Loading...
HomeMy WebLinkAboutGS06693.001F-L1 Building C Completion of ServicesCTLITHOMPSON May 30, 2025 Andover Management Group 333 East Main Street, Suite 300 Louisville, KY 40202 Attention: Dan Kunau Subject: Completion of Services Glenwood Business Center, Building C 214 Center Drive Glenwood Springs, Colorado CTLIT Project No. GS06693.001 F CTLIThompson, Inc. (CTLIT) provided construction observation and materials testing services for Building C, within the Glenwood Business Center development located at 214 Center Drive in Glenwood Springs, Colorado. The scope of our services was set forth in our Proposal No. GS-24-0030-CM1. This completion of services letter encompasses all phases of inspections performed for the Building C envelope. Observation and Density Testing of Soils (Phase 345) CTLIT made 12 site visits between June 20, 2024 and August 6, 2024. During this time CTLIT performed 22 density tests and provided 10 density test reports and 1 field observation reports. Our observations and density test results indicate the soils were placed and compacted in general conformance with the project plans and specifications. Reinforcing Steel Observation (Phase 360) CTLIT made 6 site visits between August 9, 2024 and August 12, 2024. During this time CTLIT performed 2 reinforcing steel observations and provided 2 reinforcing steel observation reports. Our observations indicated the reinforcing steel was placed in general conformance with the project plans and specifications. Concrete Testing (Phase 365) CTLIT performed concrete testing between August 5, 2024 and August 17, 2024. During this period, CTLIT performed 7 concrete tests and provided 7 reports regarding compressive strength of concrete. Our observations and testing indicate that the concrete is in general conformance with the project plans and specifications. CTLIThompson, Inc. Denver, Fort Collins, Colorado Springs, Glenwood Springs, Pueblo, Summit County — Colorado Cheyenne, Wyoming and Bozeman, Montana Structural Steel Inspection (Phase 390) CTLIT performed structural steel field welding, high -strength bolting inspections and provided as -built measurements of structural steel between September 4, 2024 to March 3, 2025. During this period, CTLIT made 12 site visits and provided 5 structural steel/field welding - high -strength bolting reports and one letter regarding as -built measurements of structural steel. Based on our observations and test results, the welds, bolts, and steel framing were constructed in general conformance with project plans and specifications. Cold -Formed Metal Framing Observation (Phase 391) CTLIT performed observations of cold -formed metal framing on November 18, 2024. During this period, CTLIT made 1 site visit to observe cold -formed metal framing and provided 1 cold -formed metal framing observation report. Our observations indicate the cold -formed metal framing was erected in general conformance with the project plans and specifications. Our observations and test results indicate that Building C, within the Glenwood Business Center was constructed in general conformance with project plans and specifications. Please contact us if you have questions or need additional information. CTLITHOMPSON, INC. Reviewed by: Thomas D. Downing Ry R. Barbone, P.E. Lab & Field Manager Division Manager tdowninq(actlthompson.com rbarbone(a.ctlthompson.com CARBONDALE AND RURAL FIRE PROTECTION DISTRICT STATION #81 ADDITIONS CTLIT PROJECT NO. GS06660.001F-L1 Page 2 of 2