Loading...
HomeMy WebLinkAboutConditions of PermitcoNDrTro NS OF PERMIT BLRE-02-25-9098 JAMES AND KELLY LORD NEW SINGLE-FAMILY RESIDENCE W/ ATTACHED GARAGE 3257 COUNTY ROAD 237, SILT PARCEL #212724200392 THE APPROVED PLANS ARE TO BE ON-SITE FOR INSPECTIONS SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT AND APPROVE THE ELECTRICAL WORK. HTTPS :/AAAM/V. COLORADO. GOV/PAC I Fl C/DORA/DPO ELECTR I CAL PLU M BI NG PER MITS ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD tNSPECT|ONS PERFORMED By THE STATE ELECTRICAL INSPECTOR, (303) 869- 3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTIONS. UNDERGROUND UTILITY LOCATES IS THE RESPONSIBILITY OF THE OWNER OR CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE. DRAINAGE ACROSS PROPERTY LINES SHALL NOT EXCEED THAT WHICH EXISTED PRIOR TO GRADING. EXCESS OR CONCENTRATED DRAINAGE SHALL BE CONTAINED ON SITE OR DIRECTED TO AN APPROVED DRAINAGE FACILITY. EROSION OF THE GROUND IN THE AREA OF DISCHARGE SHALL BE PREVENTED BY INSTALLATION OF NON-EROSIVE DOWN DRAINS OR OTHER DEVICES. SMOKE DETECTOR LOCATIONS, CO DETECTOR LOCATIONS, HANDRAIL, SAFETY GLAZING LOCATIONS AND BATH EXHAUST FANS ARE TYPICAL RED-LINES ON RESIDENTIAL PLANS. GEOTECHNICAL ENGINEER'S REPRESENTATIVE TO OBSERVE THE EXCAVATION AND PROVIDE A REPORT VERIFYING THE ASSUMED sOOOPSF IS BEING MET PRIOR TO A FOOTING INSPECTION TO BE PERFORMED. A BLOWER DOOR TEST AND POSSIBLY A DUCT BLASTING TEST REPORT IS REQUIRED PRIOR TO FINAL INSPECTION. IT IS YOUR RESPONSIBILITY TO SET UP THE APPROPRIATE INSPECTIONS WITH A RATER AND SUPPLY THE INSPECTOR WITH THE REPORT. ANY EXPOSED FOAM IS TO BE COVERED WTH AN IGNITION BARRIER OR A THERMAL BARRIER BASED ON LOCATION. (lRC R316) THE HOME IS TO BE SUPPLIED WITH MECHANICAL VENTILATION OF OUTDOOR AIR. THE MINIMUM VENTILATION RATE lS TO BE CFM = (0 OlXTOTAL SQUARE FOOTAGE OF THE HOUSE) + 7.5 X (NUMBER OF BEDROOMS +1) IF THE SLAB ON GRADE IS HEATED, A MINIMUM OF R-5 INSULATION IS REQUIRED UNDER THE SLAB. CODE MINIMUM STATES THAT ALL HOT WATER PIPES %'AND LARGER ARE REQUIRED TO BE INSULATED TO R-3 MINIMUM AND ALL HYDRONIC HEATING PIPES ARE REQUIRED TO BE INSULATED TO R-3 ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED THE LOCATION OF THE CLOTHES DRYER COULD RESULT IN THE EXHAUST DUCT BEING OVER THE ALLOWED 25" THEN SUBTRACTING FOR OFFSETS. THE CODE REQUIRES THE DEVELOPED LENGTH TO BE PERMANENTLY MARKED. IF THE DEVELOPED LENGTH IS OVER CODE, THEN THE INSTALLATION INSTRUCTIONS FOR THE SPECIFIC DRYER IS TO BE ON-SITE DURING THE ROUGH-IN INSPECTION THE ICE SHIELD IS TO BE INSTALLED AT THE EAVES TO A MINIMUM 24" UP FROM THE INSULATED WALLS. TYPICAL GARAGE FIRE SEPARATION IS 5/8" GYPSUM ON THE CEILING AND %" ON THE WALLS. THE DOOR FROM THE GARAGE TO THE HOME IS TO BE 1 3/8'SOLID CORE OR 20 MINUTE RATED. IF THERE'S LIVING SPACE ABOVE THE GARAGE, THE SCREW PATTERN ON THE CEILING IS TO BE 6'OC ON THE EDGES AND IN THE FIELD. FLOOR DRAINS IN GARAGES ARE NOT ALLOWED TO BE TIED TO SEWER/SEPTIC UNLESS ROUTED THRU A SAND/OIL SEPARATOR. OTHERWISE, DAYLIGHT THE DRAIN OR RUN TO A DRYWELL. KITCHEN HOODS OVER 4OO CFM REQUIRE MAKE-UP AIR. THE STOVE/OVEN MANUFACTURER SPECIFIES THE CFM REQUIRED. ENGINEER STAMPED TRUSS DRAWINGS FOR THE FLOOR AND ROOF ARE REQUIRED TO BE PROVIDED TO THE INSPECTOR AT FRAMING INSPECTION THE MECHANICAL EQUIPMENT IS SHOWN IN THE GARAGE. ANY SOURCE OF IGNITION IS TO BE ELEVATED 18'ABOVE THE GARAGE FLOOR AND APPROVED BARRTERS ARE REQUTRED TO PROTECT EQUIPMENT FROM VEHICLE IMPACT. (lRC M1307.3 AND M1307.3.1) ANY WOOD BURNING DEVISE IS TO BE AN EPA PHASE 2 CLEAN BURNING APPLIANCE OR ON THE STATE LIST OF EXEMPT APPLIANCES. EXCEPTION: THE RIVER VALLEY RANCH PUD DOES NOT ALLOW WOOD BURNING DEVISES. IF THE WATER SUPPLY LINES ARE INSTALLED IN THE GARAGE CEILING, THE PLUMBER IS TO INSTALL THEM AGAINST THE FLOOR SHEATHING OR PROVIDE AN ACCEPTABLE METHOD TO KEEP THE LINES FROM FREEZING. ALL SHOWER DOORS ARE REQUIRED TO MAINTAIN 22" IN THE CLEAR AND ARE REQUIRED TO SWING OUT. 3RD PARTY SPECIAL INSPECTIONS ARE REQUIRED FOR BOLTING AND WELDING, LIST OF SPECIAL INSPECTORS IS ATTACHED.. WINDOW OPENINGS THAT ARE OVER 72'ABOVE GRADE AND ARE LESS THAN 24' ABOVE THE FINISHED FLOOR WILL BE REQUIRED TO HAVE WINDOW OPENING LIMITING DEVICE SO THE WINDOW CANNOT OPEN MORE THAN 4'. NO STAIRS ARE SHOWN FROM THE GARAGE TO THE LIVINGSPACE, STAIRS WILL BE REQUIRED TO COMPLY WTH IRC R311.7, SEE ATTACHED HANDOUT.