Loading...
HomeMy WebLinkAboutRevegetation Plan,t Revegetation & Reclamation Plan Proiect: Lot 6 White Cloud Residence Jurisdiction: Garfield County, CO Prepared For: Major Grading Permit Application Disturbed Area: Estimated > 20,000 SF o 1. Soil Handling Procedures a. Topsoil Salvage and Storage: o Strip and stockpile on-site topsoil (typically top 6" to 8") before grading begins. Stockpiles will be located outside of drainage paths and within limits of disturbance, and stabilized with temporary seed and erosion control blanket if left for >90 days. Stockpile heights will not exceed 8 feet to minimize compaction b. Reapplication of Topsoil: After grading and final contouring, topsoil will be reapplied at a minimum of 4 inches depth across all non-hardscape disturbed areas. c. Erosion and Dust Gontrol: a During grading and prior to vegetation establishment, install silt fencing, check dams, and dust control (e.9., water trucks). a Reapply seed and mulch immediately following final grading to minimize wind/water erosron a N .\ti N a o 2. Noxious Weed Management Plan a. Site lnventory & Monitoring: ,. Before seeding, visually inspect the site for Gounty-listed noxious weeds (e.9., Canada thistle, yellow toadflax). a Mark and document infested zones on a site plan. b. Treatment Strategy: r Pre-treatment with spot herbicide application (by licensed applicator) prior to grading. o Post-reclamation, monitor the site semi-annually for 2 years. o Control re-emergent weeds with mowing, hand removal, or targeted herbicide treatment. c. Gompliance: r Weed control will follow Garfield Gounty Vegetation Management guidance and treatment logs will be kept on file for inspections. . 3. Planting Schedule & Species List a. Timing: r Seeding Window: Sping: March 15 - May 15 Fal/: September 1 - October 15 a b. Application Method: r Drill seed on slopes <3:1; hydroseed or broadcast seed on steeper areas. o Mulch with certified weed-free straw at 2 tons/acre. o Crimp mulch or tackifier will be used for wind-prone areas. o o Seeding shall occur within 14 days of final grading or topsoil application c. Seed Mix - Mountain Dryland Mix (per 1000 SF): Common Name Scientific Name Rate (lbs/acre) Western Wheatgrass Slender \A/heatgrass Blue Grama Mountain Brome Sheep Fescue Rocky Mountain Penstemon Lewis Flax Pascopyrum smithii 10 Elymus trachycaulus 6 Bouteloua gracilis 3 Bromus marginatus 5 Festuca ovina 4 Penstemon sfrbfus 1 Linum lewisii 1 I totalseeding rate = -30lbs/acre (Adjust based on supplier recommendation) t 4. Compliance & Final lnspection Site will be inspected for vegetative cover establishment (-70% ground coverage) after one full growing season. Financial security will remain in place untilthe Garfield Gounty Vegetation Manager certifies adequate revegetation. Records of seeding, mulch application, and weed treatment will be maintained for 2 years. a a a WC Lot 6 Revegitation Estimate Item i Topsoil Stripping & Reapplication Seedins (30- tb9/acp) Certified Straw Mulch Weed-Free Tackifier Weed Control- Herbicide Treatment Unit Gost: extenAeA Cosil Acre Lump Sum 20,000; 0.5 $0.30. $500.00 i $180.00 $150:00 $350.00 $6,000.00 $250.00 $180.00 $75 00: $350.001 4Mon Total Estimated Cost Visit:$100-00 $400. $7,255.00 14t't7t2025 ,, ,] I 1 :l l ;,1 i I t I 1 l t i: k I White Cloud Ridge Homeowners Association PO Box 2329 Basalt, CO 81621 david@lesterdevelopment. com April30,2025 Lester Development Attn: Tom Lester 500 Write Cloud Drive Carbondale, CO 81623 tom l@lesterdevelopment. com Subject: Approval of Construction plans for Lot 6 Dear Mr. Lester, on behalf of the \Mite cloud Ridge Homeowners Association (HoA), I am pleased to informyou that your submitted construction plans for Lot 6 (parcel lD: 23g1,2g41sd06) have beenreviewed and approved by the HOA Board of Directors. The proposed development, as detailed in your application dated [lnsert Application Date],aligns with the architectural guidelines and covenants established for the r,tnlit" cloud Ridgecommunity. Approved project Details : r Property Address: 500 white croud Drive, carbondare, co g1623 o Proiect Description: construction of a custom single-family residence with associatedsite improvements o Approval Date: April30, 2025 o conditions: All construction activities must comply with the HoA,s rules andregulations, as well as local building codes. Any significant modifications to the approvedplans must be submitted to the HoA for furtheireview and approvar. Please ensure that all contractors and subcontractors are informed of and adhere to thecommunity's guidelines throughout the construction process. we appreciate your commitment tomaintaining the standards and aesthetics of the wrriie cloud Ridge community. should you have any questions or require further assistance, ptease do not hesitate to contactus. $ r$ s \