Loading...
HomeMy WebLinkAboutSurvey As-Built Letter 11.11.2024Lot 5 St. Finnbar Subdivision - Sopris Engineering Survey As-Built SE Job #33155.0L November IL,2024 Page 1 Maley Building Corporation 33 St. Finnbar Farms Rd. Carbondale, CO 8L623 Email: RE: Lot 5 St. Finnbar Subdivision - Survey As-Built (SE Job #33155.01) Dear Patrick, Utilizing the Site Benchmark at the elevation of 6256.73', as shown on the True North survey (project number of 2O2O-417 and dated November 25, 2O2O) and as part of the building permit #BLRE-12-2L-7260; the barn roof mid-point from the roof ridge to the bottom of the roof eave was field measured at an elevation of 6284.7!' on September t2,2024. Sincerely, SOPRIS ENGINEERING, LLC Darin "Rabbit" Alfstad Survey Crew Supervisor 502lVain Strr:ei {ltiite /t3 Carlrortdale CO 8'16211 970-704.{l-?11