Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Manual J
f wrightsoft Manual S Compliance Report Entire House Job: Dater Jun 16,2025 By: Rapid Creek M6chanical For: Design Conditions OutdoordesignDB: 95.3'F Ortdoordesign \ E: 59.0'F lndoor design DB: 75.0'F lndoor RH: 50o/o Design Conditions OutdoordesignDB: -2.0"F lndoor design DB: 70.0'F Luis Vargas, Unity Mountain Builders 318 Eagle Ridge Dr., Parachute, CO 81635 Sensible ga in: Latent gain: Total gain: Estimated airflow: 28778 0 28778 1200 Btu h Bfuh Bfuh cfm 77.TF 62.2F Entering coil DB: Entering coil WB: Manufacturer's Performance Data at Actual Design Conditions Equipment tlpe: Split AC Manufactureri RUNTRU Actual airflow: 1200 cfm Sensiblecapacity 25200 Btuh Latent capacjty 10800 Btuh Total capacity: 36000 Btuh Model: A4AC3036A1 + A4MXB4248AQ6+A951X080BD4SA 88% ofload 0% ofload 125o/oofload SHR: 70% Heat loss:62343 Btuh Entering coil DB: 66.?F Temp. rise:49 "F Manufacturer's Performance Data at Actual Design Conditions Equipment tlpe: Gas fumace Manufacturer: RUNTRU Model: p951X080BMS*-- Actual airflow: 1200 cfm OiFut capaclty 77O0O Btuh 124o/o otload Meets all requirements of ACCA Manual S. A iF :y.:'tf $:C*' Rig hrsuil@ u niu"r"ar 2023 23.0.01 Rsu62o85 .8\Oocum6nls\WdghtsoftHVAC\318Eagl6Ridgo.rup Calc=MJ8 FronlDoorfaces: S 2O25-Jun-16 12:58:27 Pag6 1 ect lnformationP Cooling Equipment Heating Equipment /4GCF\ Form RPER I l5 Mar 09 to !int"!i4rit.r,lA-": Contractori Mechanical license: Building plan #: Home address (Street or Lot#, Block, Subdivision): flesign Conditions Winter Oesion Conditions Outdoor tem-perature: lndoor temperaturel Total heet loss: Garfield county Header lnformation REOUIRED A TIACHMENIS Manual J1 Form (and supporting worksheets): or MJIAE Form* (and supporting worksheets): OEM performance data (heating, cooling, blower): l\,4anual D Friction Rate Worksheeti Duct distribution sketch: 3'18 Eagle Ridge Dr., Entire House Building C.onsiruction lnf-ormation "Ul*hE"", FrontDoorfaces south Nodh. Ess! Wset, Sollh. Nodhe.si Nodhw$t, souiho.st, souihwe6t Number of bedrooms: 4 Conditioned floor area: 1637 ft'z Number of occupants: 5 NoE NoE NoE NoE NoE ACHEDATT Yes EYes D Yes E Yes EYes E "F 70 Summer Desiqn Conditions Outdoor lempdrature: lndoor temperature: Grains difference: Sensible heat gain: Latent heat gain: Total heat gaini thating Equipment,Data Equipment type: Furnaco, Hoal pump, Sollor, o1c, l,rodel: Contrac,to/s printed name: Co ntrac,tods s i g natJ re: 62343 Btuh 95 'F 7s 'F 46 or/tb @s0% RH- 19692 Btuh O Btuh 28092 Btuh Gas turnace Windows Eave overhang depth: lnternal shade: Bllnds, drap$, €rc. Number of skylights: "1 b:fi,,0," ,- oft none 0 RUNTRU A95'tX080BD4S-* Heating oulpul capacity: 77000 Btuh H.al pumps - capacry atwhl€r doslgn ouldoor condnrons Aux- heating output capacity:O Btuh Design airtlow: 1 Euiprentdesign ESP Total device pressure losses: Available statlc piessure (ASP): H20 H20 H20 Longest supply duct: Longest return duct: Total effecliv o length (lEL): Frictlon rate: Cooliqg-EquipmenlData Equipment typel AL condlllonor, H.at pump, €tc, L4odel: Toial cooling capacity: Sensible cooling capacity: Latent cooling capacity: Blower Data Split AC Heating cfm: Coollng cfm: 1200 Static pressure: 't200 6 in H2ORUNTRU A44C3036A1 O Btuh O Btuh O Btuh 200 0 0 0 '*P cfm oin 0ln 0in ft ft ft Duct l\4aterials Used Trunk ducl: in/l00ft Branch duct:Sheet metal Date: f wrlghtroft Righfsuite@ unive.sal 2023 23.0 01 Rsu62085 Residential Plans Examiner Review Form for HVAC System Design (Loads, Equipment, Ducts) FIVAC LOAD CALCULATION (IRC M1 401 ,3) FIVAC EQUIPMENT SELECTION FIVAC DUCT DISTRIBUTION SYSTEM DESIGN (IRC M1601.1 ldeclaretheloadcalculalion.equipment,equrpmentselectionandductdesignwerertgorouslyperformedbasedonthebuildingp listed abore lLlnderstand the claims made on these forms will be sublectlo review and verification Reserved for Counly. Town Municipality or Authority havlng iurlsdiction use {+ wrlghtsofr Load Short Form Entire House Job: Date: Jun 16,2025 By: Rapid Creek Mechanical For: otrbide db ("D lnside db ('D Design TD ("F) Oailyrange lnside humidity (%) Moisture difference (gr/lb) Luis \brgas, Unity Mountain Builders 31 I Eagle Ridge Dr., Parachute, CO 81635 clg 95 75 20 H 50 46 tltg -2 7i 50 61 lnflltration Ivbthod Consfuclion quality Fireplaces Simplified Average 1 (Average) HEATING EQUIPMENT COOLING EQUIPMENT Make RUNTRUTrade RUNTRUCond A4AC3036AICoil A4MXB4248AC6+A951X080BD4SA AHRI ref 205012936Efficiency 12.0 EER, 14 SEERSensiblecooling 25200 Btuh Latent cooling 10800 Btuh Total cooling 36000 Btuh Actual airflow - 1200 cfmAirflowfactor 0.042 cfin/BfrrhStaticpressure 0 in H2O Load sensible heat ratio 1.00 Clg AVF (cfm) Make Trade Model AHRI ref RUNTRU RunTru A951X080BD4S*- 204606338 Efficiency Heating input Heating output Temperafure rise Actual air flow Air flow factor Static press ure Space thermostat ROOM NAME Mechanical Room Laundry Pantry Master Bath Master Closet Ivhster Bedroom Living Room Office Kitchen Hall Bedroom 2 Bathroom Bedroom 3 95 AFUE 80000 Btuh 77000 Btuh 70 "F 1200 cfm 0.020 cfn/Btuh0 in H2O 30 68 81 148 92 212 383 84 331 21 174 54 160 997 11 61 1248 3865 2190 9417 1Q741 3665 oErl 319 8545 1652 7814 't27 745 109 961 249 51 38 3850 1297 4306 28 5363 892 5374 20 24 76 43 185 211 72 187 6 168 32 153 5 31 5 4'l 10 217 162 55 182 1 226 227 Boldlhllc values heve boen menually oveildden Calculations approved byACCAto meet all requiremenb of lvhnual J 8th Ed. A tlt :rlrn-qt:*' *'g h"s, itd u niu","al 2023 23.0.01 RSU62085 ...8\Documenls\WdghtsoftHVAC\318EagleRidg€.rup Calc=MJ8 FrontDoorfac€s: S 2025-Jun-16 12:54:27 Page 1 Project lnformation n lnformation Clg load (Btuh) Htg AVF (ctm) Area (tr) Htg load (Biuh) 1837 61 136 1207 28438 uo 2886/. U 't200Enfre House Otherequip loads Equip. @ '1.00 RSM Latent cooling TOTALS 't200 1200 12001837623/.3 28864. BoHnblk veluea havo b@n manoalv ovatildalen Calculations approved byACCAb meetall requiremenb of lvhnual J 8ft Ed. ^&'tl* m::f,:f Rishtsutt$ u nivorsar 2023 23.o.ol Rsu62o8s ...8\DocumentB\Wdghlsoft HVAC\318 Eagl6 Ridg€.rup Calc = MJO Front Dotrfac6: S 202il&-16 12154.27 Pag6 2 lnfo + wrightsoft'ng Analysis House Job: oate: Jun 16,2025Byr Rapld Creek Mechanical Buildi Entire For: Location: Battlement Mesa,CO 4858 fiElevation: Latitude:40'N Outdoor: Drybulb ("F) Dailyrange ('R \ ,btbulb ("F) Wnd speed (m ph) / Luis Vargas, UnityMounbin Builders 318 Eagle Ridge Dr., Parachute, CO81635 cootjgs 35 59 7.5 Heatits H lndoor: lndoor temperature ("F) Design TD ("F) Relative humidity (o/o) Moisture difference (grllb) lnfiltration: lr/ehod Construclion quality Fireplaces Heatino70- 72 50 60.9 Sim plified Average 1 (Average) Coolino /5 20 50 46.1 15.0 Comnonenl Bh r hiflz Btu h % ofload Walls Glazing Doors Ceilings Floors lnfiltration Ducts Ventilation lnternal gains Blower Adjustrnents Total 0.7 43.0 6.2 1.1 0 u.o '1106 11919 425 1940 0 1053 8244 340 3750 0 0 28778 3.8 41.4 1.5 6.7 0 3.7 28.6 1.2 'l 3.0 100.0 eG Gdq- ffi Latent Cooling Load = 0 Btuh Overall U-\alu-e = 0.1 58 Btuh/ff-'F, Wndow / Floor Aea = 15.1 o/o Data enhies checked. aoldllallc valuB haye ban manuelly oveftldfun 4| :-".f l9h"E91l Ris hlsu its u niversar 2023 23.0.0i Rsu62085 . .8\Documents\Wightsof t HVAC\318 Eagle Ridge rup Calc = MJ8 Front Door f aces: S 2025-Jun-16 12:58:21 Paq6 1-*-,.ccA Cond Component Bfuhfi!Btuh % ofload Walls Glazing Doors Ceilings Floors lnfiltration DucG Piping Humidification Ventilation Adjustrnents Total 4.0 41.0 20.9 1.6 11 .2 5.2 5990 '11368 '1441 2910 20636 8424 1 0367 0 0 1207 0 62343 9.6 18.2 2.3 4.7 JJ. I 13.5 16.6 0 0 1.9 ,r00.0 {i} wrlghtsoft Component Gonstructions Entire House Job: Oate: Jun 16,2025 By: Rapid Creek Mechanical Location: Battlement For: Mesa,CO 4858 ft 40'N Elevation: Latitude: Luis Vargas, UnityMountain Builders 31 I Eagle Ridge Dr., Parachute, CO 81635 Heating Cooling-2 95 35 (H ) 59 7.5 lndoor: Heating Gooling lndoor temperature ('F) 70- 75 Design TD ('F) 72 20 Relative humidity (%) 50 50 Moisture ditference (gr/lb) 60.9 46.1 lnfiltration: Ivbhod Consf uc'tion quality Fireplaces Outdoor: Drybulb ("F) Dailyrange ("F) Vlbt bulb ('F) Wnd s peed (mph)15.0 Simplified Average 1 (Average) Construction descriptions Walls 12F-0sw: Frm wall, stucco ext, 1/2" wood shlh, r-2'l cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Area 200 395 373 313 1280 Partitlons'l2Cosw Windows 'l D-c2ovr 2 glazing, clr outr, air gas, vnl frm mat, ch innr, 1/4" gap, 1l4" thk: 6.67 ft head ht 0 Doors f iPor Door, mtl pur core type 0.290 0.290 0.290 Ceilinos Attic cemng. asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board 1837 0.022 int fnsh Floors Flr floor, trm flr, 1 2" thkns, hrd wd flr fnsh, tight cNl ovr, r- 1 5 wall insul U.value lnsul R lftg HTM i,-'FEld tuffi Loss Clg HTM GalnO. n e s all 220 30 120 277 n n s all Btuh 0.065 0.065 0.065 0.065 0.065 21.0 21.0 21.0 21.0 21.0 0.86 0.86 0.86 0.86 0.86 4.68 4.68 4.68 4.68 4.68 936 1846 1745 '1463 5990 173 341 322 270 1 106 673 561 2321 4110 4254 1 1919 0 00 0.570 0.570 0.570 0.570 0.570 0.570 41.0 41.0 41.0 41.0 41.0 41.0 22.4 22.4 64.5 34.3 64.5 43.0 0 0 0 0 0 0 1231 1026 't477 4925 2709 1 1368 n21 w48 all 69 10.5 10.5 10.5 20.9 20.9 434 1002 1441 4.00 7.11 6.16 84 341 425 1837 0.312 49.0 1.58 2910 '1.06 '1940 '15.0 11.2 20636 0 0 trccr {+ lgtgtt*tt911' Rishrs,ils uniu","at 2023 23.0.01 Rsu62085 ...8\Documents\WdghtsoftHVAC\318 Eagl€Radge.rup Calc =MJ8 FrontDoorfac€s: S 2O25-Jut\-1O 12.54.27 Paq6 I ect lnformationP Design Conditions a} wrishisoft Gomponent Constructions Mechanical Room Job: Dater Jun 16,2025By: Rapld Creek M€chanical For:Luis \hrgas, UniVMounhin Builders 31 8 Eagle Ridge Dr., Parachute, CO 81635 Desi n Conditions Location: Battlement Mesa,Co 4858 ft 40"N Elevation: Latitude: lndoor: lndoor temperature ('R Design TD ('F) Relative humidity (o/o) Moisture difference (grllb) lnfiltration: [/bbod Construclion quality Fireplaces Heatigs coolJgs 20 50 -46.1 72 50 60.9Outdoor: Drybulb ('F) Dailyrange ('F) \ bt bulb ('D Wnd speed (mph) Cooling OE 35 (H ) 59 Simplified Average 1 (Average) Hoating -2 15.0 Gonstruction descriptions Walls 12F-0sw: Frm wall, stucco ext, '1l2" wood shth, r-21 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions 12G0sw Windows (none) Doors (none) Ceilinos Attic ceiling, asphalt shingles roof mat, r-49 ceil ins. 5/8" gypsum board int fnsh Floors Flr floor, lrm flr, 12" thkns, hrd wd flr fnsh, tight cNl ovr, r-1 5 wall insul Or Area lJ-value lns ul R Loss clg HTM Gain Btuh 21.0 39 0 0 00 49.0 1.58 48 1.06 32 15.0 11.2 337 0 Htg tflM 4.68 Bluh Mtr 211 0.86 66 45 0.065 0 30 0.022 30 0.312 ,€rccr {F y,"j!g. $!.3. I' nig nrs, ils u niu ","ar 2023 23.0.01 RSU62085 .8\Docum6nts\Wdghtsott HVAC\3l8 Eagl6 Ridge.rup Calc = W8 Fronl Doorfaces: S 2025-Jur-16 12.5E-2f Pege 2 {} wrlghtsoft Gomponent Gonstructions Laundry Job: Date: Jun 16,2025 By: Rapid Creek Mechanical For: Localion: Battlement Mesa,CO 4858 ftElevation: Latitude:40'N Outdoor: Drybulb ('F) Dailyrange ('D \,btbulb('D Wndspeed (m ph) \Argas, Un ity Mouniain Builders Eagle Ridge Dr,, Parachute, CO81635 Luis 3'18 Heating -2 r i.o Gooling 95 35 (H ) 59 7.5 lndoor: lndoor temperature ('D Design TD ('R Relative humidity (%) Moisture difference (grllb) lnfiltration: libthod Consf uclion quality Fireplaces Heatigs coolils 20 50 46.1 Simplified Average 1 (Average) 72 50 60.9 Construction descriptions Walls 12F-0sw: Frm wall, stucco ext, 1/2" wood shth, tr21 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions'l2C0sw Windows (no ne) Doors (none) Ceilinos Attic cemng, asphalt shingles roof mat, tr49 ceil ins, 5/8" gypsum board int fnsh Floors Flr floor, frm flr, 12" thkns, hrd wd flr fnsh, tight cMl ovr, F15 wall insul Or Area U.value lnsul R lltg HTM N','Ffu Mtr 21.0 4.68 0.86 Loss Clg HTM Galn Btuh Eluh 42I 0.085 114 0 68 0.022 68 0.312 8 0 0 49.0 1.58 108 1.06 72 15.0 11.2 768 0 0 ,&r t{t y.IsttJt:. !!' Risnlsurs uniu","ar2023 23.o.ol Rsu62085 ...8\Documenls\WrightsoftHVAC\3l8 EagleRidge.rup Calc =MJ8 FrontOoorfaces: S I0?6 Jun 16 1?:68:?7 Page 3 ConditionsDes f + wrbhtsott Component Constructions Pantry Jobi Oate: Jun 16,2025 By: Rapld Creek Mechanical Location: Battlement For: Mesa,CO 4858 ft 40'N Lu is Vargas, Un ity Mountain Builders 31 8 Eagle Ridge Dr., Parachute, CO 81635 Elevation: Latitude: Cooling o< 35 (H ) AO lndoor: lndoor temperafure ('D Design TD ('F) Relative humidity (%) Moisture difference (gr/lb) lnfiltration: tvbthod Constuc'tion quality Fireplaces HeatiBS 72 50 60.9 Simplified Average 1 (Average) coo+p 20 50 46.1Outdoor: Drybulb ('F) Dailyrange ('F) \ /btbulb ("R Wnd speed (mph) Heating 15.0 Construction descriptions Walls (none) Partitions (none) Windows (no ne) Doors (none) Ceilinos Attic ceiling, asphalt shingles roof mat, F49 ceil ins, 5/8" gypsum board int fnsh Floors Flr floor, frm flr, 12" thkns, hrd wd flr fnsh, tight crul ovr, r-1 5 wall insul U-value lns ul R l.lig HTM Loss Clg HTM Galn n'-'Ftu Mnr Btuh Mtr Btuh Or Area 81 0.022 81 0.312 49.0 1.58 128 1.06 85 15.0 11.2 908 0 0 ,6-'lt :y"lgltJ::*: Rishlsu irs u niversar 2023 23.0.01 RSU62085 ...8\Docum€nls\WightsoflHVAC\3l8EagleRidge.rup Calc=MJB FronlDoorfacos: S Pago 4 lnformation Design Conditions * wdgrr'tsoft Component Gonstructions Master Bath Job: Date: Jun 16,2025 By: Rapld Creek Mschanlcal Location: Battlement For: Mesa,CO 4858 ft 40'N Luis 318 Vargas, Unity Mountain Builders Eagle Ridge Dr., Parachute, CO81635 Outdoor: Drybulb ("F) Dailyrange ('F) \ btbulb('F) Wnd s peed (mph) Cooling OE 35 (H ) AO lndoor: lndoor temperature ('R Design TD ('F) Relative humidity (%) Moisture difference (gr/lb) lnfiltration: i/bthod Consfuction quality Fireplaces Elevation: Latitude: Heatigs 72 50 60.9 Simplified Average 1 (Average) coolJlts 20 50 46.1Heating -2 15.0 Construction descriptions Walls 12F-0swr Frm wall, stucco ext, 1l2" wood shth, tr21 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Wlndows 1D-c2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 It head ht Doors (none) Ceilinos Anic ceillng, asphalt shingles roof mat, r-49 ceil ins. 5/8" gypsum board int fnsh Floors Flr floor, frm flr, 12" thkns, hrd wd flr fnsh, tight cNl ovr, tr15 wall insul Or Area e 105 0.065 6 0.570 0.022 0.312 U-value lnaulR Loss Clg HTM Gain Bluh 21.O 91 0 41.O 246 84.5 387 49.0 1.58 234 1.06 156 15.0 11.2 1662 0 tltg HTM 4.68 Blrh Mtr 491 0.86 148 148 ,+,/ECl\ {f y:lf ltJ::ll' Ris hrs, ils u niu","ar 2023 23.0.01 RSU62085 .8\Documents\Wrightsoft HVAC\318 Eagle Ridge.rup Calc = MJ8 Fronl Doorfaces: S 2O25-Jun-1O 12:30:27 Page 5 ect lnformationP Design Conditions lnformationP * wdghtsofr Gomponent Constructions Master Closet Job: Date: Jun 16,2025 By: Rapid Creek Mechanical Location: Battlement Elevation: Latitude: Outdoor: For; Mesa,CO 4858 fr 40"N Luis 318 \hrgas, Un ity Mountain Builders Eagle Ridge Dr., Parachute, CO81635 neafigs 72 50 60.9Cooling 59 7.5 lndoor: lndoor temperature ('D Design TD ('R Relative humidity (%) Moisture difference (gr/lb) lnfiltration: Ilbthod Construc{ion quality Fireplaces Goolino /c 20 50 46.1 Drybulb ('F) Dailyrange ('F) tA,bt bulb ('F) Wnd s peed (mph) Heating : 15.0 95 35 (H )Sim plified Average 1 (Average) Or Area U.valug lnsulR lftg HTM Mtr 4.68 Bluh Rdtr 305 0.8665 0.065 92 0.022 92 0.312 Loss Clg HTM GainConstruction descriptions Walls 12F-0sw: Frm wall, stucco ext, 1/2" wood shth, tr21 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitiong 12Cosw Windows (non€) Doors (none) Ceillnos Attic ceiling, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board int fnsh Floors Fh floor, frm flr, 12" thkns, hrd wd flr fnsh, tight crul ovr, r-15 wall insul 21.O Btuh 56 40 00 49.0 1.58 145 1.06 97 15.0 11.2 '1030 0 ,&,'l* y:tsl::Trr Ris hLSu irs u niversar 2023 23.0.01 Rsu62o85 . -8\Documenls\Wriqhtsoft HVAC\318 Eagl6 Ridge.rup Calc = M8 Front Door fac€s: S 2O2!-Jur-10 12.58.21 Page 6 ConditionsDes # wrightsoft Gomponent Constructions Master Bedroom Job: Date: Jun 16,2025 By: Rapid Creek Mechanical Location: Battlement Elevation: Latitude: Outdoor: For: Mesa,CO 4858 ft 40'N Lu is Vargas, Unity Mountain Builder 318 Eagle Ridge Dr., Parachute, CO 81635 lndoor: hdoor temperature ('F) Design TD ('D Relative humidity (%) Moisture difference (gr/lb) lnfiltration: t\,bhod Constuc'tion quality Fireplaces coolj!g /5 20 50 46. Heatigs 72 50 60.9 Drybul b ('F) Dailyrange ("D Vlbt bulb ("F) Wnd speed (mph) Heating.: 15.0 Cooling OE 35 (H 59 7.5 Simplified Average 1 (Average) Construction descriptions Walls 12F-0sw: Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, i6" o.c. stud Partitions (none) Wndows 1 D-c2ovr 2 glazing, clr outr, air gas, vnl frm mat, ci inT, 114" gap, 114" thk; 6.67 ft head ht Doors (none) Ceilinds Attic ceiling, asphall shingles roof mat, r-49 ceil ins, 5/8" gypsum board int fnsh Floors Flr floor, frm llr, '12" lhkns, hrd wd flr fnsh, tight cNl ovr, r-1 5 wall insul Or Area U-value 0.065 0.065 0.065 0.065 lns ul R lltg HTM N','Ffu Mtr Losa Clg HTM Galn Bluh 112 67 25 204 129 7a 236 e s all EJU s30all 60 21.O 2't.o 21.0 21.0 0.86 0.86 0.86 0.86 4.68 4.68 4.68 4.68 604 365 1 106 0.570 0.570 0.570 41.0 41.0 41.0 '1231 1231 2462 64.5 34.3 49.4 1934 1028 296'1 212 0.022 212 0.312 49.0 1.58 336 1.06 224 15.0 11.2 2381 0 A. /aCCA {} y:hl-q:t' Rishrsurs u niu","ar 2023 23.0.01 Rsu62085 ...8\Documenls\WrightsottHVAC\318 EegloRadge.rup Calc =MJ8 FrontDoorfac6si S 2024-Jur-16 12.56.27 Page 7 lnformation n Conditions * wrbtrtsorr Component Gonstructions Living Room Job: Date: Jun 16,2025 By: Rapid Creek Mechanical Location: Battlement For: Mesa,CO 4858 ft 40'N Luis \6rgas, Unity Mountain Builders 31 I Eagle Ridge Dr., Parachute, CO 81635 Elevation: Latitude: Outdoor: Drybulb ("F) Dailyrange ('F) U,et bulb ("F) Wnd speed (mph) Design TD ('F) Relative humidity (%) Moisture difference (gr/lb) lndoor: lndoor temperature ("D Heatigs coo}['e 20 50 46.1 Simplified Average 1 (Average) 72 50 60.9Heating -2 15.0 Cooling 95 35 (H ) 59 7.5 lnfiltration: [/bthod Construc{ion quality Fireplaces construction descriptions Walls 12F-0sw: Frm wall, stucco ext, 1/2" wood shth, r-2'l cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, '16" o.c. stud Partltions (none) Windows 'I D-c2ovr 2 glazing, clr outr, air gas, vnl frm mal, ct infi, 114" gap,1l4" thk; 6.67 ft head ht Doors 'I 1 P0: Door, mtl pur core type Ceilinos Attic ceiling, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board int fnsh Floors Flr floor, frm flr, 12" thkns, hrd wd flr fnsh, tight crul ovr, r15 wall insul lnsul R lltg HTM Loss Clg tlTM Gain 4.68 4.68 4.68 4.68 Or Area LJ-value n s all 25 106 80 211 0.065 0.065 0.065 0.065 21.0 21.O 21.O 21.O Bluh Bt6tr Bloh 116 0.86 21 495 0.86 91 374 0.86 69 986 0.86 182 30 21 383 0.570 0.290 0.022 0.312 0 41.O 1231 34.3 1028 '10.5 20.9 438 4.00 84 49.0 '1 58 607 1.08 404 15.0 1't.2 4302 0 Af,cr {} yf le, -TJ::lt' Ris hrsuits u niu","ar 2023 23.0. 01 RSU6208s -..8\Documenls\WrighlsoftHVAC\3lSEagleRidge.rup Calc=MJ8 FronlDoorfaces: S ,025-Jun-16 1!:58:!7 Pag€ I ConditionsDes ',' .' {lf wrlghtsofr Component Gonstructions Office Job: Date: Jun 16,2025 By: Rapid Creek Mechanical Location: Battlement For: Mesa,CO 4858 ft 40"N Outdoor: Dry bulb ('F) Dailyrange ('F) \ btbulb('D Wnd speed (mph) Luis \Argas, Unity Mountain Builders 318 Eagle Ridge Dr., Parachute, CO81635 Heating -2 Gooling 95 35 (H ) 59 7.5 lndoor: Heating lndoor temperature ('F) 70 Design TD ("F) 72 Relative humidity (%) 50 Moisture difference (gr/lb) 60.9 lnfiltration: lrethod Consfuciion quality Fireplaces Elevation: Latitude: coolJlrs 20 50 46.1 15.0 Simplified Average '1 (Average) Construction descriptions Walls 12F-0swr Frm wall, stucco ext, 1/2" wood shth, tr21 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood lrm, 16" 0.c. stud Partitions(none) Windows 1 D-c2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Cellinos Attic ceiling, asphalt shingles roof mat, F49 ceil ins, 5/8" gypsum board int fnsh Floors FIr floor, frm flr, 12" thkns, hrd wd flr fnsh, tight cMl ovr, r-l 5 wall insul Or Area U.valu€lnsul R lftg HTM ffJFAd Mtr Lo88 Clg HTM Galn n all Btuh 57 14 71 66 17 0.065 0.085 u.uo5 21.0 21.0 21.O 4.68 4.68 4.68 308 0.8677 0.86 385 0.86 25 0.570 o.022 0.312 a4 84 49.0 41.O 1026 22.4 561 1.58 133 1.06 89 o15.0 11.2 944 0 -!F,ccr ti+ y-ng!,qt.lf Rishlsuil€o universar 2023 23 o.oi Rsu62o8s ...8\Docum€nts\W.ightsoflHVAC\318EagleRidge.rup Calc=MJ8 FrontDootfaces: S 202t.Jun-10 12:t0:27 Pag6 I ect lnformationP Design Conditions # wrightsofr Component Constructions Kitchen Job: Dato: Jun 16,2025 By: Rapid Creek M6chanlcal lnformation For: Location: Battlement Mesa,CO Elevation: 4858 ftLatitude: 40'N Outdoor: Drybulb ('F) Dailyrange ('F) \Arbt bulb ('F) Wnd s peed (m ph) \Argas, Unity Mountain Builders Eagle Ridge Dr., Parachute, CO 8'1635 Luis 318 Heating Cooling OA lndoor: lndoor temperature ('D Design TD ('F) Relative humidity (o/o) Moisture difference (gr/lb) lnfiltration: It/bthod Consfuction quality Fireplaces Hea$gs coo}ls 72 50 60.9 20 50 46.1 -? 150 35 (H ) <o 7.5 Simplified Average 1 (Average) Construction descriptions Walls 12F-0sw: Frm wall, stucco ext, 1/2" wood shth, tr21 cav ins, 5/8" gypsum board inl fnsh, 2'16" wood frm, 16" o.c. stud Partitions (none) Windows '1D-c2ov: 2 glazing, clr ouir, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 6.67 ft head ht Doors '1 1P0: Door, mtl pur core type Ceilinos Attic ceifing, asphalt shingles roof mal, r-49 ceil ins, 5/8" gypsum board int fnsh Floors Flr floor, frm flr, 1 2" thkns, hrd wd flr fnsh, tighl cNl ovr, F l 5 wall insul U.value lnsul R lltg HTM Loss Clg HTM Gain Bluh Mtr Or s all Area s30 w48 331 89 16 104 0.065 0.065 0.065 21.0 21.0 21.0 4.68 4.68 4.68 414 74 488 0.86 0.86 0.86 Btuh 14 90 102A 341 349 0.570 0.290 0.022 0.312 41.O 1231 34.3 10.5 20.9 1002 7.11 49.0 1.58 524 1.06 15.0 11.2 3717 0 -*rcct\ {F y-ng!]::f$ Rishlsu ir"o u niversar 2023 23.0.01 Rsu62085 ..8\Documenls\WightsoflHVAC\318E8glaRidge.rup Calc=MJ8 FronlOoorfaces: S 2O251!il-1O 12.58.27 Psga 1O Design Conditions f wrightsoft Gomponent Constructions Hall Job: Date: Jun 16,2026 By: Rapld Creek Mechanlcal Location: Battlement For: Mesa,CO 4858 ft 40'N Luis rgas, UnityMountain Builders 31 I Eagle Ridge Dr., Parachute, CO 81635 Elevation: Latitude: lndoor: hdoor temperature ("R Design TD ('F) Relative humidity (%) Moisture difference (gr/lb) lnfiltration: t\bthod Consfuc'tion quality Fireplaces Heatigs 72 50 60.9 coolils 20 50 46.1Outdoor: Drybulb ("F) Dailyrange ('D \ ,bt bulb ('F) Wnd s peed (mph) Heating -2 Cooling 95 35 (H 59 7.5 Simplifiod Average 'l (Average)15.0 Construction descriptions Walls (none) Partitions (none) Windows (none) Doors (none) Ceilinos Attic ceifing, asphalt shingles roof mat, r-49 ceil ins, 5/8" gypsum board int fnsh Floors Flr tloor, trm flr, 12" thkns, hrd wd llr fnsh, tight cNl ovr, r-15 wall insul Or Ares U-value lnsul R lllg HTM Loss clg HTM Gain ff''FAd Mtr Bluh RStr Bllh 49.0 1.58 33 1.06 22 15.0 11.2 232 0 0 21 0.022 21 0.312 Arccr 'lt y-flg:ttl:::' Righrs,ild uniu","ar 2023 23.0.0i Rsu62o85 ...8\Documenls\Wdghlsoft HVAC\318 Eagl€ Ridga.rup Calc : lVJg Front Doorfaces: S 2025.Jun-1G 1!:sBr27 Page 1 1 n Conditions f wrbhtson'Component Constructions Bedroom 2 Job: Dats: Jun 16,2026By: Rapld Creek Mechanical ect lnformationP For:Lu is \Argas,Unity Mountain Builders 31 8 Eagle Ridge Dr., Parachute, CO 81635 Design Conditions Location: Battlement Mesa,CO lndoor: Heatjlg Cooljlg lndoor temperature ("D 70 75 Design TD ('F) 72 20 Relative humidity (o/o) 50 50 Moisture difference (gr/lb) 60.9 -46.1 lnfiltration: [/bthod Elevation Latitude: 4858 ft 40'N Outdoor:Heating Cooling 95Drybulb ("F) Dailyrange ('F) \/\,bt bulb ("D Wnd s peed (mph) .: '15 0 35 (H ) 59 7.5 Consf uction quality Fireplaces Sim plified Average I (Average) Construction descriptions Walls 12F-0sw: Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 1D-c2ov:2 glazing, clt outr, air gas, vnl frm mat, clr innr, 1/4" gap, 'll4" thk; 6.67 fi head ht Doors (none) Ceilinos Attic ceilng, asphalt shingles roof mat, tr49 ceil ins, 5/8" gypsum board int fnsh Floors Flr floor, frm flr, '12" thkns, hrd wd tlr tnsh, tight cNl ovr, r-15 wall insul ln8 ul R Htg HTM tr,FM MNI Losa Clg HTM Galn Btuh Mtr Or Area 101 34 78 212 lJ-value 0.065 0.065 0.065 0.065 0.570 0.570 0.570 Bluh 87 29 67 183 n e all n30 w30 all 60 21.0 21.0 21.0 21.0 4.68 4.68 4.68 4.68 470 158 365 993 0.86 0.86 0.86 0.88 41.O 41.0 41.0 22.4 64.5 43.4 673 1934 2607 1231 1231 2462 174 0.022 174 0.312 49.0 1.58 276 1.06 184 15.0 11.2 1954 0 0 ,&,{} yjl|ljTf:' nisnrsuns uniuu,"at2023 23 o oi Rsu620ob .8\Documents\Wightsoti HVAC\318 Eagle Ridge.rup Calc = M8 Fronl Door faces: S ?0?6 Jun 16 1?:68:?7 Page 1 2 * wrightsoft Gomponent Constructions Bathroom Job: By: Rapld Crsek Mechanlcal Location: Battlement Fori Mesa,CO 4858 ft 40"N Luis \Argas, Un ity Mountain Builders 31 I Eagle Ridge Dr., Parachute, CO 81635 Outdoor: Drybul b ("F) Dailyrange ('D \ btbulb ('F) Wnd s peed (mph) Cooling OE 35 (H ) AO 7.5 lndoor: lndoor temperature ('D Design TD ('F) Relative humidity (o/o) Moisture difference (gr/lb) lnfiltration: [/bthod Consfuc{ion quality Fireplaces Elevation: Latitude: Heatigs 72 50 60.9 Cooligrs 20 50 -46.1Heating-: 15.0 Simplified Average 1 (Average) Or Ar€a U-value ln8 ul R lfrg HIM 4.68 190 0.86 Loss Clg HTM GainConstruction descriptions Walls 12F-0swr Frm wall, stucco ext, 1/2" wood shth, r-21 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partltions (none) Wndows 1D-c2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr innr,'ll4" gap, 1/4" w thk; 6.67 ft head ht Doors (none) Ceilinos Attic ceillng. asphalt shingles .oof mat, r-49 ceil ins, 5/8" gypsum board int fnsh Floors Flr floor, frm flr, 12" thkns, hrd wd flr fnsh, tight crul ovr, F15 wall insul Sluh 41 0.065 6 0.570 54 0.022 54 0.312 21.O 35 41 .O 244 A4 .5 387 49.0 't.58 86 1.06 57 '15.0 11.2 609 0 ,*/CCt {} :lJ9!::tJ|:: Ris hf suit@ u niv 6rsat 2023 23.0.01 RSU62085 ...8\Documents\wdghtsofl HvAC\318 Eagl€ Ridg6.rup Calc = MJB Front Door tacesi S 20!5.J0n-16 12:58:27 Page 13 ect lnfo Desi n Conditions $ wrphtsoft Component Constructions Bedroom 3 Job: Date: Jun 16,2025 By: For: Location: Battlement Mesa,CO Lu is \Argas, Unity Mountain Builders 318 Eagle Ridge Dr., Parachute, CO 81635 Outdoor: Drybulb ('F) Dailyrange ('D \ ,btbulb ('D Wnd speed (mph) Heating Gooling Elevation: Lalitude: 4858 ft 40"N lndoor: lndoor temperature ("D Design TD ('D Relative humidity (o/o) Moisture difference (gr/lb) lnfiltration: lvbhod Construc{ion quality Fireplaces Heati3s cooligg 72 50 60.9 20 50 46.1 -2 rio 95 35 (H ) 59 7.5 U-value 0.065 0.065 0.065 21.0 21.0 21.0 470 0.86 323 0.86 793 0.86 Simplified Average 1 (Average) lns ul R Htg HTM t'FM Mnl Loss Clg HTM Gain Bfuh MN' 4.68 4.68 4.68 Construction descriptions Walls 12F-0sw: Frm wall, stucco ext, 1/2" wood shth, r-2 1 cav ins, 5/8" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 1 D-c2ov; 2 glazing, clr outr, air gas, vnl trm mat, clr innr, 114" gap, 1 14" thk; 6.67 ft head ht Dooas (none) Ceilinos Attic cemng, Esphalt shingles roof mat, tr49 ceil ins, 5/8" gypsum board int fnsh Floors Fk floor, frm flr, 12" thkns, hrd wd flr fnsh, tight cNl ovr, r-1 5 wall insul Or Aroa Bluh 87 60 147 s all 101 69 170 s30 w30 all 60 0.570 0.570 0.570 41.O 41.O 41.O 1231 1231 2462 34.3 64.5 49.4 1024 1934 2961 0 0 0 160 0.022 160 0.312 49.0 1.58 253 1.06 168 15.0 11.2 1792 0 ,€,rCCr tl* g:!c. I-E-.t Rishrsu ireo u niversar 2023 23.0.01 RSU62085 ..8\Documents\WrighlsoflHVAC\31SEagleRidge.rup Calc=MJ8 FrontDoorfaces: S 2O25-Jun-16 12:54:27 Page 14 ect lnformationP Design Conditions {ii wriqhtsoft ProjectSummary Entire House Job: Oate: Jun 16,2026 By: Rapid Creek Mechanical For:Luis Varoas. Unitv Mountain Builders 31 8 Eagfe Ridge br., Parachute, CO 8 1635 Notes: Weather: BattlementMesa,CO Winter Design Gonditions "F otrtside db'F lnside db Summer Design Conditions -2 70 72 Outside db lnside db Design TD Heating Summary Structure 50769 BtuhDuc'ts '10367 Btuh Centralvent(SER=50%36cfm) 1207 Btuh Energy recovery Humidifi€tion PiDino EquiP:ment load lnfiltration [/bthod Sim plified Sensible Gooling Equipment Load Sizing Structure Du c'ts Cenkal vent (SER=50o/o 36 cfm) Energy recovery Blower Use manufacrturefs data n Rate/swino multiolier 1.00 Equipmenf sensible load 288M Btuh Latent Cooling Equipment Load Sizing Structure -477 BtuhDucts -557 Btuh Central vent (LER=S0o/o 36 cfm) 477 Bfrh Enerov recoveru Equipm66t latenttdad 0 Btuh Equipment Total Load (Sen+Lat) 28864 Btuh Req. tctal capacityat0.T0 SHR , 3.4 ton Cooling Equipment Summary Make Trade RUNTRU RUNTRUCond 44rc3036A1Coil A4MXB4248AC6+A951X080BD4SA "F Desion TD Daily-range Relative humidity Moisture difference 95 75 .F .F .F20 H 50%46 gr/lb O Bfuh 1.00 20194 Btuh 8244 Btuh340 Btuh Consbuclion qualiV Fireplaces 0 Btuh0 Btuh 62343 Btuh Averaoe 1 (Averag-e) Heatino 183/ Coolim 1 837 16918 0.20 56 AFUE Btuh Btuh "F cfm cfin/Btuh in H2O 70 1200 0.020 0 Aea (ft') Volume (ff) Ar changes/hour Equiv. AVF (cfm) '16918 o.45 127 Heating Equipment Summary Make RUNTRUTrade RunTru Model AHRI ref 4951)0808D4S*- 204606338 Efficiency Heating input Heating ouFut TemDerafure rise Achrbl air flow Air flow factor Static pressure Space themostat AHRI ref 205012936 Efficiency Sensible cooling Latent cooling Total coolino Actual air flo'w Air flow factor Statjc pressure Load sensible heat ratio OE 80000 77000 12.0 EER, 14 SEER 25200 Btuh 10800 Btuh 36000 Btuh 1200 cfm 0.042 c1?n/Btuh0 in H2O Sold4bllc valus have b*n manuelly ovoddden Ca lculations approved byrcCAto meetallrequirements of l\ilanual J 8th Ed, E.,aCCr {'l* y"-1t91t9o--11 RishLsuite6 universar2023 23.0 01 Rsu6208s ...8\Documents\Wighlsoft HVAC\318 Eagle Ridge.rup Calc = MJ8 Ftont Door fac6s: S 2O25-Jvn-16 12:58,27 Page 1 +wrlghtsoft'AED Assessment Entire House Job: Date: Jun 16,2025 By: Rapid C.eek Mechanical Forl Luis 318 Vargas, Unity Mountain Builders Eagle Ridge Dr., Parachute, CO81635 Location: Battlement lndoor: lndoor temperature ('D Design TD ("F) Relative humidity (%) Moisture difference (gr/lb) lnfiltration: Cooling 75 20 50 46.1 Heating 70 50 60.9 Elevation: Latitude: Mesa,CO /t858 ft 40"NOutdoor: Heating Drybulb ('F) -2 Dailyrange ('F) \,btbulb('F) Wnd speed (mph) 15.0 Cooling 95 35 (H ) 59 7.5 FtulycdruLd Maximum hourly glazing load exceeds average by 29.1% House has adequate exposure diversity (AED), based on AED limit of 30% AED excursion: 0 Btuh Boldqallc valua havs tun m.nually oveftlddan {'l' yj!ghlt-:*' "'n n"su o*, n'u","ar 2023 23.0.01 Rsu62085 2O25.Jun"16 1? 54 27 Pag6 1,6t ...8\Oocuments\WdghtsoftHVAC\318EagleRidge.rup Calc:MJB FtonlDoorfacos: S lnformation n Conditions Test for Adequate Exposure Divers r{r wrbhtroft' Right-J@ Worksheet Entire House Job: Date: By: Jun 16,2025 Rapid Creek Mechanical Room hsight Enti€ House 202.2 lt 9.2 ft 1837.3 ff 12.3 It h€at/cool60 x 50 ft 9.0 fr 30 0 fl: Ty Conskuction {8tuh/ft1"F Or HTM (Btuh/fl'.)or psrim6t€. (fl) Load (Btuh) A€a (fr)or perimsler {f0 (Btuh) Heat Cool Gross N/P/S Heat Cool N/P/S Coot 6 1 LGlGL-D1- Li H P c 'l2F4sw 'lO -o2ov 'lD -c2ov 1 1P0 12F-osw 1D -c2ov 12F4q 1D -c2ov 12F-osw 1 D -c2ov 11P0 l2C-tuw Attic ceiling, aspha Fk llooi fm fli 0.08t 0.57( 0,57( 0.29{ o.o6t 0.57( 0.061 0.57( 0.06{ o.57( 0.29( 0.0q o.o21 0.31: 4.8t 41.U 41.Ot 20_ 8t 4.6t 41.Ot 4.88 41-U 4.6€ 41.01 20.8t 0.0( 1.5t 11.24 0.8r 22.41 4.0c 0.8€ 64.4f 0.8€ u_28 0.8e &.4€ 71' 0.0c 1.0e 0.0c 276 30 25 431 493 120 427 66 48 220 1437 1837 2m 0 0 21 395 0 373 0 313 0 48 220 1837 1837 9tr 1231 1At 438 i84t 147 7 174a 4g2l 1462 2705 100: 0 291( 2mtr 173 673s1av1 2321 322 4111 270 4251 u1 0 194( 0 0 0 0 0 45 0 0 0 0 0 0 6€ 30 30 0 0 0 0 45 0 0 0 0 0 0 6€ 30 30 0 0 0 0 211 0 0 0 0 0 o 0 48 337 0 0 0 0 0 0 0 0 0 0 0 32 0 c) AED €xcu6ion i0 Envelope loss/gain 42341 1539'595 12 a) b) Infiltalion a42t 105i 233 29 0 13 lnl6rnal gains:occupants @ 230 1 15r 260( 0 0 Subtotal (lines 6 lo 13)5076{2O191 828 90 14 15 Redistibution Sublotal 4101 c c c 5076{ 10361 C C( 2019 A24t 20.1 41% 0 0 0 828 169 0 0 0 90 37 Tolal room load Af requned (cfm) 611 3( 120( 2U3t 120( 997 20 127 5 nAh|lati^ne .nnr vffl hv AI](:AI^erh trA o * Y.tlelt'on- n,onrs,f4 8too"r."nr"\wighlsof r HVA-C\318 il@ Universal 2023 23.0.01 RSU62085 Eagle Ridg6.rup Calc . MJ8 Front Door faces: S 2025)un-16 12:54:27 Page 1 {i} wrlghtroft' Right-.J@ Worksheet Entire House Job: Date: By: Jun 16, 2025 Rapid Creek Mechanical Expos6d Mll Room h6aght Laundry 13.7 ft 9.0 ft hoat/cool 13.7 x 5.0 ft 68.3 ft' 0fr 9.0 fl 13.7 80.9 ff 5.S ft Ty Conslauction (Btuh/ft'z-'F Or HTM (Btuh/ft') Ar6a {ft")or pe.imeter (ft) Load (Bl0h) (ff )perim€ter (ft) Load (Btuh) Heat Cool Gross N/P/S Cool Gross N/P/S Hsat Coot 1 c F 12F4Bw 1D -c2ov 1D -c2ov 1 1P0 12F"0sw lD-c2ov 12F4sw 1D -c2ov 12F-osw 1 D -c2ov 11P0 12C 4Bw Attic ceiling, Fh fl@r, fm fli 0.06t o.57t 0.57( 0.29( 0.06t o 57( 0.06r 0.571 0.06r 0.57( 0.2 9( 0.00( o.o2t 4.88 41.A4l.a 20.88 4.68 41.04 4.88 41.4 4.68 41.04 20.88 0.00 1.58 11.24 0.8( 22.4i 22.41 4.0( 0.8( 64.4l 0.8( 34.2! 0.8( 64.4t 7.1 0.0( 1.0( 0.0( 111 68 6€ 'l1t 6€ 68 42 t0€ 768 I( C( ( ( ( C ( C C c 72 c c c c c c c c c c c c c 81 8t 0 0 0 0 0 0 0 0 0 0 0 0 12A 908 0 0 0 0 0 0 0 0 0 0 0 0 a5 0 c) AED €xcursion -51 '8 Env slop€ loss/gain 918 23 103r 77 12 a) lnf iltation b) Room ventilalion 47 0 6 c 0 0 13 lnterf,al gainsi O€upanls @ 230 0 c 50c 0 0 0 Subtotal (linss 6 to 1 3)965 529 103t 77 14 15 Redisldbution Oucl loads 2004 41'/L ( ( ( 96t 19i 0 0 0 218 2ta/o 41Dl c c c 103( 212 0 0 0 77 31 116 745 31 124t 24 109 5 (]rldrlalidnc annr ve.l bvACCAIn Rth trd o., # w.rlght-on Riqhlsuil@unversat202323.0.01 RSU62O85&G...SlDocuments\WrightsoflHVAC\318EagleRidge.rup Cab=m8 FronlDoorfaces: S 2O25-Jun-16 12:58:27 Page 2 + wrbhtroft' Right-J@ Worksheet Entire House Job: Date: By: Jun 16,2025 Rapid Creek Mechanical Exposed Hll Room hsight Master Balh 1231t 9.0 ft 148.0 ft, 12.O 12.3 ft Mast€r Clos6l 11.7 lt 9.0 fr 91.7 ltz s1.7 lr1.0 Ty Constuction (Btuh/fta"F Ot HTM (Btuh/ft") {ff )perimeler (ft) Load (8tuh)o. perimeter (ft) Load (Bluh) Heat Cool Gross N/P/S Heal Cool Gross N/P/S Heat Cool 6 1 ln LJlO'L la L-ctn c F i2F-&w 10-c2N 1 D -c2ov 11P0 12F-0sw 1 D -c2ov 12F&w 1 D -c2ov 12F-0sw 1 D -c2ov 11P0 12C {sw Attjc ceiling, aspha Flrfl@r fmfh, 0.o6t 0.57( 0.67( o.291 o-06r 0.57( 0.06r 0.s7( 0.06{ 0.57( 0.29( 0.o0( o.o2t 0.3 1' 4.68 41.U 41.U 20.88 4.68 41.04 4.88 41.U 4.68 41.U 20.88 0.00 1.5€ 11.21 0.8( 22.4i 22.4i 4.0( 0.8( u.4t 0.8(v.2l 0.8( 64.41 7.1 0.0( 1.0( oo( 0 0 0 0 11 6 0 0 0 0 0 0 148 148 ( ( ( ( 10t ( ( ( ( ( ( ( 14t 14t ( ( ( C 491 24e( ( ( ( C C 2A 164' c c c c 341 c c c c c c 15€ c c c c c 6a c c c c c c 4C 92 c c C c 65 C C c c c c 4e 92 s2 0 c 0 € 305 c 0 0 0 0 0 0 145 103( 6 c) AED excuEion -23 -19 Envelope loss/gain 263t 611 1481 134 12 a) lnfiltalion b) Room ventilalion 575 0 72 0 338 0 42 0 13 lnternal gains:O4upants @ 230 0 0 0 0 0 0 Subtotal (lines 6 to 1 3)320€682 141!171 14 15 R6diskibution Subtolal Duct loads 20q 41% 0 0 0 320€ 655 0 0 0 642 279 2O'/o 41% o o 0 1819 371 c c c 177 72 Total room load Af rcqui€d (cfm) 386: 76 961 41 2194 43 245 1C caldrlalions aonroved bvACCAto meet all reouirements of i/anual J 8th Ed. ^er {} y-.Il9l:-?i.l: ' Ris hrs, it@ u niu","at 2023 23.0.01 Rsu62085 . 8\Documents\Wightsof t HVAC\318 Eagle Ridge.rup Calc = W8 Fronl Door f aces: S 2025-Jun-16 12:58:27 Page 3 f wr[hroft' Right-.J@ Worksheet Entire House Job: Oate: By: Jun 16, 2025 Rapid Creek Mechanlcal 1 2 3 4 5 Exposed Mll Room height Mastor Bedrcom 32.9 fl heaVcool 12.0 x 17.7 fl 9.0 ft 212_0 ft' Liv ing Room 2A.2 fl heai/cool 1.0 x 383.0 lt 10.0 ft 383.0 fP Ty Construction (Btuh/tF'F Or HTM (Bluh/ft')or perimster (ft)(Bluh) Area (l') or po.ameler (lt) Load (Btuh) Hoal Cool Gross N/P/S Heat Cool Gmss N/P/S Heal Cool 6 1 lc In tn tl---o L-G Litr P c 12F&w lD{2ov 1D{2ov 1tP0 12F osw 1D-c2ov l2F{sw lD{2ov 12F osw 1D-c2ov 11P0 12C -06w Atlic c€iling, aspha Fk floor, fm fk, 0.06! 0.57( 0.57( 0.29t 0.06t 0.57( 0.0tr 0.57( 0.06: 0.57( o.29( 0.00( 0.o22 0.3 1' 4.6€ 41.U 41.U 20.88 4.68 41. 04 4.68 41.U 4.68 41.04 20.88 0.00 1.58 11.21 0.8€ 22.42 22.42 4.0( 0.8€ 84 4e 0.8f u.2r 0.8€ 64.4€ 0.0c 1.0€ 0.0c ( ( ( ( 15! 3( l0[ 2t ( ( ( 212 c c c c 12e c 78 c c c c 212 212 0 0 0 0 604 1231s5 1231 137 0 0 0 3tr 2341 ( ( ( ( 11i 193, 6; 1021 2!( ( ( 222 ( 4 t ( 21 c c 13€ 8( c ( ( 38: 38: ( ( 21 ( ( 10€ ( 8(( ( ( 38: 11€ 0 0 438 0 0 495 1231 374 0 0 0 607 4302 0 0 & 0 c 9i 102t 69 0 0 0 4U 0 c)AED excursion -34 Envelope loss/gsin 6281 299i 7564 1664 12 a) b) I nf iltratio n 1 53t 192 1356 0 170 0 13 lnternal gains:Occupants @ 230 46(0 900 Subtotal {lines 6 to 1 3)7A2t 364t 8920 2734 14 15 Redistdbution Sublotal Duct loads 20.1 410/o ( ( ( 7821 153i c c c 364( 148(200/,414/a 0 0 0 892 0 1822 0 0 0 2734 1111 Tolal room load Af requked (cfm) s41i 18! 513t 211 107 41 211 3850 c.l^'il'ti^nc rh^r \/a.l hvAn(]Atd alh trd ,+ + Y'.rlglq:-lt' Riohlsuir@ u nrversar 2023 23 0 oi Rsu620a5f,A . .etOocuments\Wighlsof I HVA-C\3l8 Eagle Ridge.rup Calc = W8 Fronl Door f sces: S 2O25-Jun-16 12:58:27 Pag6 4 f wr[htroft' Right-.J@ Worksheet Entire House Job: Date: By: Jun 16,2025 Fbpid Creek Mechanical Room height Offac6 11.9 ft 9.0 ft 84.0 fe 10.1 x 8.3 ft Kitch6n 20.3 ft heat/cool 1O x 330.9 ft 9.0 fl 330 9 fi, Ty Conslruction (Btuh/ft'.-'F Or HTM (Btuh/lt'z)or perimet€r (rl) Load (8luh) Area (fr)or p€rim€ter (ft) Load l8luh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Cool 6 I vl^ r--t ID l^ LG l-ctn c F 12F&w 1 D-c2ov lD-c2ov 11P0 12F-0sw 1D-c2ov 12F{sw 1D -c2ov 12F-0sw 1 D -c2ov 11P0 'l2C -osw Attic c6iling, aspha Fk fl@r, fm f li 0.06r 0.57( 0.57( 0.29 0.061 0.57t 0.06t 0.57( 0.061 0.57{ 0.291 0.00r o.o2t 0.3 1i 4.6t 41_U 41.U 20.8t 4.6t 41.Ot 4-6€ 41.01 4.6t 41.Ot 20.8t 0.0( 1.5t 11.21 0.8€ 22.43 22.4n 4.0c 0.8€ 64 4f 0.8€ u.2a 0.8€ u.4a 7.1', 0.0t 1.0€ 0.0c 9'1 0 0 17 0 0 0 0 0 0 0 84 84 0 0 0 17 0 0 0 0 0 0 0 84u 3tr( lMt ( 7i ( ( ( ( ( ( ( 13: s4. 57 c s1 ( 14 c( ( ( c c C 8g I C( ( ( C c 111s &t 4e C 331 331 ( ( ( ( ( ( 8! ( 1t ( 4t ( 33r 0 0 0 0 0 0 414 1231 74 0 1 002 0 524 3717 0 0 0 0 o 0 77 1028 14 0 v1 0g9 0 c) AEO excursion 6S Envelope loss/gain 24aI 696i 174C 12 a) b) lnfiltation 55€69 0 944 0 11t 13 lnt6mal gains:Oeupants @ 230 234 0 120( Subtolal (lines 6 to 1 3)304:921 7S0e 305f 14 15 Rodistibution Subtotal 20.1 4101 c 0 c 304: 621 0 0 0 921 376 20%410/r 0 0 0 790e 161 3 0 0 0 3058 124e 366: 72 1297 55 9521 187 430€ 182 n'l.'rlrfi^n. annr vc.l hvAr](:Atd qth tri - +F w.rlght-on Rioht suileo universat2023 23 0 0l RSU62O85€* 8\Do"r."nt"\Wightsol t HVA-C\318 Eagle Ridge.rup Calc = ru8 Front Door f aces: S 2O25-Jun-16 12:54:27 Pag€ 5 f wr[htmft' Right-.J@ Worksheet Entire House Job: Date: By: Jun 16,2025 Rapld Creek Mechanical I 2 3 4 5 Expos€d Hll Room heiqht Hall 0fr 9.0 ft 20.7 ft2 4.O 5.2 ft Bedroom 2 30.3 ft 9.0 ft 174 0 lt, 12.O ll14.5 Ty Conslruclion (Btuh/fla"F Or HTM (8tuh/tl')or perimeter (fl)(Btuh)or po.imeter (lt)(Btuh) Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 1 ktp Y* L-ck c 12F-osw 'l D {2ov lD -c2ov 11P0 1 2F osw 1D-c2ov 12F4sw lD {2ov 12F-osw 1D-c2ov 11P0 l2C -osw Attic cailing, aspha Flr floor, fm fk, 0.061 o.57( 0.57( 0.29( 0.06: 0.57( 0.06: 0.57( 0.061 0.57( 0.29( 0.00( o.o2i o.31t 4.68 41.04 41.04 20.88 4.68 41.04 4.68 41.04 4.68 41.O4 20.88 0.00 1.58 11.23 0.8( 22.4: 22.4i 4.Ot o.8( 64.4l 0.81 0.8( 64.41 7-1 0.0( 1.0( 0.0( c c ( c ( ( c ( c c c c 21 21 c c c c c c c c c c c c 21 21 3: ( ( ( ( ( ( ( ( ( c ( c 22 ( 101 C C c 34 c ct 78 c C c 174 174 470 1231 0 0 158 0 0 0 365 1231 0 0 276 1954 87 473 0 0 29 0 0 0 67 1934 0 0 184 0 c) AED excursion 428 Env elope loss/gain 265 2a 568(3402 12 a) lnfillration b) Room venlilation 0 c C C 141( 0 176 0 13 lnlernal gains:Occspants @ 230 C c c 1 234 0 Subtotal (lines 6 lo 1 3)265 2C 7096 3809 14 15 Redisribution subtolal Ducl loads 20al 41% 0 0 0 265 54 c c c 2C €200n 414/. 0 0 0 709f 1449 0 0 0 3809 1554 Ai requred {cfm) 31€ 6 28 1 854: 168 5363 226 Ca ld rletinns ennrdved bvACCAto I Arh tr.1 -*.- * wrrglrt'on REhFSuit@ universar 2023 23 0.01 RSU62O85&s 8\Documents\wflghlsolt HVAC\318 Eagle Ridge.rup Calc = MJ8 Fronl Door f aces: S 2025 Ju^-16 12:54:27 Page 6 f wrbhtroft' Right-.J@ Worksheet Entire House Job: Oatei By: Jun 16, 2025 Rapid Creek Mechanlcal Exposed mll Room h6ight Balhroom 5.2 lt 9.0 ft il2 fl. 10 5 52 ft B6d room 3 25.5 ft 9.0 tt 14.5 159 5 fr 110 fi Ty Constuction (Btuh/ft*F Or HTM (Btuh/ft')or perimeter (rt) Load {8tuh) Ar€a (fr)or p€rimel6r (ft) Load (Btuh) Heat Cool Gross N/P/S Heat N/P/S Cool 6 1 lilltr lG Li L-Gtr c 12F4sw 1D a2ov 1D-c2N 11P0 1 D -c2ov 12F{sw I D-c2ov 12F-0sw 1 D -c2ov 11P0 12C-tuw Attic cailing, asphs Fk floor, fm flr, 0.06r 0.57r 0.57{ 0.29r 0.061 0.57r 0.081 0.57( 0.061 0.57( 0 29r 0.00{ o o2t 0.3 1: 4.88 41.U 4t.04 20.88 4-68 41.04 4.68 41.U 4.68 41.04 20.88 0.00 1.58 0.8t 2.4i 4.Ol 08( 64-41 0.8t 34.21 0.8{ u.4t 7.1 0.0( 1.0( 0.0( ( c( ( ( t C C 41 a t C 54 & c c c c c c( ( 41t ( ( 54 & 19C 24e € c 86 60€ 347 0 0 57 0 0 0 0 0 0 0 131 30 30 0 0 160 180 c c c 0 0 c 101 0 6S 0 c 0 160 180 ct( 0 c 0 474 1231 0 0 253 1752 0 0 0 0 0 0 a7 1028 60 193! 0 0 168 0 c) AED excorsjon 124 161 Env elop€ loss/gain 60:530(343t 12 a) lnfiltalion b) Room ventilation 241 3C c 1 18t 149 0 13 lnternal gains:Occupants @ 230 230 0 Subtolal {lines 6 to 13)137 i 633 e8s 381 6 14 15 Redistibution Sublotal Duct loads 2001 414/t C c c 137i 28C 0 0 0 633 258 29o/o 410/a 0 0 0 648S 0 0 0 3816 1558 Tolal room load 165i 32 892 38 7814 153 537 4 227 CA l.r rlAlidn e ,nnrdvcd hv Atrl(]A to arh trd -r{+ *,.rort--n.t*- Rrshl-Suild Universal2023 23 001 RSU62085&q .. 8\Documents\wnqhlsof r HVAc\3la Eagle Ridg€ rup Cab = ru8 Front Door f acesr S 2O25-JM-16 12:5427 Page 7 t Level I K rzoo "r. .tr} Ronr ^m 2 -Xl,'.",- lXtt:"t. KziIfa "K-r, "r, nn,",^.El*",. "''Kl!",. Xl1,3ffi,ts"r.K 76 cfm X[,ouELtos "r' (E!60 gle3 6 cfm ^,",J-;108 Job #: Performed by Rapid Creek Mechanical Luis Varg6 318 Eagle Ridge Dr. PaEchutq CO 81635 Scale: 1 :95 Page 1 Rightsuite@ UniveEl 2023 23.0.01 RSU62085 2025-Jun-16 12:58:35 ...ghtsofi HVAC\318 Eagle Ridge.ru