HomeMy WebLinkAboutField Observation 1Activity Date:06/03/2024 Technician:Downing, Thomas
Placement Location:Building 3 envelope Plans/Details:
CTL|T Report GS06693.000125, dated August 22, 2022.
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, Cain with CW Construction requested CTL|T observe the soils exposed after stripping of vegetation in the
Building 3 envelope. We noted substantial roots visible in the current subgrade elevation and recommended an additional 4"6
inches be removed for the building envelope prior to subgrade preparation and fill placement.
Images:
✔
✔
Field Observation Report FOR000001Report #:
06/03/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1
Activity Date:06/14/2024 Technician:Downing, Thomas
Placement Location:
Structural fill placement, site retaining wall, building A
Plans/Details:
CTL Thompson Geotechnical report GS06693.000125, dated
August 22, 2022
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe placement of structural fill in site retaining wall excavation. The earthwork
contractor is placing an imported fill material consisting of silty sand with gravel and cobbles that has been processed to a 4
inch minus. The material is being placed and moisture conditioned with a loader and skidsteer in 8" loose lifts. Compactive
effort was applied with a a large steeldrum vibratory compactor. We judge the compacted structural fill as acceptable for a
bearing pressure of 3000 psi
✔
✔
Field Observation Report FOR000002Report #:
06/14/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 4Page 1 of 3
Activity Date:06/14/2024 Technician:Downing, ThomasPlacement Location:Structural fill placement, site retaining wall, building A Plans/Details:CTL Thompson Geotechnical report GS06693.000125, datedAugust 22, 2022Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe placement of structural fill in site retaining wall excavation. The earthwork
contractor is placing an imported fill material consisting of silty sand with gravel and cobbles that has been processed to a 4
inch minus. The material is being placed and moisture conditioned with a loader and skidsteer in 8" loose lifts. Compactive
effort was applied with a a large steeldrum vibratory compactor. We judge the compacted structural fill as acceptable for a
bearing pressure of 3000 psi
Images:
Comments:West portion of retaining wall excavation Comments:
West portion of retaining wall excavation, looking north
✔
✔
Field Observation Report FOR000002Report #:
06/14/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 4Page 2 of 3
Activity Date:06/14/2024 Technician:Downing, ThomasPlacement Location:Structural fill placement, site retaining wall, building A Plans/Details:CTL Thompson Geotechnical report GS06693.000125, datedAugust 22, 2022Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes NoGeneral Remarks:As requested, a site visit was made to observe placement of structural fill in site retaining wall excavation. The earthworkcontractor is placing an imported fill material consisting of silty sand with gravel and cobbles that has been processed to a 4inch minus. The material is being placed and moisture conditioned with a loader and skidsteer in 8" loose lifts. Compactiveeffort was applied with a a large steeldrum vibratory compactor. We judge the compacted structural fill as acceptable for abearing pressure of 3000 psiImages:
Comments:West portion of retaining wall excavation Comments:
West portion of retaining wall excavation, looking north
Comments:
West portion of retaining wall excavation, looking south
✔✔
Field Observation Report FOR000002Report #:
06/14/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 3 of 4Page 3 of 3
Activity Date:06/17/2024 Technician:Downing, Thomas
Placement Location:
Structural fill placement, site retaining wall, building A
Plans/Details:
CTL Thompson Geotechnical report GS06693.000125, dated
August 22, 2022
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe ongoing placement of structural fill in site retaining wall excavation. The
earthwork contractor is placing an imported fill material consisting of silty sand with gravel and cobbles that has been
processed to a 4 inch minus. The material is being placed and moisture conditioned with a loader and skidsteer in 8" loose
lifts. Compactive effort was applied with a a large steeldrum vibratory compactor. We judge the compacted structural fill as
acceptable for a bearing pressure of 3000 psi.
✔
✔
Field Observation Report FOR000003Report #:
06/17/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 3Page 1 of 2
Activity Date:06/17/2024 Technician:Downing, ThomasPlacement Location:Structural fill placement, site retaining wall, building A Plans/Details:CTL Thompson Geotechnical report GS06693.000125, datedAugust 22, 2022Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe ongoing placement of structural fill in site retaining wall excavation. The
earthwork contractor is placing an imported fill material consisting of silty sand with gravel and cobbles that has been
processed to a 4 inch minus. The material is being placed and moisture conditioned with a loader and skidsteer in 8" loose
lifts. Compactive effort was applied with a a large steeldrum vibratory compactor. We judge the compacted structural fill as
acceptable for a bearing pressure of 3000 psi.
Images:
Comments:
North portion of retaining wall excavation, looking east
Comments:
North portion of retaining wall excavation, looking west
✔
✔
Field Observation Report FOR000003Report #:
06/17/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 3Page 2 of 2
Activity Date:06/24/2024 Technician:Downing, Thomas
Placement Location:
Structural fill placement, site retaining wall, building A, south and
east footings
Plans/Details:
CTL Thompson Geotechnical report GS06693.000125, dated
August 22, 2022
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe ongoing placement of structural fill in site retaining wall excavation. The
earthwork contractor is placing an imported fill material consisting of silty sand with gravel and cobbles that has been
processed to a 4 inch minus. The material is being placed and moisture conditioned with a loader and skidsteer in 8" loose
lifts. Compactive effort was applied with a a large steeldrum vibratory compactor. We judge the compacted structural fill as
acceptable for a bearing pressure of 3000 psi.
✔
✔
Field Observation Report FOR000004Report #:
06/24/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 4Page 1 of 3
Activity Date:06/24/2024 Technician:Downing, ThomasPlacement Location:Structural fill placement, site retaining wall, building A, south andeast footings Plans/Details:CTL Thompson Geotechnical report GS06693.000125, datedAugust 22, 2022Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe ongoing placement of structural fill in site retaining wall excavation. The
earthwork contractor is placing an imported fill material consisting of silty sand with gravel and cobbles that has been
processed to a 4 inch minus. The material is being placed and moisture conditioned with a loader and skidsteer in 8" loose
lifts. Compactive effort was applied with a a large steeldrum vibratory compactor. We judge the compacted structural fill as
acceptable for a bearing pressure of 3000 psi.
Images:
Comments:south half of retaining wall excavation, looking west Comments:south half of retaining wall excavation, looking east
✔
✔
Field Observation Report FOR000004Report #:
06/24/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 4Page 2 of 3
Activity Date:06/24/2024 Technician:Downing, ThomasPlacement Location:Structural fill placement, site retaining wall, building A, south andeast footings Plans/Details:CTL Thompson Geotechnical report GS06693.000125, datedAugust 22, 2022Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes NoGeneral Remarks:As requested, a site visit was made to observe ongoing placement of structural fill in site retaining wall excavation. Theearthwork contractor is placing an imported fill material consisting of silty sand with gravel and cobbles that has beenprocessed to a 4 inch minus. The material is being placed and moisture conditioned with a loader and skidsteer in 8" looselifts. Compactive effort was applied with a a large steeldrum vibratory compactor. We judge the compacted structural fill asacceptable for a bearing pressure of 3000 psi.Images:
Comments:south half of retaining wall excavation, looking west Comments:south half of retaining wall excavation, looking east
Comments:east half of retaining wall excavation, looking north
✔✔
Field Observation Report FOR000004Report #:
06/24/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 3 of 4Page 3 of 3
Activity Date:06/25/2024 Technician:Downing, Thomas
Placement Location:
Structural fill placement, site retaining wall, building A, south and
east footings
Plans/Details:
CTL Thompson Geotechnical report GS06693.000125, dated
August 22, 2022
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe completed placement of structural fill in site retaining wall excavation. The
earthwork contractor is placing an imported fill material consisting of silty sand with gravel and cobbles that has been
processed to a 4 inch minus. The material is being placed and moisture conditioned with a loader and skidsteer in 8" loose
lifts. Compactive effort was applied with a a large steeldrum vibratory compactor. We judge the compacted structural fill as
acceptable for a bearing pressure of 3000 psi.
✔
✔
Field Observation Report FOR000005Report #:
06/25/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 3Page 1 of 2
Activity Date:06/25/2024 Technician:Downing, ThomasPlacement Location:Structural fill placement, site retaining wall, building A, south andeast footings Plans/Details:CTL Thompson Geotechnical report GS06693.000125, datedAugust 22, 2022Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe completed placement of structural fill in site retaining wall excavation. The
earthwork contractor is placing an imported fill material consisting of silty sand with gravel and cobbles that has been
processed to a 4 inch minus. The material is being placed and moisture conditioned with a loader and skidsteer in 8" loose
lifts. Compactive effort was applied with a a large steeldrum vibratory compactor. We judge the compacted structural fill as
acceptable for a bearing pressure of 3000 psi.
Images:
Comments:east half of retaining wall excavation, looking north Comments:east half of retaining wall excavation, looking north
✔
✔
Field Observation Report FOR000005Report #:
06/25/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 3Page 2 of 2
Activity Date:08/05/2024 Technician:Peskuski, Ryan
Placement Location:Building A rough slab subgrade
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, we made a site visit to observe a proof roll of the imported subgrade materials under the slab of Building A. We
observed a fully loaded water truck drive over the area of observation. We did not observe any significant deflection or pumping
of the materials under load. Portions of the southeast corner were not ready for proof rolling. Our office should be notified
during fill placement of the unobserved area to approve means and methods or another proof roll should take place prior once
fill is in place and compacted.
Images:
Comments:Equipment used.Comments:
Area of observation looking from the southeast towards the
northwest.
✔
✔
Field Observation Report FOR000006Report #:
08/05/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 3Page 1 of 2
Activity Date:08/05/2024 Technician:Peskuski, RyanPlacement Location:Building A rough slab subgradeDiscrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes NoGeneral Remarks:As requested, we made a site visit to observe a proof roll of the imported subgrade materials under the slab of Building A. Weobserved a fully loaded water truck drive over the area of observation. We did not observe any significant deflection or pumpingof the materials under load. Portions of the southeast corner were not ready for proof rolling. Our office should be notifiedduring fill placement of the unobserved area to approve means and methods or another proof roll should take place prior oncefill is in place and compacted.Images:
Comments:Equipment used.Comments:
Area of observation looking from the southeast towards the
northwest.
Comments:
Area of observation looking from the southwest towards the
northeast.
Comments:Area not accessible for proof roll.
✔✔
Field Observation Report FOR000006Report #:
08/05/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 3Page 2 of 2
Activity Date:10/23/2024 Technician:Barbone, Ryan
Placement Location:
Proofroll Observation STA 1+00 to 4+50 on Chaparral Dr. and
5+00 to 8+48 on Center Dr.
Plans/Details:
Sopris Engineering, LLC (dated March 1, 2024) Sheet C2.0
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
Discrepancy Remarks:
Soft and deflecting areas of subgrade were encountered around manhole and inlet structures as well as beyond STA 4+50 on
Chaparral Dr.
General Remarks:
As requested, a site visit was made to observe a proofroll of the prepared subgrade soils along Chaparral Dr. and Center Dr.
We observed the contractor perform a proofroll of the subgrade soils with a fullyloaded water truck. The subgrade soils in the
main roadway areas appeared to be placed and compacted in accordance with the project specifications. Soft and deflecting
soils were encountered around manholes and inlets. We recommended that the soft and deflecting soils be moisture
conditioned, reprocessed, and compacted. Our office should be contacted to provide recommendations to stabilize the
subgrade soils, if needed. The contractor was notified of our observations and recommendations. Our office will be contacted
when a return visit is required.
Images:
Comments:Looking south along Chaparral Drive.Comments:
Soft and deflecting soils encountered near an inlet on Chaparral
Drive.
✔
✔
Field Observation Report FOR000007Report #:
10/23/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1
Activity Date:10/24/2024 Technician:Barbone, Ryan
Placement Location:
Proofroll Observation STA 5+00 to 8+48 on Center Drive and the
access drive along the west, south, and east sides of Building C.
Plans/Details:
Sopris Engineering, LLC (Dated March 1, 2024) Sheet C2.0
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
Discrepancy Remarks:
Soft and deflecting soils encountered around manholes and inlets as well as at the southeast corner of the access dive
around Building C.
General Remarks:
As requested, a site visit was made to observe a proofroll of the prepared subgrade soils around Building C. We observed the
contractor perform a proofroll with a fullyloaded water truck on the access drive around Building C. We observed areas of soft
and deflecting soils around manholes and inlets as well as at the southeast corner of the drive around Building C. We
recommended that the subgrade soils be removed, moisture conditioned, processed, and recompacted. Our office should be
contacted if additional recommendations to stabilize the subgrade soils are needed. The contractor was notified of our
observations and recommendations. Our office will be contacted to schedule a return visit.
Images:
Comments:
Soft and deflecting soils encountered near inlets at the northeast
corner of Building C.
Comments:
Looking west along Chaparral Dr. north of Building C.
✔
✔
Field Observation Report FOR000008Report #:
10/24/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1
Activity Date:10/25/2024 Technician:Downing, Thomas
Placement Location:
Proofroll observation STA 5+00 to 8+48 on Center Drive and the
access drive along the west, south, and east sides of Building C.
Plans/Details:
Sopris Engineering, LLC (Dated March 1, 2024) Sheet C2.0
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe a proofroll of the prepared subgrade soils around Building C. We observed the
contractor perform a proofroll with a fullyloaded water truck on the access drive around Building C, in the areas that deflection
was previously observed around storm inlets and the manhole structure adjacent to the southeast side of Building C. These
areas had been reworked yesterday. No significant deflection of the subgrade was noted in these areas. The contractor was
notified of our observations and recommendations. Additional site visits will be scheduled with our office when necessary.
✔
✔
Field Observation Report FOR000009Report #:
10/25/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 3Page 1 of 2
Activity Date:10/25/2024 Technician:Downing, ThomasPlacement Location:Proofroll observation STA 5+00 to 8+48 on Center Drive and theaccess drive along the west, south, and east sides of Building C.Plans/Details:Sopris Engineering, LLC (Dated March 1, 2024) Sheet C2.0Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe a proofroll of the prepared subgrade soils around Building C. We observed the
contractor perform a proofroll with a fullyloaded water truck on the access drive around Building C, in the areas that deflection
was previously observed around storm inlets and the manhole structure adjacent to the southeast side of Building C. These
areas had been reworked yesterday. No significant deflection of the subgrade was noted in these areas. The contractor was
notified of our observations and recommendations. Additional site visits will be scheduled with our office when necessary.
Images:
Comments:
Looking south toward area of proof roll observation near
manhole structure on southeast side of Building C
✔
✔
Field Observation Report FOR000009Report #:
10/25/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 3Page 2 of 2
Activity Date:02/25/2025 Technician:Peskuski, Ryan
Placement Location:Sidewalk to the north of Building A
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
Discrepancy Remarks:
As requested, a site visit was made to perform density testing of the sidewalk subgrade to the north of Building A. Upon arrival
onsite, we observed areas that were saturated and unstable. We recommended to scarify the material and allow to dry before
recompacting. Observations and recommendations were relayed to the contractor while onsite. Our office will be notified when
additional testing is required.
Images:
✔
✔
Field Observation Report FOR000010Report #:
02/25/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1
Activity Date:02/26/2025 Technician:Peskuski, Ryan
Placement Location:Sidewalk to the north of Building A
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
Discrepancy Remarks:
As requested, a site visit was made to observe a proof roll of the sidewalk subgrade material. We observed a wheeled skid
steer drive over the sidewalk sub grade. Significant deflection/pumping of the materials was observed. Our recommendations
is to remove Class 6 and expose the underlying previously placed material. The underlying materials should be observed by
our office before replacement of Class 6 material. Contractor was notified of our observations. Our office will be contacted
when our services are needed again.
Images:
✔
✔
Field Observation Report FOR000011Report #:
02/26/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1
Activity Date:02/27/2025 Technician:Peskuski, Ryan
Placement Location:Sidewalk to the north of Building A
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
Discrepancy Remarks:
As requested, a site visit was made to observe the condition of the previously placed fill material under the sidewalk to the
north of Building A. We observed the Class 6 material had been removed exposing the underlying fill. This fill was observed to
be saturated and was pumping/deflecting under foot pressure. Our recommendation is to let the area dry out before
proceeding with work. If this is not feasible, our office should be consulted for other recommendations.
Images:
✔
✔
Field Observation Report FOR000012Report #:
02/27/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1
Activity Date:03/11/2025 Technician:Downing, Thomas
Placement Location:
Proof Roll, drive/sidewalk subgrade, south side of Building "A"
Plans/Details:
Sopris Engineering, Job No. 30017, dated March 1, 2024.
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
Discrepancy Remarks:
Soft, deflecting areas over utility trenches at southeast side of building A and soft, deflecting area a southwest corner, heading
east to be scarified and recompacted. Saturated material in these areas should be removed and replaced with properly
moisture conditioned material and recompacted.
General Remarks:
As requested, a proof roll was observed along the south side of Building "A", from the southeast corner of the building to the
southwest corner. Areas of soft, deflecting soils were encountered at the water line and storm sewer line on the east side of the
building. An additional soft, deflecting area was encountered on the southwest side of the building, from the southwest corner,
heading east to approximately 13 line, approximately 10’ wide. We recommended that this area be scarified down one foot and
allowed to air dry before being recompacted. The general contractor was notified of our observations and requested a proof roll
be scheduled for tomorrow morning, Wednesday March 12, 2025. We will return as requested for a proof roll at the scheduled
time.
✔
✔
Field Observation Report FOR000013Report #:
03/11/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 3Page 1 of 2
Activity Date:03/11/2025 Technician:Downing, ThomasPlacement Location:Proof Roll, drive/sidewalk subgrade, south side of Building "A"Plans/Details:Sopris Engineering, Job No. 30017, dated March 1, 2024.Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes NoDiscrepancy Remarks:Soft, deflecting areas over utility trenches at southeast side of building A and soft, deflecting area a southwest corner, heading
east to be scarified and recompacted. Saturated material in these areas should be removed and replaced with properly
moisture conditioned material and recompacted.
General Remarks:
As requested, a proof roll was observed along the south side of Building "A", from the southeast corner of the building to the
southwest corner. Areas of soft, deflecting soils were encountered at the water line and storm sewer line on the east side of the
building. An additional soft, deflecting area was encountered on the southwest side of the building, from the southwest corner,
heading east to approximately 13 line, approximately 10’ wide. We recommended that this area be scarified down one foot and
allowed to air dry before being recompacted. The general contractor was notified of our observations and requested a proof roll
be scheduled for tomorrow morning, Wednesday March 12, 2025. We will return as requested for a proof roll at the scheduled
time.
Images:
Comments:
Subject area, looking west toward southwest corner of Building A
✔✔
Field Observation Report FOR000013Report #:
03/11/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 3Page 2 of 2
Activity Date:03/12/2025 Technician:Downing, Thomas
Placement Location:
Proof Roll, drive/sidewalk subgrade, south side of Building "A",
between 3 and 13 lines
Plans/Details:
Sopris Engineering, Job No. 30017, dated March 1, 2024.
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a proof roll was observed along the south side of Building "A", from the 3 lines to 13 line, approximately 10 feet
from the building to the south. The area of soft, deflecting soils encountered in this area yesterday had been scarified and
allowed to air dry overnight. The area had been recompacted prior to our arrival onsite. Little to no deflection of the subgrade
was noted during this morning’s proof roll. We judge the area on the south side of Building “A”, from 3 line to 29 line as
acceptable for placement and compaction of required thickness of aggregate base course to achieve proposed sidewalk
subgrade in this area. The general contractor was notified of our observations while onsite. Additional site visits will be
scheduled with our office when required.
✔
✔
Field Observation Report FOR000014Report #:
03/12/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 3Page 1 of 2
Activity Date:03/12/2025 Technician:Downing, ThomasPlacement Location:Proof Roll, drive/sidewalk subgrade, south side of Building "A",between 3 and 13 lines Plans/Details:Sopris Engineering, Job No. 30017, dated March 1, 2024.Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:
Yes No
General Remarks:
As requested, a proof roll was observed along the south side of Building "A", from the 3 lines to 13 line, approximately 10 feet
from the building to the south. The area of soft, deflecting soils encountered in this area yesterday had been scarified and
allowed to air dry overnight. The area had been recompacted prior to our arrival onsite. Little to no deflection of the subgrade
was noted during this morning’s proof roll. We judge the area on the south side of Building “A”, from 3 line to 29 line as
acceptable for placement and compaction of required thickness of aggregate base course to achieve proposed sidewalk
subgrade in this area. The general contractor was notified of our observations while onsite. Additional site visits will be
scheduled with our office when required.
Images:
Comments:
Subject area, looking west toward southwest corner of Building A
✔
✔Field Observation Report FOR000014Report #:
03/12/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 3Page 2 of 2
Activity Date:03/12/2025 Technician:Downing, Thomas
Placement Location:
Proof Roll, drive/curb subgrade, west side of Building "A"
Plans/Details:
Sopris Engineering, Job No. 30017, dated March 1, 2024.
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
Discrepancy Remarks:
Soft, deflecting subgrade was observed along the curb line on west side of building. Contractor to scarify this area and allow
soils to air dry before recompacting.
General Remarks:
As requested, a proof roll was observed along the west side of Building "A", in the curb and gutter and drive area. An area of
soft, deflecting soils was encountered along the west curb line during today’s proof roll. The main drive in this area was
acceptable. We recommended the curb subgrade be scarified and allowed to air dry. Earthwork contractor indicated they would
scarify this area as recommended. The general contractor was notified of our observations while onsite. A return visit was
scheduled for additional proof roll observations in this area for tomorrow, Thursday March 13, 2025.
✔
✔
Field Observation Report FOR000015Report #:
03/12/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 3Page 1 of 2
Activity Date:03/12/2025 Technician:Downing, ThomasPlacement Location:Proof Roll, drive/curb subgrade, west side of Building "A"Plans/Details:Sopris Engineering, Job No. 30017, dated March 1, 2024.Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes No
Discrepancy Remarks:
Soft, deflecting subgrade was observed along the curb line on west side of building. Contractor to scarify this area and allow
soils to air dry before recompacting.
General Remarks:
As requested, a proof roll was observed along the west side of Building "A", in the curb and gutter and drive area. An area of
soft, deflecting soils was encountered along the west curb line during today’s proof roll. The main drive in this area was
acceptable. We recommended the curb subgrade be scarified and allowed to air dry. Earthwork contractor indicated they would
scarify this area as recommended. The general contractor was notified of our observations while onsite. A return visit was
scheduled for additional proof roll observations in this area for tomorrow, Thursday March 13, 2025.
Images:
Comments:
Subject area, looking north toward northwest corner of property
Comments:soft, deflecting soils along west curb line
✔✔
Field Observation Report FOR000015Report #:
03/12/2024
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 3Page 2 of 2
Activity Date:03/24/2025 Technician:Thibault, Sandon
Placement Location:Subgrade west of Building A, curb and gutter
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, we observed a proofroll of the curb and gutter subgrade west of Building A. The subgrade west of Building A was
proofrolled with a loaded water truck. Proofroll was considered acceptable. Our office will be contacted when additional
inspections are needed.
Images:
Comments:Subgrade west side of Building A.
✔
✔
Field Observation Report FOR000016Report #:
03/24/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1
Activity Date:03/26/2025 Technician:Thibault, Sandon
Placement Location:South Side of Building A, parking lot area.
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
This area was proofrolled yesterday 3252025, with unsatisfactory results. The contractor decided to subexcavate 12inches
and replace with suitable materials to ensure stability. At this site visit, it was suggested to the contractor to proofroll the
resulting subexcavation to determine stability prior to importing suitable material.
Images:
Comments:
Looking east along south side of Building A parking area.
Comments:Looking east of Building A parking area.
✔
✔
Field Observation Report FOR000017Report #:
03/26/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 3Page 1 of 2
Activity Date:03/26/2025 Technician:Thibault, SandonPlacement Location:South Side of Building A, parking lot area.Discrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes NoDiscrepancy:Yes NoGeneral Remarks:This area was proofrolled yesterday 3252025, with unsatisfactory results. The contractor decided to subexcavate 12inchesand replace with suitable materials to ensure stability. At this site visit, it was suggested to the contractor to proofroll theresulting subexcavation to determine stability prior to importing suitable material.Images:
Comments:
Looking east along south side of Building A parking area.
Comments:Looking east of Building A parking area.
Comments:Looking east of Building A parking area.
✔✔
Field Observation Report FOR000017Report #:
03/26/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 3Page 2 of 2
Activity Date:03/26/2025 Technician:Thibault, Sandon
Placement Location:
Building A. Parking area. South side of roadway.
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a second site visit was made to observe the proofroll of the red silty rock fill place in the subexcavation in the
parking area south of Building A. Four small areas were removed and replaced with a dryer fill material, recompacted and
reproofrolled with satisfactory results. A site visit was scheduled for tomorrow morning for density testing on the base course
placed below the curb and gutter only.
Images:
Comments:Proofrolling the parking area south of Building A
✔
✔
Field Observation Report FOR000018Report #:
03/26/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1
Activity Date:03/27/2025 Technician:Cozza, Seth
Placement Location:East side of Building A
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
Discrepancy Remarks:
As requested, a site visit was made to the east side of Building A to observe a proofroll. We observed a water truck drive over
the area of observation, we identified multiple areas with significant pumping of the material under load recommended fixing
areas prior to base placement. Contractor was notified onsite, our office will be notified when more observations are needed.
Images:
Comments:Basic overview of site
✔
✔
Field Observation Report FOR000019Report #:
03/27/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1
Activity Date:03/28/2025 Technician:Cozza, Seth
Placement Location:East of Building A proof roll
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
Discrepancy Remarks:
As requested, a site visit was made to observe a proof roll on the east side of Building A. A full water truck was driven back and
fourth across the material and we observed movement in the bottom section of material starting at the southeast corner of the
building heading north 50ft on either side of the road. We recommended reworking the bottom portion, due to temporary power
lane incomplete grading this area was not ready for proof rolling. The upper portion of the road was deemed satisfactory.
Another site visit will take place when our office is notified. Weather pending.
✔
✔
Field Observation Report FOR000020Report #:
03/28/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 3Page 1 of 2
Activity Date:03/28/2025 Technician:Cozza, SethPlacement Location:East of Building A proof rollDiscrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes No
Discrepancy:
Yes No
Discrepancy Remarks:
As requested, a site visit was made to observe a proof roll on the east side of Building A. A full water truck was driven back and
fourth across the material and we observed movement in the bottom section of material starting at the southeast corner of the
building heading north 50ft on either side of the road. We recommended reworking the bottom portion, due to temporary power
lane incomplete grading this area was not ready for proof rolling. The upper portion of the road was deemed satisfactory.
Another site visit will take place when our office is notified. Weather pending.
Images:
✔
✔
Field Observation Report FOR000020Report #:
03/28/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 3Page 2 of 2
Activity Date:03/31/2025 Technician:Peskuski, Ryan
Placement Location:East side of Building A.
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe a proof roll of the subgrade below the road on the east side of Building A. We
observed a fully loaded water truck roll over the area that had previously failed. We did not observe any significant pumping or
deflection of the material under load. Our observations indicated that the subgrade was sufficiently compacted and ready for
ABC to be applied overtop.
Images:
Comments:Equipment used.Comments:Area of observation.
✔
✔
Field Observation Report FOR000021Report #:
03/31/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1
Activity Date:04/08/2025 Technician:Downing, Thomas
Placement Location:
Proof roll observation, north half of entrance to Building A, at
intersection of Center Drive and Building A access drive
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe a proof roll at red top elevation for the north half of the driveway for Building A
adjacent to Center Drive. A loaded tandem axle water truck was utilized for the proof roll. The north half of the intersection, from
approximately 5’ north of the 01EX storm inlet is acceptable. Significant deflection of the subgrade around storm inlet 01EX
was observed, as well as deflection of the irrigation trench running across the intersection. We recommended these areas be
reworked to a depth of 18”24”. The general contractor was notified of our observations. Additional site visits will be scheduled
when required.
✔
✔
Field Observation Report FOR000022Report #:
04/08/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 3Page 1 of 2
Activity Date:04/08/2025 Technician:Downing, ThomasPlacement Location:Proof roll observation, north half of entrance to Building A, atintersection of Center Drive and Building A access driveDiscrepancy:The items observed were found to be in general conformance with the approved drawings and standard constructionpractice:Yes No
Discrepancy:
Yes No
General Remarks:
As requested, a site visit was made to observe a proof roll at red top elevation for the north half of the driveway for Building A
adjacent to Center Drive. A loaded tandem axle water truck was utilized for the proof roll. The north half of the intersection, from
approximately 5’ north of the 01EX storm inlet is acceptable. Significant deflection of the subgrade around storm inlet 01EX
was observed, as well as deflection of the irrigation trench running across the intersection. We recommended these areas be
reworked to a depth of 18”24”. The general contractor was notified of our observations. Additional site visits will be scheduled
when required.
Images:
Comments:area of observation Comments:proof roll in progress
✔
✔Field Observation Report FOR000022Report #:
04/08/2025
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Andover Management Group
333 East main Street
Suite 300
Louisville, KY 40202
Project:
GS06693.001F345
214 Center Drive
214 Center Drive
Garfield County, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 2 of 3Page 2 of 2