HomeMy WebLinkAboutCondtions of PermitCONDITIONS OF PERMIT
BLCO-10-24-8970
COKE OVEN 2 INC
3RD FLOOR ADDITION AND REMODEL 1ST LEVEL TO A-3
625 AIRPORT ROAD, GLENWOOD SPRINGS
TYPE VA CONSTRUCTION, ALL BEARING CONSTRUCTION TO
BE 1 HOUR RATED
1) THE APPROVED PLANS ARE TO BE ON-SITE FOR INSPECTIONS.
2) SANTTARY FACILITIES ARE REOUIRED TO BE PROVIDED FOR WORKERS.
3) A LIST OF REOUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE
IS TO PERMIT AND APPROVE THE ELECTRICAL WORK.
HTTPS ://WWW.COLORADO.G OV/PACI F I C/DORA/D PO ELECTRI CAL PLU M B I NG PE
RMITS
4) UNDERGROUND UTtLtry LOCATES tS THE RESPONSIBILITY OF THE OWNER OR
CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE.
5) DRAINAGE ACROSS PROPERTY LINES SHALL NOT EXCEED THAT WHICH EXISTED
PRIOR TO GRADING. EXCESS OR CONCENTRATED DRAINAGE SHALL BE
CONTAINED ON SITE OR DIRECTED TO AN APPROVED DRAINAGE FACILITY.
EROSION OF THE GROUND IN THE AREA OF DISCHARGE SHALL BE PREVENTED BY
INSTALLATION OF NON-EROSIVE DOWN DRAINS OR OTHER DEVICES.
6) SEPARATE SIGN PERMITS ARE REOUIRED FOR ANY EXTERNAL SIGNS. PLEASE
CONTACT THE COUNTY PLANNER FOR THE APPLICATION.
7) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD
INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458.
PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN
DOCUMENTATION OF THE INSPECTIONS.
8) ALL EXTERTOR LIGHTING lS TO BE DOWNCAST AND SHIELDED.
9) SAFEry GLAZING IS NOT DESIGNATED ON THE PLANS. SAFEry GLAZING WILL BE
CHECKED DURING THE FRAMING AND FINAL INSPECTION. (IBC 2406,4)
1O)ANY MEMBRANE AND THROUGH PENETRATIONS OF THE FIRE RESISTIVE
CONSTRUCTION WILL BE REOUIRED TO BE FIRE-STOPPED WITH LISTED FIRE
STOPPING ASSEMBLIES. THE CONTRACTOR IS TO PROVIDE A CUT SHEET FOR THE
ASSEMBLIES AT THE FRAMING INSPECTION. (lBC 713)
1 1)A KNOX BOX tS REOUTRED TO BE MOUNTED ADJACENT TO THE FRONT DOOR.
PLEASE CONTACT THE LOCAL FIRE DISTRICT FOR EXACT LOCATION.
12)THE WALLS SURROUNDING THE TOILET ARE TO BE NON-ABSORBENT FOR A
HEIGHT OF 48" AND 2' PAST ON EACH SIDE OF THE TOILET.
13)ALL ACCESSIBLE DOOR HARDWARE SHALL HAVE A SHAPE THAT IS EASY TO GRIP,
tNCLUDTNG POCKET AND SLIDING DOORS. (ANSI A117.1 - 404.2.6)
14)GRAB BAR BACKING IS TO BE IN PLACE FOR ALL TOILETS AT FRAMING
INSPECTION.
15)A PASS|NG BLOWER DOOR TEST rS REOUTRED TO BE SUBMITTED PRIOR TO
ISSUING THE CERTIFICATE OF OCCUPANCY FOR THE NEW 3RD LEVEL.
16)ANy EXPOSED FOAM tS TO BE COVERED WITH AN IGNTTTON BARRIER OR A
THERMAL BARRIER BASED ON LOCATION. (IRC R316)
17) RECORDS |ND|CATE THE BUTLD|NG tS SERVED BY A FIRE ALARM SYSTEM. lT lS
REQUIRED TO BE INSPECTED AND APPROVED BY THE LOCAL FIRE
PROTECTION DISTRICT. PLEASE PROVIDE SHOP DRAWINGS TO THE FIRE
DISTRICT FOR REVIEWAND SCHEDULE THE INSPECTIONS ACCORDINGLY.
PLEASE HAVE THE FIRE MARSHAL SIGN THE INSPECTION CARD WHEN THE
ROUGH INSPECTION IS APPROVED AND WHEN THE FINAL INSPECTION IS
APPROVED.
18)THE ELECTRTCAL CODE REQUTRES A SEPARATE ELECTRICAL PERMIT FOR LOW
VOLTAGE FIRE ALARMS THAT HAVE AN ALARM PANEL AND SEND A
NOTIFICATION TO THE FIRE DISTRICT WHEN UNDER ALARM. A ROUGH-IN
INSPECTION W|TH THE STATE ELECTRTCAL TNSPECTOR lS REQUIRED (303) 869-
3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE
WRITTEN DOCUMENTATION OF THE INSPECTION.
19)THE ROOF tS SHOWN AS VENTED THROUGH THE PARAPET, SEE DETAIL 1 ON
A5.1 AT FRAMING INSPECTION TO VERIFY COMPLIANCE.
20) PRTMARY SCUPPERS ARE NOT TO DRAIN OVER THE EXISTING STAIRS.
21) SHOP DRAWINGS FOR THE METAL STAIRS ARE TO BE REVIEWED AND
APPROVED.
22) PERMANENT ACCESS tS TO BE PROVTDED TO THE ROOF FOR THE SERVICE OF
THE MECHANICAL EQUIPMENT ON THE ROOF.
23)pER tBC TABLE 601 AND 602.4.3 THE POSTS SUPPORTING THE NEW ROOF ARE
ALLOWED TO BE 6X8 HEAVY TIMBER IN LIEU OF PROTECTING 6X6 POST.
24)THE NEW ROOF lS TO HAVE (2) LAYERS OF 5/8" TYPE X TO COMPLY WITH VA
CONSTRUCTION.
25)THE METAL COLUMNS SUPPORTING THE ROOF ON THE 3RD FLOOR ARE TO BE
PROTECTED WITH (2) LAYERS OF 5/8" TYPE X.