Loading...
HomeMy WebLinkAboutApplicationGarfield Counfi Commr-ar"."::.i.trrlrti JtlN 7 il ?ffiFn*ood sPrings' co 8x601 (970) e4s-8212{ .. ;i:]..i i i..i-J$iitiiii}iarfieldcountvco.sov i.. i:i*i,, i i il i I \' tll'1vl::-ffi 1 6-2\ BUILDING PERMIT F PPLICATION WPEOF Commercial/Mu lti-Family Demolition Manufactured Home or Tiny Home (Single or Multi-Level) I Residential (SF, Duplex or Townhome)Reroof Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,200 SQUARE FEET 402 6579393 EmallAddress:timbanghart@gmail.com 41 Spring View Dr Glenwood Springs, CO 8'1601 Timothy Banghart PhonerProperty Owner: Maillng Address: Boulder Construction Services, LLCContractor:Phone: Mailing Address:622Lariat Loop New Castle, CO 81647 EmailAddress . matt.jurmu@bouldercs.com (970 f562676 2741344Phone: 233 Elk Valley Lane New Castle, CO 81647 970Archltect:Modfin Design EmallAddress:hannawit@outlook.com Maillng Address: Ernest Kollar Engineers Phone: (970 ) 320 Main St #203 Carbondale, CO 81623 9633223 EmailAddress:erniekollar@gmail.com Mailing Address: Englneer: Manufactured Home lnstaller: Phone: Mailing Address: EmallAddress: l( PROJECI DETAIIS TBD Lot 21 Mountain Springs Ranch Glenwood Springs, CO 21 85293001 09Assessor's Parcel Number: 22',6" Descrlbe Work:New single family horne with attached garages llab Job Address: Sub.Mountain Springs Ranch 1 AAar^y'-'l"r\ QA , 890,000.00 Height: Owner's Valuatlon of Work: Sq. Ft. of Building:5402 # of Floors tot 21 Block Property size (sq. Ft. or Acres): 35 acres {itionNewRemodeUAlterationClass of Work: {DetachedGarage:Attached PROJECT DETAITS CONTINUED Septic: Type of Heat:Natural Gas Driveway mpt (*fr^d Propane Community Electric Other Permit #: ---Permit: NOTICE AuthoriW. This application for a Building Permit must or an authorized agent. lf the signature below is not t the Owner, must be provided with this Application, be signed by the Owner ofthe property, described above, hat of the Owner, a separate letter of authority, signed by Legal Accgss, A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit, Void permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of L80 days after commencement. CERTIFICATION f neiebyceitityttraithavereadtfiisApplicationanOif'jiitreinfoimationcontainedaboveistrueandcorrect. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy, Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state, or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)), All County development requiring a permit, except for residential uses, are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure{s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work' I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from; (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2J'stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder, I hereby acknowledge that I have read and understand the Notice a nd Certification above, as well as, have provided ired lon which is correct and accurate to the best 2t erty Print and Date b[u OFFICIAL USE ONtY t'beF r/d/GSpecial Conditions: seE Manu. Home Fee:@ BP No: At o E-qEg OWTS No:+mqgq ary Paid: Pe BalanceTotal()f Loc 75" a5 H'ifra-lconst. ryeei ROP|#^tD ReOCC Group: A0ir#1 7--ilpAs BUITDING / PTANNING DIVISTON : (t DateSigned Gurfteld CounQ BUILDING DEPARTMENT 1OB Eighth Street, Suite 401, Glenwood Springs, CO 81601 Tel: (970) 945-8272 PLAN RE VIEW CHECKLIST 6tRE-0b2,t-re/6Permit No: Building lssues Pf anning lTonine lssues PU rade/ Topography 30% - Attach Residential Plan Review List Subdivision Plat Notes - Fire Department Review Red Line Plans/ Stamps/ Sticker ttach Conditions b*2/ perty Line Setbacks 35 ft. Stream Setbacks Flood Plain Building Height t--'-'r'rOn ng Sign-Off Road lmpact Fees Grade/ TopographY 40% /Plann ing lssues Subdivision Plat Description & Summarv: trLS e75g y /o/,re=27?t 21/.85 cnu/ 02753 X 44 66t 072 n a*t 34r.40t'1 x 32 6{7a8 //Eneineered Foundationjt<*rrolsaHtZ lb* Drivewfy Permit */ Surveyed Site Plan ffi",?Fmbbe-EntI d- .. -/ (rrecrtft're r --<nX,#"r?^ppricatio NA 4o# snowtoad Letter -Manuf.Homes T/',( /?5 y 24 q.f// 8e7 x /g Parcel/Schedule No #r690 /4r986 Soils Report q//2tod/t//H/zj' t/ n/ra/h;z-n"; 4/?,077, as ENERGY COMPLIANCE SHEET REQUIREMENTS: Effective June 30, 2023 Please provide details showing how building complies / meets Garfield County's adopted 2018|ECC and 9!!g]!g...!g...!. Depict and show outline the structure's building thermal envelope. Outline should clearly show portions of tne building to be conditioned inside the envelope (and label or otherwise identify any areas remaining unconditioned outside this envelope) Energy Compliance Plan should further include: Chosen Energy Compliance Patho Prescriptive: Cross Sections of insulated assemblies including the selected material I R-Value and U-Values to comply with IRC Table R402'1'2 o U-Factor Alternative: Provide a ResCheck Report o Total U-Factor Alternative: Provide software generated submittal design reports and inspection checklist for any RESNET ERI index or other performance path designs Air sealing details around openings, pipes, penetrations, joints Fenestration U-factors Provide mechanical system design details including proposed efficiency rates, types of equipment, fuel types, locations Energy efficient lighting specifications - 90% to be high-efficacy (LED complies) tvtanuit J Report required for new building structures and new equipment installations. STRUCTURAL PLANS: Please provide the following information on the structural plans. o 9OILS REPORT - lf the project is located in a subdivision with a final plat requiring site specific soils 'tnvestigation report or if Structural plans make a specific reference to a soils report, then a copy of the soils report is required to submit a building permit application, . Design specifications to include roof and deck snow load, wind and seismic design and frost dePth.r Foundation plan showing complete footing and foundation dimensions. r Footing and foundation details specifying reinforcement and referenced on plans. r Framing plans for each floor level and roof, All beams, columns, joists, rafters and trusses specified. Pre-manufactured struetures require the engineers stamp, signature and date, o Framing /connection details, braced wall lines, shear wall schedule, location and hold downs, NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Officialthat additional information is necessary to review the application and/or ptans for compliance, the application may be placed on hold untilthe required information is provided. Work may not proceed without the issuance of a permit' The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO wil[be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans,) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. Owner Print:Mathew Jurmu $ign: Mathew Jurmu Date:6.11_2025