BLRE-02-25-9098
JAMES AND KELLY LORD
NEW SINGLE-FAMILY RESIDENCE W/ ATTACHED GARAGE
3257 COUNTY ROAD 237, SILT
PARCEL #212724200392
THE APPROVED PLANS ARE TO BE ON-SITE FOR INSPECTIONS
SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS
A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE
IS TO PERMIT AND APPROVE THE ELECTRICAL WORK.
HTTPS :/AAAM/V. COLORADO. GOV/PAC I Fl C/DORA/DPO ELECTR I CAL PLU M BI NG PER
MITS
ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD
tNSPECT|ONS PERFORMED By THE STATE ELECTRICAL INSPECTOR, (303) 869-
3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE
WRITTEN DOCUMENTATION OF THE INSPECTIONS.
UNDERGROUND UTILITY LOCATES IS THE RESPONSIBILITY OF THE OWNER OR
CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE.
DRAINAGE ACROSS PROPERTY LINES SHALL NOT EXCEED THAT WHICH EXISTED
PRIOR TO GRADING. EXCESS OR CONCENTRATED DRAINAGE SHALL BE
CONTAINED ON SITE OR DIRECTED TO AN APPROVED DRAINAGE FACILITY.
EROSION OF THE GROUND IN THE AREA OF DISCHARGE SHALL BE PREVENTED BY
INSTALLATION OF NON-EROSIVE DOWN DRAINS OR OTHER DEVICES.
SMOKE DETECTOR LOCATIONS, CO DETECTOR LOCATIONS, HANDRAIL, SAFETY
GLAZING LOCATIONS AND BATH EXHAUST FANS ARE TYPICAL RED-LINES ON
RESIDENTIAL PLANS.
GEOTECHNICAL ENGINEER'S REPRESENTATIVE TO OBSERVE THE EXCAVATION
AND PROVIDE A REPORT VERIFYING THE ASSUMED sOOOPSF IS BEING MET PRIOR
TO A FOOTING INSPECTION TO BE PERFORMED.
A BLOWER DOOR TEST AND POSSIBLY A DUCT BLASTING TEST REPORT IS
REQUIRED PRIOR TO FINAL INSPECTION. IT IS YOUR RESPONSIBILITY TO SET UP
THE APPROPRIATE INSPECTIONS WITH A RATER AND SUPPLY THE INSPECTOR
WITH THE REPORT.
ANY EXPOSED FOAM IS TO BE COVERED WTH AN IGNITION BARRIER OR A
THERMAL BARRIER BASED ON LOCATION. (lRC R316)
THE HOME IS TO BE SUPPLIED WITH MECHANICAL VENTILATION OF OUTDOOR AIR.
THE MINIMUM VENTILATION RATE lS TO BE CFM = (0 OlXTOTAL SQUARE FOOTAGE
OF THE HOUSE) + 7.5 X (NUMBER OF BEDROOMS +1)
IF THE SLAB ON GRADE IS HEATED, A MINIMUM OF R-5 INSULATION IS REQUIRED
UNDER THE SLAB.
CODE MINIMUM STATES THAT ALL HOT WATER PIPES %'AND LARGER ARE
REQUIRED TO BE INSULATED TO R-3 MINIMUM AND ALL HYDRONIC HEATING PIPES
ARE REQUIRED TO BE INSULATED TO R-3
ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED
THE LOCATION OF THE CLOTHES DRYER COULD RESULT IN THE EXHAUST DUCT
BEING OVER THE ALLOWED 25" THEN SUBTRACTING FOR OFFSETS. THE CODE
REQUIRES THE DEVELOPED LENGTH TO BE PERMANENTLY MARKED. IF THE
DEVELOPED LENGTH IS OVER CODE, THEN THE INSTALLATION INSTRUCTIONS
FOR THE SPECIFIC DRYER IS TO BE ON-SITE DURING THE ROUGH-IN INSPECTION
THE ICE SHIELD IS TO BE INSTALLED AT THE EAVES TO A MINIMUM 24" UP FROM
THE INSULATED WALLS.
TYPICAL GARAGE FIRE SEPARATION IS 5/8" GYPSUM ON THE CEILING AND %" ON
THE WALLS. THE DOOR FROM THE GARAGE TO THE HOME IS TO BE 1 3/8'SOLID
CORE OR 20 MINUTE RATED. IF THERE'S LIVING SPACE ABOVE THE GARAGE, THE
SCREW PATTERN ON THE CEILING IS TO BE 6'OC ON THE EDGES AND IN THE
FIELD.
FLOOR DRAINS IN GARAGES ARE NOT ALLOWED TO BE TIED TO SEWER/SEPTIC
UNLESS ROUTED THRU A SAND/OIL SEPARATOR. OTHERWISE, DAYLIGHT THE
DRAIN OR RUN TO A DRYWELL.
KITCHEN HOODS OVER 4OO CFM REQUIRE MAKE-UP AIR. THE STOVE/OVEN
MANUFACTURER SPECIFIES THE CFM REQUIRED.
ENGINEER STAMPED TRUSS DRAWINGS FOR THE FLOOR AND ROOF ARE
REQUIRED TO BE PROVIDED TO THE INSPECTOR AT FRAMING INSPECTION
THE MECHANICAL EQUIPMENT IS SHOWN IN THE GARAGE. ANY SOURCE OF
IGNITION IS TO BE ELEVATED 18'ABOVE THE GARAGE FLOOR AND APPROVED
BARRTERS ARE REQUTRED TO PROTECT EQUIPMENT FROM VEHICLE IMPACT. (lRC
M1307.3 AND M1307.3.1)
ANY WOOD BURNING DEVISE IS TO BE AN EPA PHASE 2 CLEAN BURNING
APPLIANCE OR ON THE STATE LIST OF EXEMPT APPLIANCES. EXCEPTION: THE
RIVER VALLEY RANCH PUD DOES NOT ALLOW WOOD BURNING DEVISES.
IF THE WATER SUPPLY LINES ARE INSTALLED IN THE GARAGE CEILING, THE
PLUMBER IS TO INSTALL THEM AGAINST THE FLOOR SHEATHING OR PROVIDE AN
ACCEPTABLE METHOD TO KEEP THE LINES FROM FREEZING.
ALL SHOWER DOORS ARE REQUIRED TO MAINTAIN 22" IN THE CLEAR AND ARE
REQUIRED TO SWING OUT.
3RD PARTY SPECIAL INSPECTIONS ARE REQUIRED FOR BOLTING AND WELDING,
LIST OF SPECIAL INSPECTORS IS ATTACHED..
WINDOW OPENINGS THAT ARE OVER 72'ABOVE GRADE AND ARE LESS THAN 24'
ABOVE THE FINISHED FLOOR WILL BE REQUIRED TO HAVE WINDOW OPENING
LIMITING DEVICE SO THE WINDOW CANNOT OPEN MORE THAN 4'.
NO STAIRS ARE SHOWN FROM THE GARAGE TO THE LIVINGSPACE, STAIRS WILL
BE REQUIRED TO COMPLY WTH IRC R311.7, SEE ATTACHED HANDOUT.