HomeMy WebLinkAboutConditions of Permit1)
2)
3)
CONDITI ONS OF PE RMIT
BLRE-0 6-25-9284
DUSTIN & TARA CHENEY
New Single-fami ly dwel li ng
TBD CR 313, New Castle
Sec 25, Twns 07, R9 1 - 239925400082
ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)AND 2018
I NTERNATIONAL EN ERGY CONSERVATION CODE (I.E.C.C.)
PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED.
WtLDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNIry DEVELOPMENT WEBSITE FOR
ADDITIONAL I N FORMATION.
OPEN HOLE SOILS REPORT IS REOUIRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
1,500 PSF soil bearing. lnclude compaction report for structural fill.
MUST MAINTAIN 35 FT SETBACK FROM HIGH WATER MARK PER SURVEYOR'S STAMPED PLAN C1.
ROAD & BRIDGE DRIVEWAY REVIEW / APPROVAL: PRIOR TO FINAL BUILDING INSPECTION &
CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S
ROAD & BRIDGE DEPT. CALL 970-625.8601 AND HAVE ROAD & BRIDGE STAFF SIGN THE PERMIT
INSPECTION CARD.
SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY PROVIDE FINAL APPROVAL/SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPT.
4)
s)N
\
N
$
s
7
B
6)
10) BLOWERDOORTESTTSREOUTRED. MUSTSUBMTTBLOWERDOORTESTREPORTTOGARFIELD
COUNTY COMMUNIry DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL.
1 1) PRESCRIpTtVE PATH USTNG RESCHECK SOFTWARE lS CHOSEN FOR ENERGY COMPLIANCE OF THIS
HOME. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE-
HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE M1507.3.3(1)AND (2)
SHOWN ON COVER SHEET.
e)