HomeMy WebLinkAboutEngineer's Foundation LetterHrcEK
\ffi
PO. Box23
Eagle,
co 81631
Direct
970-471-2121
vern@brockcivil.com
VIA email Ryan lvy <ryanivy6@gmail.com>
Date: April25, 2025
Ryan lvy
RWI, LLC
2579 County Road 115
Glenwood Springs, CO 81601
Referenoe Building Permit BLRE - 06 - 24-8761
Lot 32, Elk Springs, F6
Los Amigos Ranah PUD
Garfield County, GO
Dear Mr. lvy
Please review these recommendations to the Garfield County Building inspector's
request for clarification on the foundation steel inspection on April23,2025:
1) lt is acceptable to wet set the vertical J-bars in the footing during concrete
placement.
2) The step footers per site review can have a maximum span of 4 ft.
3 ) The grade beam spanning the footers reinforcement to be a single mat of #4
bars, minimum 24 inches on center each way per plan.
4) The footings are allowed to step according to site conditions.
lf there are any questions about this letter, or need site evaluation, please contact
me at 970-471-2121.
Regards,
Vern L. Brock, P.8., MS
Page | 2