HomeMy WebLinkAboutConditions of PermitCONDIT IONS OF PE RMIT
BLMF-O6-25-9309
KURTIS & NICOLE CONRAD AND MELISSA BOOKER
IRC MODULAR HOME ON ENGINEERED FOUNDATION CRAWL SPACE
TBD CR 320, RifIE
Dotson Minor, Lot 2 - 217527 401 002
MANUFACTURED HOUSES ARE REGUTATED & INSPECTED BY COTORADO DEPT. OF HOUSING (C.D.O.H.)
AND ALt FACTORY.BUILT RESIDENTIAL STRUCTURES INSTATLED IN GARFIELD COUNTY MUST MEET
C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTATLATION ATTHE JOB SITE.
(2O18 |ECC'BLOWER DOOR TESTTNG',ON PREMISES AFTER INSTALIATION SHALL NOTAPPLY FOR
MANUFACTURED HOME TYPE --
AS CURRENT ENERGY COMPLIANCE FOR STATE OF COTORADO IS TO BE VERIFIED AT THE FACTORY)
1)
2)
3)
FOUNDATION CRAWL SPACE & EXTERIOR DOOR LANDING i STAIRS SHALL COMPLY WITH 2015 I.R.C.,
201 8 I.E.C.C. AND MANUFACTURER'S INSTALLATION REOUIREMENTS'
REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNry'S BUILDING REOUIREMENTS AND
MAN U FACTU RER'S I NSTALLATION REOU I REM ENTS.
WtLDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNry COMMUNIry DEVELOPMENT WEBSITE FOR
ADDITIONAL I NFORMATION.
ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORIVIED BY A COLORADO LICENSED
ELECTRICIAN.
ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH.IN APPROVAL, ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF
OCCUPANCY.
PROPANE FUEL- ryPE SPECIFIED: PROPANE GUIDE STAPLED TO FIELD COPY.
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING
INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM.
GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS DESIGNED AT 'I,5OO PSF, VERIFY 36 INCH MINIMUM FROST DEPTH & UFERGROUND
INSTALLED. OPEN HOLE SOILS REPORT REOUIRED AT FIRST FOOTING INSPECTION.
B. FOUNDATION
C. SEPTIC SYSTEM CONNECTION
D. PLUMBING/GAS
E. SITE FRAMING, STAIRS, HANDRAILS PER STRUCTURAL ENGINEERS PLANS AND FIELD COPY.
F, FINAL INSPECTION & CERTIFICATE OF OCCUPANCY*
*NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR
TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY
N
'aI-\
\
\
N
4)
s)
6
7
8)