Loading...
HomeMy WebLinkAboutInstallation Observation Report Certificate of Inspection & Acceptance April 18, 2025 Coleman Project 101 Monument Ridge Road Parachute, CO 81635 Parcel No. 2407-202-26-010 The onsite wastewater treatment system (OWTS) of reference was inspected on April 18, 2025. The system was found to conform with the plans and specifications set forth in the OWTS design for the aforementioned property prepared on May 7, 2024, and later revised on November 14, 2024. Swimming pools, ponds, or other water features were not included in the submitted or approved design. Setback of OWTS components from property lines and easements are based on information provided by owner or owner’s representative. Soil cap and final grading associated with any OWTS components are not included in this certification. Copies of the engineered plan are on file at Garfield County or may be obtained from the undersigned design engineer. Seal Kachayla R. Cronk, P.E. P.O, Box 140 Mack, CO 81525 970-250-0572