HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-06 -25-9330
VANTAGE AVIATION HANGER LOT 45-6
NEW HANGER WITH DEICING OPERATION
GARFI ELD COU NTY AI RPORT
375 COUNTY ROAD 352
1) THE APPROVED PLANS ARE TO BE ON-SITE FOR INSPECTIONS.
2) SANTTARY FACTLTTTES ARE REOUIRED TO BE PROVIDED FOR WORKERS.
3) A LIST OF REOUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE
IS TO PERMIT AND APPROVE THE ELECTRICAL WORK.
HTTPS ://WWW.CO LO RADO.G OV/PACI Fl C/DORA/D PO ELECTRI CAL P LU M B I NG PE
RMITS
4) UNDERGROUND UTtLrTy LOCATES tS THE RESPONSIBTLTry OF THE OWNER OR
CONTRACTOR. 811 IS THE COLORADO UTILIry LOCATE HOT LINE.
5) ALL BACKFLOW PREVENTERS ARE REQUIRED TO BE TESTED AND CERTIFIED BY A
LICENSED BACKFLOW SPECIALIST AFTER INSTALLATION AND PRIOR TO ISSUANCE
OF THE CERTIFICATE OF OCCUPANCY.
6) SEPARATE SIGN PERMITS ARE REOUIRED FOR ANY EXTERNAL SIGNS. PLEASE
CONTACT THE COUNTY PLANNER FOR THE APPLICATION.
7) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD
INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458.
PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN
DOCUMENTATION OF THE INSPECTIONS.
8) THE ELECTRICAL CODE REOUIRES A SEPARATE ELECTRICAL PERMIT FOR LOW
VOLTAGE FIRE ALARMS THAT HAS AN ALARM PANEL AND SEND A NOTIFICATION
TO THE FIRE DISTRICT WHEN UNDER ALARM. A ROUGH-IN INSPECTION WITH THE
STATE ELECTRICAL INSPECTOR IS REOUIRED (303) 869-3458. PLEASE HAVE THE
INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION
OF THE INSPECTION.
9) THE FIRE SPRINKLER AND ALARM ARE REOUIRED TO BE INSPECTED AND
APPROVED BY THE LOCAL FIRE PROTECTION DISTRICT. PLEASE PROVIDE SHOP
DRAWINGS TO THE FIRE DISTRICT FOR REVIEW AND SCHEDULE THE INSPECTIONS
ACCORDINGLY. PLEASE HAVE THE FIRE MARSHAL SIGN THE INSPECTION CARD
WHEN THE ROUGH INSPECTION IS APPROVED AND WHEN THE FINAL INSPECTION
IS APPROVED.
1O)BECAUSE IT FEEDS THE FIRE SPRINKLER SYSTEM, THE NEW WATER LINE
SUPPLYING THIS BUILDING IS TO BE INSPECTED BY THE FIRE MARSHAL ALONG
WITH THE WATER DISTRICT SUPPLYING THE WATER PRIOR TO BACKFILLING.
1 1) ANY REQUIREMENTS FROM THE CITY OF RIFLE REGARDING THE WATER AND
SEWER INSTALLATION ARE THE RESPONSIBILITY OF THE CONTRACTOR.
12)THE ENGTNEER OF RECORD rS TO VIEW THE TNFRASTRUCTURE WORK AND
PROVIDE A LETTER OF ACCEPTANCE TO THE COUNTY BUILDING DEPARTMENT
13)PLEASE PROVTDE SPECIAL INSPECTIONS REPORTS TO THE BUILDING
DEPARTMENT, WELDING AND BOLTING IS MINIMUM.
14)GEOTECHNICAL OBSERVATION lS REOUIRED WHEN THE EXCAVATION lS
COMPLETE AND WRITTEN VERIFICATION BE SUPPLIED AT FOOTING INSPECTION,
2500PSF.
15)COMBUSTTBLE MATERTAL rS LTMTTED rN ryPE r AND ryPE il CONSTRUCTTON. SEE
IBC 603 FOR ALLOWED COMBUSTIBLE MATERIALS.
1 6)ALL EXTERTOR LTGHTING lS TO BE DOWNCAST AND SHIELDED.
17)SAFEry GLAZING IS NOT DESIGNATED ON THE PLANS. SAFEry GLAZING WILL BE
cHECKED DURTNG THE FRAMING AND FINAL INSPECTION. (lBC 2406.4)
1B)ANY MEMBRANE AND THROUGH PENETRATIONS OF THE FIRE RESISTIVE
CONSTRUCTION WILL BE REOUIRED TO BE FIRE-STOPPED WITH LISTED FIRE
STOPPING ASSEMBLIES. THE CONTRACTOR IS TO PROVIDE A CUT SHEET FOR THE
ASSEMBLTES AT THE FRAMING INSPECTION. (lBC 713)
1 9)A KNOX BOX tS REOUTRED TO BE MOUNTED ADJACENT TO THE FRONT DOOR.
PLEASE CONTACT THE LOCAL FIRE DISTRICT FOR EXACT LOCATION.
20)tF THE FtRE SpRtNKLER SYSTEM REOUTRES A FrRE PUMP. THEN THE UTILITY ROOM
THAT HOUSES THE PUMP WILL BE REOUIRED TO BE ONE-HOUR CONSTRUCTION.
(rBC TABLE s08.2.s)
21)THE LOBBY/FBO AREA WILL BE REQUIRED TO PASS A BLOWER DOOR TEST
pRtoR To THE TSSUANCE OF THE CERTIFICATE OF OCCUPANCY. (IECC C402.5)
22)THE WALLS SURROUNDING THE TOILET ARE TO BE NON-ABSORBENT FOR A
HEIGHT OF 48'' AND 2' PAST ON EACH SIDE OF THE TOILET.
23)ALL ACCESSIBLE DOOR HARDWARE SHALL HAVE A SHAPE THAT IS EASY TO GRIP,
TNCLUD|NG POCKET AND SLIDING DOORS. (ANSI A117.1 - 404.2.6)
24)GRAB BAR BACKING IS TO BE IN PLACE FOR ALL TOILETS, BATHTUBS AND
SHOWERS.
25)pROVtDE MECHANTCAL COMM|SSTONTNG PER 2018 rECC C408. SEE CHECKLIST
c408.2.4.
26)ANy EXPOSED FOAM rS TO BE COVERED W|TH AN TGNTTTON BARRIER OR A
THERMAL BARRTER BASED ON LOCATION. (lRC R316)
27)THE SLAB EDGE TNUSLATTON tS ALLOWED TO BE REDUCED TO 1" AT THE SLAB
ARFA,
28) 12, p201, p202, THE GAS ENTRY |NTO THE BUILDING lS SHOWN lN 3 DIFFERENT
LOCATIONS. PLEASE COORDINATE PRIOR TO THE INSTALLATION. VEHICLE
PROTECTION MAY BE REQUIRED IF LOCATION IS PER P201.
29)THE HETGHT OF THE HANGER DOOR lS TO BE28',MAXIMUM, THE REMOVEABLE
PANEL IS NOT TO BE REMOVED TO INCREASE THE DOOR HEIGHT WITHOUT
APPROVAL OF THE BUILDING DEPARTMENT AND THE FIRE DISTRICT. FOAM
SUPRESSION IS REOUIRED FOR HANGER DOORS OVER 28'TALL.
30) CALL FOR AN UNDERGROUND PLUMBING INSPECTION OF THE SANDiOTL
SEPARATOR PRIOR TO BACKFILLING.
31) EACH LAYER OF THE MULTI-LAYER FIRE-RESISTIVE GYPSUM ASSEMBLIES ARE
TO BE CALLED IN FOR INSPECTION,
32)A LOCAL AMENDMENT REQUTRES THE FTREPLACE CHASE TO BE F|RE BLOCKED
AT 1O'INTERVALS.
33)ALL MATERIALS IN THE PLENUM ABOVE CEILING SHALL HAVE A MINIMUM
FLAME INDEX OF 25 AND SMOKE DEVELOPMENT INDEX OF NOT MORE THAN 50.
(rMc 602.2.1)
34)ACCESS PANELS ARE REQUIRED TO SERVICE THE FIRE DAMPERS.
35)M202 - STORAGE ROOM 126 HAS BEEN ADDED SINCE THE ORIGINAL REVIEW. THE
RETURN DUCT DOES NOT COMMUNICATE WITH THE AIR HANDLER UNIT. IT
APPEARS IT SHOULD BE DUCTED TO THE OFFICE AREA WITH A FIRE DAMPER OR
AN OPENING TO CONNECT THE TWO PLENUMS WITH A FIRE DAMPER. PLEASE
VERIFY WITH THE DESIGN ENGINEER PRIOR TO INSTALLATION.
36)EMERGENCY LtGHTTNG rS REOUIRED OUTSIDE OF EACH EXlr DOOR.