseering professio. i' the area. No warranty or representation either expressed or irnplied is included oi intenOed in tlris report or in any of our contracts, SEAL Tlromas A b Date NOTE: This individual sewage disposal plan is meant to inclutle the following six pages of graphics including: 1) plot plan,2) septic layout plan,3) absorption field plan view, 4) "n*oiption fieiA cioss sectionr 5) cross section - effluent pumping system, and 6) effluent pumping system design. The plan is not to be implemented in the absence of these related graphics. in "aiition, results from the percolation test and soils evaluation are included for reference as Appendix A. 9 Q,'re^ test excovotions N gl11.9 ocres Ioco I Porking ,'tions I { I rpsidence IAPA PRBJECT 354 CR 311, SILT zt79-104-DO-176)LET PLANqAY 7, 20e5 SCALE, 1'=200'NORTH exlsting gutbuitdlngs Colonodo p/ven penc test N 11,9 ocnes provlde cleqn outs qt r,lqx. 100'intervqts in otl effluent lines exceeding 100' ln tength o,o-o t,( drlve * of rows fletd consistingof 19 Quick4 J Stondqnd Infittrqtons (or equlvotent) for o totot of 38 units wlth pnessure distributlon os shown epoli oreo 2' SCHD 40 pnessunetronsport no,ln (see note oddresslng cover) oot+ $o $\o' ,!o rqin., l4' -gt {t -'l I I J 2000 gotton, two conportnent septic tank (or longer) w/[renco (PVU57-1819-L) scneened efftuent pur.tp(PF500511) in last comportnent, otternotvely, 1-1000 gotton slngte compontnent septlc tonk ptocedln senies qnd oheod oF q 1,000gotton, two conportnent septictonk w/Drenco (PVU57-1819-L) screened effluent punp(PF500511) in [qst compontnent provlde cteon outs qt nqx. 100'lntervots ln ot[ efftuent lines exceedlng 100' in tength eon out i NOTE PROVIDE I"IIN, lE' CEVER (I8' RECOMMENDED) OVER ALL GRAVITY DRAINING EFFLUEN'T LINES ANI) MIN 36' FROST PROTECTINN CI]VER OVER ALL NIN_DRAiNING PRESSURE LiNES, TYPICAL -k- L-- NOTE CALL 811 FOR UTiLITY LI]CATES NOTE THE FILLI]VING SE.TBACKS MUST BE MAINTAINEDI SEPTIC ASSORPTINN SPRINGS/VELLS -- 50, LAKE,/STREAM./IRRIG, DITCH INTERMITTENT IRRIG, DITCH-10' 100' 50' ?5', e5' l0' 100' a5' ?0' 10' 10' SDL]D PIPEILINE! DITCH NOMESTIC VATER CISTER DNMESTIC VATER LINE STRUCTIJRE V,/CRAVLSPACE - 5/ STRUCTURE VO,/CRAWLSPACE_ 5' 10' 10' GATED PIPE PROPERTY LINE TANK proposed 3 bedroon nesldence ) o.n out PAPA PROJECT 354 CR 311, SILT ?t79-104-00-t76 SEPT]C LAYNUT PLAN Y le, e0?5 SCALET 1'=40'Ni]RTH Ioco Pqrkingtions soll treotnent oreo (STA) consistingof 2 rows ol t9 OUICK4 STANDARDInfjltrotor units (or equivotent) foro totol of 38 units with pressure distnibution os shown 1' SCHI 40 PVC pressure lotenats wilh 3/16' hotes spaced 48. o,c,Dnltl holes ot 12100 o'clock to dinect dischonge up to disperse agoinst top of chonber ty bs 0, o U a,L €5 .E E o tvP' a' scHD 40 pnessure A, SCHD 40 tnonspont septic inftuent fnor.rlift stotion pnovide venting ond observo botoncing ports ot eoch end of iNFILTRAT0R bed os sho'an (see detoit on obsorption fietd cross section) ABSORPTION F]ELD - PLAN VIEW SCALE:1"=2O' PROJECT CR 3iI, SILT ?179-104-00-t76 ABSI]RPTIDN FIELD PLAN VIEV JUNE ?025 INFILTRATER (OUICK 4 STANDARD [REQUIVALENT), ]NSTALL IN ACCORDANCE VITH'INFILTRATOR TECHNICAL MANUAL, INFILTRATT]R SYSTEMS INC,, 1A3 ELM STREET, SU]TE 1A, OLD SAYBRT]I]K, CONNECTIqUT 06475 SYNTHETIC F]LTER FABRIC(140-a00 MESH) 0vER ]NFILTRATNRS, TYP. 1' SCHD 40 pressyie lqterqls with 3/16' hotesspocdd 48' o,c, ot 12100o'ctock to dlrect dlschonge uP fon dlsperslon ogolnst-top of chonben ('typ. 1 of l0) PREVIDE VENTIN6/INSPECTIEN PORTS AT EACH END AS SHNVN PROVIDE SANDY LOAM SOIL CAP (MOUND 5Z), TYPICAL EXISTING GROUND SURFACE -4A' -lc SO]LS LOG(SEE NOTES) A PROJECT CR 31I, SILT 79-104-00-176 FIELD - CROSS SECTINN 14, 2025 CALEI AS SHO!/N 4' SCHD 40 PVC VENT,/INSPECTION PT]RT SOIL CAP 3/4' THREAD CAP 1? D]SK NR SCARIFY_ E' SCHD 40 PVC -PRESSURE MANIFOLD, INSTALLATINN DIMENSINNS TYPICAL EF ALL TRENCHES 4' MIN., <10'-I?' PREFERRED) J PRBV]DE MIN, 1/8' FALL PERIE' RUN FOR DRAIN BACK TDLIFT STATION FOR ALL LINESVITH LESS THAN 36' EF COVER, TYPICAL 2' SCHD 40 PVC PRESSURE TRANSPORT LINE FRDM LIFT STATION ABSORPTION FIELD - CRISS SECTION (TYPICAL A NF A) SCALET i'=10' SOILS LDG NI]TES *I - GRAY SAND<uSiin:"b-nNl, sTNGLE GRATNED, srRUcruRELEss, sgtl TypE_l)#e - .l4llLDR GRAVEL IN GRAY SAND MATRTX(USIA - SAND SINGLE 6RAINED, SiRUCTURELESS, SOIL TYPE-I) GRI]UNDVATER AND HI6H SEAONAL VATER TABLE AT 60' BELOV GROUNDSURFACE (B65) PRESSURE LATERAL CONSTRUCTION DETAIL SCALE:1"=1' #1 fle ELEVATIBN DESIGN SPEC]FICATII]NS DESiGN ST ANCE FRBM FDUNDA TINN LINE TD SEPTIC T ANK 165' D ESIGN D]ST ANCE FRI M SEPT IC T ANK TO SE]L ACE AT TREA TMEN T AR EA 40'A SSUMED ELEVA T ION uF GRDUND SURF ENT R Y TO SO L TREA TMENT AREA 1 00.00'ELEV A T]DN OF INF IL TRA TIV E SL]RF ACE uF SgIL T REA TMENT AREA 98,00'ASSUMED INVERT ELE TION OF SEV AGE LI NE A T TXI T FR[M FDUNDATION LINE 9 9.00'INVERT E LEV A T ON OF EV AGE L I NE AT EN TRY TO SEPTIC T ANK 93,00' PRESSURE MAIN, TYP,3,/4' THREAD TEE [R 90' EL SUSPEND PRESSURE LATERALVITH ALL VEATHER PLASTIC PIPE STRAP VITH lEO LBS TENSILE STRENGTH AT EVERY CHAMBER CINNECTION, TYP. E' SCHD 40 PVC PRESSURE LATERAL VITH 5/32' HI]LES SPACED 48' N.C. DRILL HOLESAT 1A'OO [],CLOCK TO DIRECT NISCHARGE UP Ft]R DISPERSAL AGAINST TOP OF INFILTRATNR IUT AND PRESSURE BALANC]NG(END I]F LATERAL ONLY) 3/4' THREAD NIPPLE TE SURFACE FBR CLEAN PRDVIDE MIN, 1/8'FALL PER12' RUN FOR DRAIN BACK TE I Effluent Pumping System - 2nd Compartment Drawdown Effluent Pumping System for Cold Weather Applications (cw style) G/A\--z)ffi ffiffi Conduit Secl Slope Ground Awoy from Riser PVC Splice Box with Cord Grips lnsuloted Gosketed Lid Stoinless Steel Bolts Orenco Systems@ lncorporated 814 AIRWAY AVENUE SUTHERLIN, OREGON 97479-9012 TELEPHONE: (s4r) 459-4449 FACSIMILE: (s4r) 459-2884 EDW-TD_1 B lnspection Access Riser ond L;d (ot ground surfoce) Tonk (cost Ado or Dischoroe Assemblv (tvtinimuin 2") PVC Riser with Grommets (bond to tonk odopter wiih recommended odhesive) * Peo Grovel Bockfill Provide 1/4" Droin Hole Effluent Dischorqe (2" SchC +0) Below Frost Lind Tonk Adopter (cosi or bolted) Level Control Floot Assembly I nd ucer Check Volvelntet Potents # 4,+39,J23 & 5,492,635 Foreign Potents Pending @ 199.7, Orenco Systems, lnc. n Pori Peo Grovel Bockfill Recommended to Help Prevent Frosi Heovet Voult Inlet Ports Filter Cortridge 0Sl Effluent Pump (uooer rrsoost r) EIE Conduit to .g Control Ponel (voaet stnu) APA PRIJECT4 CR 311, SILT ?179-r04-00-176 PUMP VAULT DITAIL JUNE i4, 2025 high level olorm set to trigger mcx. 6"'obove pump-on floot l6vel pump-on/pump-off floot differentiol set to provide dose volume of 100 gollons (2.5" floot differentiol for 2,000 iot. tonk) ONE PIECE, TWO COMPARTMINT, 2,OOO GALLON SEPTIC TANK Liouid Level v Bioiube@ Pumo Voult (t',looet evusz-1 s1 9-L) Rev. 1.a (z/el) Pump Selection for a Pressurized System - Single Famity Residence Project PAPA PROJEQT / 354 CR 311, SILT, CO Parameters Discharge Assembly Size Transport Length Transport Pipe Class Transport Line Size Distributing Valve Model Max Elevation Lift Manifold Length Manifold Pipe Class Manifold Pipe Size Number of Laterals per Cell Lateral Length Lateral Pipe Class Lateral Pipe Size Orifice Size OriliOe Spacing Residual Head Flow Meter 'Add-on' Friction Losses Calculations 2.00 35 40 2.00 None 10 11 40 2.00 4 38 40 1.00 3/1 6 4 5 None 0 feet feet inches teet inches inches fbet inches inches feet feet inches feet 160 140 120 100 80 60 Minimum Flow Rate per Orifice 0.97 Number of Orifices per Zone 40 Total Flow Rate perZone 39.7 Number of Laterals per Zone 4 % Flow Differential lsuLast Orifice 6.2 TransportVelocity 3.8 Frictional Head Losses c,(, IL IoF (!o ! .9 Eoc o E oF 40 gpm gpm o/o fps 0 feet feet feet feet feet feet feet Logs through Discharge Loss in Transport Loss through Valve Loss in Manifold Loss in Laterals Loss through Flowmeter 'Add-on' Friction Losses Pipe Volumes 3.1 0.9 0.0 0.1 0.9 0.0 0.0 20 PumpData 01020 30 40 50 Net Discharge (gpm) 60 70 B0 Vol ofTransport Line Vol of Manifold Vol of Laterals per Zone Total Volume 6.1 1.9 6.8 14.8 gals gals gals gals Minimum Pump Requirements PF5005 High Head Effluent Pump 50 GPM, 1/2HP 1151230V 10 00H2, 200/230V 30 6OHz PF5007 High Head Effluent Pump 50 GPM, 3/4HP r,ov 1A 6OHz, 200/230/460V 30 6OHz PF5010 High Head Effluent Pump 50 GPM, lHP 2gOV 1A 60H2,200/460V 3b60Hz PF5015 High Head Effluent Pump 50 GPM, 1-1l2HP 23oV 1A 60H2, 200V 3Z 60Hz Design Flow Rate Total Dynamic Head 39.7 '19.9 gpm feet $Y$'lEr-JS Elfr.{qElimr'fir.!(@[ System Curve: - Pump Curve:'**' Pump Optimal Range: - jt: Operating Point: * 0 Design Point: APPENDIX A SOILS AND PDRCOLATION REPORT TOM CRONK ENGINEERING INC. 10 TOM CRONI( ENGINEERING, lnc. 1737 -24- Road, Grand Junction, CO 81509 Grand Junction (970) 640-5029. Clenwood Springs/Aspen (970) 640-5029. Montrose/Delta (970) 640-5029 Email:@msn.com Date: Prepared by: Clierrt: Property address: Tax schedule No.: LegalDescript.: 1.0 Soils Evaluation SOILS AND PERCOLATION REPORT April2l,2025 Thomas A. Cronk, P.E. 1131 -24- Road Grand Junction, CO 81505 (970) 640-s029 John and Debbie Papa c/o Extreme Construction 970-640-9244 merv@extconstructi on.com 354 County Road 311, Silt, CO 81652 2179-104-00-176 The site consists of approxirnately 11.19 acres of cr.rltivated native soil. Drainage is approxirnately l% to the soutlr. A percolation test/soils evaluation was conducted on the property of reference on 0412112025 by Torn A. Cronk, registered professional engineer (R.P.E). The perc excavation trenoh was extended to a depth of 72" below ground surface (BGS). There was no evidence of ground water in the open excavation to a depth of '12" BGS. The high seasonal water table,at thetimeof inspection,wasestirnated at60'? BCs,Thesoilsevaluationindicatestwodistinctsoilhorizons underlie the site. A lithological description follows: depth (in.) description 0" - 48" sand, gray (USDA - sand, single grained, structureless, Soil Type -l) 48 - 72" minor gravel in gray sand matrix, (USDA - sand, single grained, structureless, Soil Type -1) Percboles were constrr"rcted at tlre surface and at depths of approxirnately 30 in, and 42 in. The lioles 11 2.0 Limitations This document is representative of the site conditions clisclosed at the specific tirne of the site investigation' Site conditions are subject to change from external evepis both manmade (irrigation or water featurc construction) and naturally occun'ing (flooding or excessive prccipitatio'). Tom Cronk Engineering lnc. is not responsible and accepts no liability for any future variation in site conditio's. Tom Crorrk Engineering Inc. represents this repoft has been prepared withil the limits prescribed by the owner and in accordance with the current accepted practice of the civil engineering profession in the area. No wamanty or representation either expressed or imptied is included or ilitended i-n'this report or in anyofour contracts. appeared to be well saturated at the time of the test. Results of the percolation test are shown in Table I TABLE 1 Percolation Test Results 354CR3rr Depth v2025 Time Drop Perc Rate min/hr l4:00 l4:30 0" - 12"7.125 9.t25 30t2.0 l5 30 -42"5.5 7.5 30t2.0 15 42" - 54"25 5.5 drv 30t3.0 IO SEAL Cronk, P.E. Date a 12