HomeMy WebLinkAboutGould Construction Correspondence 07.28.2025MMME WG, LLC Gould Construction, Inc P.O. Box 130 Glenwood Springs, CO 81602 970-379-8326 markj r@gouldconstruction. com July 28,2025 John Plano Chief Buitding Officiat Garfietd County Buitding Department 108 8th Street #401 Gtenwood Springs, CO 81601 (970) 945-1 377 Ext. 1560 Subjectl Grading Permit Application - Response to Request for Revisions 49893 Hwy 6 &,24, Glenwood Springs, CO 81601 Parcel: 218301100071 To Whom It May Concern, Thank you for your review of ourpreliminary drawings and for providing the proposed conditions and requirements related to the relocation of stockpiles on the project site. We acknowledge your conrments and submit this letter along with the following updated and required materials: Submitted Documents: . Completed Major Grading Permit Application (attached) . Revised site dtawing including: o Labeling and location of existing stockpiles to be relocated o No additional material will be introduced to the site until a Building Permit is issued o All machinery currently stored on-site will be removed to bring the property into compliance and prevent use as a Contractor's Yard with the exception of the water tower, water truck, and we need a loader and or grader there in the winterfor snowptowing from amies acres to the outside storage and to the residence. o Protective measures will be added for retention ponds to prcvent impact from stored fill. Acknowledgment of Grading Permit Conditions: We understand and accept the following conditions associated with the issuance of the Grading Permit: 1. The permit authorizes only the relocation of existing on-site stockpiles, as part of the approvcd Land Usc lcnnit, The fill dirt on the East end will be compacted and bermed to insure additional debris flow capacity while the site is idle. 2. The grading work will be completed within 30 days of the permit issuance. 3. No further material processing will occur on the site until the appropriate permits are secured, 4, The current water tank location is acceptable for dust mitigation purposes. 5, A Letter of Acceptance/Compliance from the Civil Engineer of Record will be submitted with the Building Permit application, confrrmingthat infrastructure, compaction, and dlainage havc beeu installed in acoordance with the appruvetl engineered plans. We understand that final grading will be completed following the construction of the storage units. The drainage required for the actual mini storage buildings has not been completed. There are three culverts that have been installed from the detention basins for the site drainage as engineercd. There is still grading and additional debris control measures that will need to be installed prior to CO. We need to be able to maintain the four drainage basins as required. 6, Dust mitigation measures will be implemented during and after stockpile relocation. 7. We will call for inspection upon completion of the relocation. Please review the enclosed materials and let us know if any further revisions or clarifications are needed. We ate conllllitted to adheriug to all requirements and ensuring that the work ls completed in accordance with local codes and standards. Thank you for your assistance and support on this project. Very Truly Yours, Mark Gould, Jr