HomeMy WebLinkAboutFire Suppression Documentation_Contractor's Material and Test Cert for UG Piping 304 Center Dr 3.11.25Contractor's Material and Test Certificate for Underground Piping PROCEDURE Upon completion of work, inspection and tests shall be made by the contractors representative and witnessed by an owner's representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the owner's representatives signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or focal ordinances. Property name p ( O 1 G fate : Property address Accepted by approving authorities (names) Address vl In G 3�y J)tll-fG CO 0 1 Plans Installation conforms to accepted plans Yes No ' iJ No Equipment used is approved Yes If no, state deviations Has person in charge of fire equipment been instructed as to location of Yes No i control valves and care and maintenance of this new equipment? 1 I If no, explain Instructions Have copies of appropriate instructions and care and maintenance Yes J„J No I charts been left on premises? iif no, explain Location Supplies buildings i Pipe types and class C TYPe joint Cart a� 14c 1�JIn1} s _ Pipe conforms to Nff7�--�_ standard Yes iJ No Underground Fittings conform to standard Yes � No pipes and joints If no, explain Joints needing ancho g aed, strapped, or blocked in Yes J No accordance with 'L�-- standard If no, explain i Flushing: Flow the required rate until water is clear as indicated by no collection of foreign material in burlap bags at outlets such as hydrants and blow -offs. Flush at flows not less than 390 gpm (1476 Umin) for 4 in. pipe, 880 gpm (3331 Umin) for 6 in, pipe,156o gpm (5905 Umin) for 8 in. pipe, 2440 gpm (9235 Umin) for 10 in. pipe, and 3520 gpm (13,323 Umin) for 12 in. pipe. When supply cannot f produce stipulated flow rates, obtain maximum available. Hydrostatic: All piping and attached appurtenances subjected to system working pressure shall be hydrostatically tested at 200 psi Test (13.8 bar) or 50 psi (3.5 bar) in excess of the system working pressure, whichever is greater, and shall maintain that pressure :h 5 psi description (0.35 bar) fort hours. Hydrostatic Testing_ Allowance- Where additional water is added to the system to maintain the test pressures required by 10.10.2.2.1, the amount of water shall be measured and shall not exceed the limits of the following equation (For metric equation, see 10.10.2.2.6). L = testing allowance (makeup water), in gallons per hour SDP I L _ S = length of pipe tested, in feet £ 148,000 D - nominal diameter of the pipe, in inches P = average test pressure during the hydrostatic test, in pounds per square inch (gauge) Natler round piping flushed according to Yes `� No —k�i M— , standard by (company) If no, explain How flushing flow was obtained _ Through what type opening Flushing Public water J Tank or reservoir Fire pump J Hydrant butt Open pipe tests V Lead-ins flushed according to-��'h-���Zy standard�by (company) IV Yes (-1 No If no, explain How flushing flow was obtained Through what type opening �_Q Public water Q Tank or reservoir 1, Fire pump ,_ J Y connection to flange y1Z� Open pipe O 2009 National Fire Pto'lection Association . and spigot i�t NFPA 24 (p.1 of 2) FIGURI? 10.10.1 Satttl>le of Contractor's Material and Test Certificate for- Vvidergrotutd Piping. All new un arground piping hydrostatically tested at ,hints covered Hydrostatic task --� — pal for —hours ' Yes Q No Total amount of leakage measured l __.�� gallons tours .Leakage test- allowable leakage gallons hours Number installed Type and make Ail operate satisfactorily Hydrants yes No Water control valves left wide open jj { If no, state reason t' (1fK in 4 nog f yes No Control valves Hose threads of fire department connections and hydrants interchangeable with yes ' NO those of fire department ansooring alarm Date left in service Remarks Naive of Installing contractor ► . Tests witnessed by Signatures por pro rly ow r (signed) Title lr�i auto �✓ Cate 3 "t F insiatiing nRractor (signed) This Date Additional explanation and notes 2009L National fire Protection Assostaflori NFPA 24 (p, 2 of 2),