Loading...
HomeMy WebLinkAboutEngineer's LetterJuly IL,2025 Inon+ OIJNTAIIV fll{c Ga rfield County Com mu n ity Development Department lohn Plano Chief Building Official 108 8th Street, Suite 401 Glenwood Springs, CO 81601 RE: Prefabricated Segundo Operator Houses Dear John, The Segundo lift, including its operator houses, was acquired from Arapahoe Basin Ski Area. Both operator houses are prefabricated and were built by a third party. They were originally purchased from Leitner-Poma and installed at Arapahoe Basin in 2001 for the Lenawee Lift. These prefabricated operator houses measure 7O'x12'and are intended to protect lift operators and the lift equipment from environmental hazards. At Sunlight, the enclosures will be tempered during lift operations but will not be continuously heated or inhabited. I have spoken with Glen Morgan, Summit County's Chief Building Official, regarding these structures and the historical county requirements. After discussions with Mr. Morgan and Rob Ware from Arapahoe Basin, it appears that neither of these were permitted through the county in 2001. Though they were not permitted, both structures have withstood the elements and performed well over the last twenty years at the Arapahoe Basin Resort. At Arapahoe Basin, the operator houses were previously installed at elevations of 11,440 feet and72,46O feet, respectively. These locations exposed the structures to more severe environmental conditions than the proposed Sunlight locations. Though the previous alpine conditions were more severe than Sunlight's, Summit County's wind and snow loading requirements are very similar to current Garfield County requirements. Currently, Summit County code requires a 100 psf snow load and a 115-mph ultimate wind load at both the bottom and top of the Lenawee Lift. Summit County's required wind speed in 2001, the time of installation, was 90 mph. Segundo's lower terminal is located at an elevation of 8,125 feet and is subject to Garfield County's 75 psf ground snow load requirement. The upper terminal, at 9,300 feet, is subject to a 100 psf snow load. Both locations fall under the county's standard L15-mph ultimate wind speed requirement. Leitner-Poma was able to locate some original documentation for the prefabricated enclosures (see attached). The walls are constructed of 212SW16 50 ksistuds at24" o.c. Based on steel (9701274-2343 . Jeff@lronMountainEng.com . P.O. Box 23L6, Glenwood Springs, CO 81502 stud loading tables, it appears this layout is designed to withstand 90-mph wind loading. The roof joists are 4" steel studs (4SW16 50ksi) @ 24" o.c. iustin Gross, Leitner-Poma engineer, noted there was a hand calculation in their originalfile denotingaT5 psf snow load. I have not independently confirmed this loading is acceptable, but it is likely the defined snow load for the structures based on file notes. While the wind load on both terminals and the design snow load at the upper terminal is below current Garfield County Standards, the structures have a twenty-year performance history under what I believe to be more demanding snow and wind loads. We are requesting a variance for these structures given their proven track record, the fact they will be uninhabited structures and will be installed in less severe environmental conditions. Feel free to give me a call if you'd like to discuss further Sincerely, Jeff Peterson, P.E. lron Mountain Engineering, lnc (9701 274-2343 . Jeff@lronMountainEns.com . P.O. Box 23L6, Glenwood Springs, CO 81602