Loading...
HomeMy WebLinkAboutManual J Reportwrotsoft Project Summary Entire House For: Lawler Ranch Job: 25-362 Date: Oct 21, 2025 By: MIT Project lnfonnation Notes: Assume all purpose built daylight windows, no internal shading. Occupancy 4. Manual J- Desi_qn Information Weather: Garfield Co Rgnl, CO, US Winter Design Conditions Summer Design Conditions Outside db -2 °F Outside db 95 °F Inside db 70 °F Inside db 75 °F Design TD 72 °F Design TD 20 °F Daily range H Relative humidity 50 % Ventilation Method Moisture difference -45 gr/lb Heating Summary Structure 44112 Btuh Ducts (R-8.0) 7976 Btuh Central vent (0 cfm) 0 Btuh Humidification Piping Equipment load Infiltration Method Construction quality Fireplaces 0 Btuh 0 Btuh 52088 Btuh Simplified Average 0 Heating Cooling Area (ft�} 2469 2469 Volume (W) 27096 27096 Air changes/hour 0.32 0.16 Equiv. AVF (cfm) 145 72 Heating Equipment Summary Make n/a Trade n/a Model n/a AHRI ref. n/a Efficiency n/a Heating input Heating output 0 Btuh Temperature rise 0 °F Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a Sensible Cooling Equipment Load Sizing Structure 28547 Btuh Ducts (R-8.0) 3179 Btuh Central vent (0 cfm) 0 Btuh Blower 0 Btuh Use manufacturer's data n Rate/swing- multiplier Equipment sensible load 1.00 31822 Btuh Latent Cooling Equipment Load Sizing Structure -918 Btuh Ducts -426 Btuh Central vent (0 cfm) 0 Btuh Equipment latent load 0 Btuh Equipment Total Load (Seiri 31822 Btuh Req. total capacity at 0.70 SHR 3.8 ton Cooling Equipment Summary Make n/a Trade n/a Cond n/a Coil n/a AHRI ref. n/a Efficiency n/a Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. �_L 2025-Oct-21 14:03:16 Right -Suite® Universal 2025 25 0.01 RSU56562 Page 1 ...25-362 - Lawler Ranch - Manual J - REVISION rup Calc = MJ8 Front Door faces: N wrightwft. Project Summary (Unconditioned) Project Information For: Lawler Ranch Job: 25-362 Date: Oct 21, 2025 By: MT Notes: Assume all purpose built daylight windows, no internal shading. Occupancy 4. Manual J. Design • • Weather: Garfield Co Rgnl, CO, US Winter Design Conditions Summer Design Conditions Outside db -2 °F Outside db 95 °F Inside db 70 °F Inside db 75 °F Design TD 72 °F Design TD 20 °F Daily range H Relative humidity 50 % Ventilation Method MJ8 Moisture difference -45 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 0 Btuh Structure 0 Btuh Ducts (R-8.0) 0 Btuh Ducts (R-8.0) 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 0 Btuh Use manufacturer's data n Rate/swing multiplier 1.00 Infiltration Equipment sensible load 0 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Heating Cooling Area (ft) 0 0 Equipment latent load 0 Btuh Volume (fP) 0 0 Air changes/hour 0 0 Equipment Total Load (Sen+Lat) 0 Btuh Equiv. AVF (cfm) 0 0 Req. total capacity at 0.70 SHR 0 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.70 Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Aw- 2025-Oct-2114:03:16 /M AtsRight-Suite® Universal202525.0.01 RSU56562 Page ...25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJB Front Doorfaces: N wrightsolt Project Summary AHU1 Pro-ect Information For: Lawler Ranch Job: 25-362 Date: Oct 21, 2025 By: MT Notes: Assume all purpose built daylight windows, no internal shading. Occupancy 4. Manual J c Weather: Garfield Co Rgnl, CO, US Winter Design Conditions Summer Design Conditions Outside db -2 °F °F Outside db 95 75 °F °F Inside db Design TD 70 72 °F Inside db Design TD 20 °F Daily range H Relative humidity 50 % Ventilation Method MJ8 Moisture difference -45 gr/Ib Heating Summary Structure 44112 Btuh Ducts (R-8.0) 7976 Btuh Central vent (0 cfm) 0 Btuh Humidification Piping Equipment load Method Construction quality Fireplaces Sensible Cooling Equipment Load Sizing Structure 28547 Btuh Ducts (R-8.0) 3179 Btuh Central vent (0 cfm) 0 Btuh 0 Btuh Blower 0 Btuh 52088 Btuh Use manufacturer's data Rate/swing multiplier Infiltration Equipment sensible load Simplified Average 0 Heating Cooling Area (ft2) 2469 2469 Volume (ft3) 27096 27096 Air changes/hour 0.32 0.16 Equiv. AVF (cfm) 145 72 Heating Equipment Summary Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFUE 0 Btuh 0 Btuh 0 °F 1930 cfm 0.037 cfm/Btuh 0 in H2O 0 Btuh n 1.00 31822 Btuh Latent Cooling Equipment Load Sizing Structure -918 Btuh Ducts - 426 Btuh Central vent (0 cfm) 0 Btuh Equipment latent load 0 Btuh Equipment Total Load (Sen+Lat) 31822 Btuh Req. total capacity at 0.70 SHR 3.8 ton Cooling Equipment Summary Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed- 0 SEER 0 Btuh 0 Btuh 0 Btuh 1930 cfm 0.061 cfm/Btuh 0 in H2O 1.00 J 2025-Oct-21 14:03:16 Right -Suite® Universal202525.0.01 RSU56562 Page 25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 25-362 wrights© Date: Oct 21, 2025 Entire House By: MT For: Lawler Ranch Design Conditions Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified Wet bulb (7) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'-'F ft'-°F/Btuh Btuh/ft= Btuh Btuh/ft' Btut Walls 12F-5sw: Firm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud Partitions 12F-Osw: Frm wall, 5/8" gyp.bd ext, r-21 cav ins, 5/8" gypsum board int fish, 2"x6" wood frm, 16" o.c. stud Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 4.5 ft overhang (8.5 ft window ht, 0.33 ft sep.); 6.67 ft head ht 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 3.5 ft overhang (8.5 ft window ht, 0.5 ft sep.); 6.67 ft head ht 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 5 ft overhang (8.5 ft window ht, 0 ft sep.); 6.67 ft head ht 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 10.5 ft overhang (8.5 ft window ht, 0.25 ft sep.); 6.67 ft head ht n 923 0.050 26.0 2.57 2368 0.36 329 e 981 0.050 26.0 2.53 2485 0.35 345 s 661 0.050 26.0 3.03 2001 0.42 278 w 791 0.050 26.0 3.19 2518 0.44 350 all 3355 0.050 26.0 2.79 9372 0.39 1302 176 0.065 21.0 1.95 344 0.32 57 n 125 0.280 0 20.2 2512 13.4 1675 e 88 0.280 0 16.4 1451 35.4 3127 s 109 0.280 0 20.2 2193 21.9 2381 w 64 0.280 0 20.2 1297 43.5 2796 all 386 0.280 0 19.3 7452 25.8 9979 n 20 0.280 0 20.2 400 13.4 267 n 26 0.280 0 20.2 514 13.4 343 all 45 0.280 0 20.2 914 13.4 609 s 51 0.280 0 20.2 1028 13.4 686 s 51 0.280 0 20.2 1028 13.4 686 all 102 0.280 0 20.2 2056 13.4 1371 s 50 0.280 0 20.2 1000 13.4 667 s 62 0.280 0 20.2 1257 13.4 838 s 128 0.280 0 20.2 2570 13.4 1714 all 239 0.280 0 20.2 4827 13.4 3218 s 51 0.280 0 20.2 1028 13.4 686 s 62 0.280 0 20.2 1242 13.4 828 all 113 0.280 0 20.2 2271 13.4 1514 4 -PkVWpj�;waft 2025-Oct-21 14:03:16 �.,. - __ Right -Suite® Universal 202525.0.01 RSU56562 Page 1 . 25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJ8 Front Door faces: N Doors Door, wd sc type w 153 0.300 0 0 0 0 0 n 24 0.300 0 9.00 216 1.50 36 all 177 0.300 0 1.22 216 0.20 36 Ceilings Attic ceiling, mtl roof mat, r-49 cell ins, 5/8" gypsum board int fnsh 587 0.021 49.0 0 0 0 0 Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" 2521 0.025 49.0 1.78 4491 0.82 2059 thkns, r-49 ceil ins Floors 2213-10tpm: Bg floor, heavy dry or light damp soil, on grade depth, r-10 82 0.355 10.0 0 0 0 0 edge ins Fir floor, frm fir, 12" thkns, hrd wd fir fish, r-38 cav ins, leaky crwl ovr, 1856 0.029 53.0 1.34 2487 0.38 701 r-15 wall insul Ar floor, frm flr, 12" thkns, r-38 cav ins, leaky crwl ovr, r-15 wall insul 52 0.029 53.0 0 0 0 0 Fir floor, frm fir, 12" thkns, tile fir fnsh, r-38 cav ins, leaky crwl ovr, r-15 613 0.029 53.0 1.34 821 0.38 232 wall insul 2025-Oct-21 14:03:16 VwRrF�t'�f[ Right-Suite®Universal 2025 25 0 01 RSU56562 Page 2 �� .25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJB Front Door faces: N Wi1�-7V�sso ft Component Constructions Job: 25-362 Date: Oct 21, 2025 AHU1 By: MT For: Lawler Ranch Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40oN Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (°F) - 35 ( H ) Method Simplified Wetbulb(°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area Ll-value Insul R Htg HTM Loss Clg HTM Gain fl° Btuh/ft=-OF ft-°F/BWh BtuhAt' Btuh Btuh/fF Btuf Walls 12F-5sw: Frm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud Partitions 12F-Osw: Frm wall, 5/8" gyp.bd ext, r-21 cav ins, 5/8" gypsum board int fish, 2"x6" wood frm, 16" o.c. stud Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vni frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, cir low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 4.5 ft overhang (8.5 ft window ht, 0.33 ft sep.); 6.67 ft head ht 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl fmt mat, clr low-e mid, air gas, 1/8" thk, clr innr; 3.5 ft overhang (8.5 ft window ht, 0.5 ft sep.); 6.67 ft head ht 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, dr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 5 ft overhang (8.5 ft window ht, 0 ft sep.); 6.67 ft head ht 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 10.5 ft overhang (8.5 ft window ht, 0.25 ft sep.); 6.67 ft head ht n 658 0.050 26.0 3.60 2368 0.50 329 e 690 0.050 26.0 3.60 2485 0.50 345 s 556 0.050 26.0 360 2001 0.50 278 w 700 0.050 26.0 3.60 2518 0.50 350 all 2603 0.050 26.0 3.60 9372 0.50 1302 176 0.065 21.0 1.95 344 0.32 57 n 125 0.280 0 20.2 2512 13.4 1675 e 72 0.280 0 20.2 1451 43.5 3127 s 109 0.280 0 20.2 2193 21.9 2381 w 64 0.280 0 20.2 1297 43.5 2796 all 370 0.280 0 20.2 7452 27.0 9979 n 20 0.280 0 20.2 400 13.4 267 n 26 0.280 0 20.2 514 13.4 343 all 45 0.280 0 20.2 914 13.4 609 s 51 0.280 0 20.2 1028 13.4 686 s 51 0.280 0 20.2 1028 13.4 686 all 102 0.280 0 20.2 2056 13.4 1371 s 50 0.280 0 20.2 1000 13.4 667 s 62 0.280 0 20.2 1257 13.4 838 s 128 0.280 0 20.2 2570 13.4 1714 all 239 0.280 0 20.2 4827 13.4 3218 s 51 0.280 0 20.2 1028 13.4 686 s 62 0.280 0 20.2 1242 13.4 828 all 113 0.280 0 20.2 2271 13.4 1514 1i111FlligfttitOft Right-Suite®2025-Oct-21 14:03:16Universal 2025 25.0.01 RSU56562 Page 3 ...25-362 -Lawler Ranch -Manual J - REVISION.rup Calc = MJ8 Front Door faces: N Doors Door, wd sc type Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" thkns, r-49 ceil ins Floors Fir floor, frm fir, 12" thkns, hrd wd fir fish, r-38 cav ins, leaky crwl ovr, r-15 wall insul Fir floor, frm fir, 12" thkns, the fir fish, r-38 cav ins, leaky crwl ovr, r-15 wall insul n 24 0.300 2469 0.025 1856 0.029 613 0.029 0 9.00 216 1.50 36 49.0 1.82 4491 0.83 2059 53.0 1.34 2487 0.38 701 53.0 1.34 821 0.38 232 [ W rtcIF+t�t� 2025-Oct-21 14:03:16 i Right -Suite® Universal 2025 25 0.01 RSU56562 Page JOCK ...25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 25-362 Wlrightsoft Date: Oct 21, 2025 (Unconditioned) By: MT For: Lawler Ranch Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (°F) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified Wet bulb ('F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'-°F W-°F/Btuh Btuh/W Btuh Btuh/ft' Btuh Walls 12F-5sw: Frm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum n 265 0.050 26.0 0 0 0 0 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud a 291 0.050 26.0 0 0 0 0 s 105 0.050 26.0 0 0 0 0 w 91 0.050 26.0 0 0 0 0 all 752 0.050 26.0 0 0 0 0 Partitions (none) Windows 3 glazing, dr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, a 16 0.280 0 0 0 0 0 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vni frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht Doors Door, wd sc type w 153 0.300 0 0 0 0 0 Ceilings Attic ceiling, mtl roof mat, r-49 ceil ins, 5/8" gypsum board int fish 587 0.021 49.0 0 0 0 0 Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" 52 0.025 49.0 0 0 0 0 thkns, r-49 ceil ins Floors 22B-10tpm: Bg floor, heavy dry or light damp soil, on grade depth, r-10 82 0.355 10.0 0 0 0 0 edge ins Flr floor, frm fir, 12" thkns, r-38 cav ins, leaky crwl ovr, r-15 wall insul 52 0.029 53.0 0 0 0 0 2025-Oct-21 14:03:16 AMW Right -Suite® Universal202525.0.01 RSU56562 Page .. 25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJ8 Front Doorfaces: N 62 J` Oct 21 Component Constructions Job: Date: OOct W�i[�'ltr50� , 2025 GARAGE By: MT Project tnformat'[011 For: Lawler Ranch Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified Wet bulb (T) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft2--°F ft2-'Fifth Erwhlff Btuh Btuh/ft' Btuh Walls 12F-5sw: Fnn wall, vni ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum n 265 0.050 26.0 0 0 0 0 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud a 228 0.050 26.0 0 0 0 0 s 105 0.050 26.0 0 0 0 0 w 91 0.050 26.0 0 0 0 0 all 689 0.050 26.0 0 0 0 0 Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, a 16 0.280 0 0 0 0 0 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vni frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht Doors Door, wd sc type w 153 0.300 0 0 0 0 0 Ceilings Attic ceiling, mtl roof mat, r-49 ceil ins, 5/8" gypsum board int fish 587 0.021 49.0 0 0 0 0 Floors 22B-10tpm: Bg floor, heavy dry or light damp soil, on grade depth, r-10 82 0.355 10.0 0 0 0 0 edge ins 2025-Oct-21 14:03:16 ACA-* W1" 9"t Right -Suite® Universal 2025 25 0 01 RSU56562 Page 6 ...25-362 - Lawler Ranch - Manual J - REVISION rup Calc = MJ8 Front Door faces: N I Com onent Constructions Job: 25-362 wril�ghtsof Date: Oct 21, 2025 MECH By: MT - Ie r. For: Lawler Ranch Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified Wet bulb (°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain IF Btuh/fF-°F ft?-"F/Btuh Btuh/fF Btuh Btuh/ft' Btuh Walls 12F-5sw: Firm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum a 63 0.050 26.0 0 0 0 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fnsh, 8" 52 0.025 49.0 0 0 0 thkns, r-49 veil ins Floors Flr floor, frm flr, 12" thkns, r-38 cav ins, leaky crwl ovr, r-15 wall insul 52 0.029 53.0 0 0 0 0 0 u 2025-Od-21 14:03:16 1CA�# R ' Right -Suite@ Universal 2025 25.0.01 RSU56562 Page 25-362 -Lawler Ranch -Manual J - REVISION.rup Calc = MJB Front Door faces: N Component Constructions .� °�d6ot�•��Rt�dft M Job: 62 Oct 21 Date: OOct , 2025 MUD By: MT Project For: Lawler Ranch D- • • • ons Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified Wet bulb (T) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain R' Btuh/Rft'-OF T-°F/Btuh Btuh/W Btuh Btuh/ft' Btuh Walls 12F-5sw: Frm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum w 89 0.050 26.0 3.60 321 0.50 45 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud Partitions 12F-Osw: Fnn wall, 5/8" gyp.bd ext, r-21 cav ins, 5/8" gypsum board int 109 0.065 fish, 2"x6" wood frm, 16" o.c. stud Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, w 12 0.280 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht Doors Door, wd sc type n 24 0.300 Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" 87 0.025 thkns, r-49 ceil ins Floors Fir floor, frm fir, 12" thkns, tile fir fish, r-38 cav ins, leaky crwl ovr, r-15 87 0.029 wall insul ^� Right-Sui[eOUniversal 202525.0.01 RSU56562 ACCR ..,25-362 - Lawler Ranch - Manual J - REVISION rup Calc = MJ8 Front Door faces: N 21.0 1.95 212 0.32 35 0 20.2 242 43.5 522 0 9.00 216 1.50 36 49.0 1.82 159 0.83 73 53.0 1.34 117 0.38 33 2025-Oct-21 14:03:16 Page 8 Job: 25-362 wriightsoft Component Constructions Date: Oct21, 2025 LAUNDRY By: MT Project Informat-ion For: Lawler Ranch Design Condi#ens Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 (H ) Method Simplified VUetbulb(°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Bluh/fF-°F ft'-°F/Btuh Btuh/W Btuh Btuh/ft' Bluh Walls 12F-5sw: Firm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum n 18 0.050 26.0 3.60 65 0.50 9 board int fnsh, r-5 ext bd ins, 2" x6" wood frm, 16" o.c. stud w 80 0.050 26.0 3.60 290 0.50 40 all 98 0.050 26.0 3.60 355 0.50 49 Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, w 5 0.280 0 20.2 101 43.5 217 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vni frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fnsh, 8" 93 0.025 49.0 1.82 169 0.83 77 thkns, r-49 cell ins Floors Flr floor, frm fir, 12" thkns, tile fir fnsh, r-38 cav ins, leaky crwl ovr, r-15 93 0.029 53.0 1.34 124 0.38 35 wall insul wrii9htsc2,ft 2025-Oct-21 14:03:16 �.. r . Rig ht-Suite® Universal2025 25 0.01 RSU56562 Page MCA ..25-362 -Lawler Ranch -Manual J -REVISION rup Calc = MJB Front Doorfaces: N 25-362 .I . Component Constructions Job: Oct1 �-}} v��tS�� p Date: Oct 21, 2025 I °�' ° E. HALL By: MT For: Lawler Ranch Design Condition's Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Latitude: 40°N Design 9 n TD (T) Relative humidity (%) 72 50 20 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 (H ) Method Simplified VUetbulb (°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fF Btuh/R'-OF fi'-°FlBtuh Bluh/fF Btuh Btuh/fF Btuh Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fnsh, 8" 45 0.025 49.0 1.82 81 0.83 thkns, r-49 veil ins Floors Fir floor, frm fir, 12" thkns, hrd wd fir fnsh, r-38 cav ins, leaky crwl ovr, 45 0.029 530 1.34 60 0.38 r-15 wall insul 37 17 2025-Oct-21 14:03:16 �_ �II1Plf Right -Suite@ Universal 2025 25.0 01 RSU56562 Page 10 ACCA ...25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJ8 Front Door faces: N wroa....!� Component Constructions Job: 25-362 teDate: Oct 21, 2025 PANTRY By: MT ' - >p s For: Lawler Ranch Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified Wet bulb (°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area Ll-value Insul R Htg HTM Loss Clg HTM Gain fP BWh/ft'-°F fF-°F/ tuh BtuhtW Btuh Btuh/P Btuh Walls 12F-5sw: Frm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum s 56 0.050 26.0 3.60 203 0.50 28 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" 34 0.025 49.0 1.82 63 0.83 29 thkns, r-49 ceil ins Floors Flr floor, frm fir, 12" thkns, hrd wd fir fish, r-38 cav ins, leaky crwl ovr. 34 0.029 53.0 1.34 46 0.38 13 r-15 wall insul 1 A& Wrigltalcsast[' 2025-Oct-2114:03:16 Right -Suite® Universal 2025 25.0 01 RSU56562 Page 11 . 25-362 - Lawler Ranch - Manual J - REVISION rup Calc = MJ8 Front Door faces: N Oct C Component Constructions Job: -362 �"� wrightsoit Date: OOct , 2025 KITCHEN By: MT Pr4ect 1wiformation For: Lawler Ranch Desiigni iGoaditions Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (TF) 70 75 Elevation: 6913 ft Design TD (TF) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (°F) - 35 ( H ) Method Simplified Wet bulb (°F) 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain fl' BtuhM-OF W-°F/Btuh Btuh/ft' Btuh Btuh/ft' Btuh Walls 12F-5sw: Frm wall, vni ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum n 134 0.050 26.0 3.60 482 0.50 67 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud a 133 0.050 26.0 3.60 480 0.50 67 s 80 0.050 26.0 3.60 286 0.50 40 all 347 0.050 26.0 3.60 1249 0.50 173 Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 5 ft overhang (8.5 ft window ht, 0 ft sep.); 6.67 ft head ht Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" thkns, r-49 veil ins Floors Flr floor, frm fir, 12" thkns, hrd wd flr fish, r-38 cav ins, leaky crwl ovr, r-15 wall insul n 48 0.280 0 20.2 968 13.4 645 s 26 0.280 0 20.2 529 21.9 574 all 74 0.280 0 20.2 1497 16.4 1220 s 50 0.280 0 20.2 1000 13.4 667 s 62 0.280 0 20.2 1257 13.4 838 all 112 0.280 0 20.2 2256 13.4 1504 335 0.025 49.0 1.82 610 0.83 279 335 0.029 53.0 1.34 449 0.38 127 2025-Oct-21 14:03:16 Right -Suite® Universal 2025 25 0 01 RSU56562 page 12 .CC% .. 25-362 - Lawler Ranch - Manual J - REVISION rup Calc = MJ8 Front Door faces: N + wrightsoft. Component Constructions GREAT ROOM Project• • For: Lawler Ranch Job: 25-362 Date: Oct 21, 2025 By: MT Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (TF) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified VVetbulb (°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Bluh/FF-'F ft'-°F/Btuh BtuhM2 Btuh Btuh/ft' Btuh Walls 12F-5sw: Firm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum s 110 0.050 26.0 3.60 394 0.50 55 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud w 101 0.050 26.0 3.60 363 0.50 50 all 210 0.050 26.0 3.60 757 0.50 105 Partitions (none) Windows 3 glazing, cir low-e outr, 1/4" gap, vnl frm mat, dr low-e mid, air gas, s 26 0.280 0 20.2 529 21.9 574 1/8" thk, cir innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, cir innr; 6.67 ft head ht 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, s 128 0.280 0 20.2 2570 13.4 1714 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 5 ft overhang (8.5 ft window ht, 0 ft sep.); 6.67 ft head ht Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fnsh, 8" 376 0.025 49.0 1.82 683 0.83 313 thkns, r-49 ceil ins Floors Fir floor, frm flr, 12" thkns, hrd wd fir fish, r-38 cav ins, leaky crwl ovr, 376 0.029 53.0 1.34 503 0.38 142 r-15 wall insul 4 wrightsoft• 2025-Oct-2114:03:16 Right -Suite@ Universal 2025 25 0 01 RSU56562 Page 13 25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJ8 Front Door faces: N Component Constructions Job: -362 �r+li�'i��'l�O� Date: OctOt 21, 2025 ENTRY By: MT Projecrmafion For: Lawler Ranch Design Conditions Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (°F) - 35 (H ) Method Simplified Wet bulb (°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fl' Btuhff-OF fl'-°F/Btuh Bluh/t' Btuh Btuh/ft' Btuh Walls 12F-5sw: Frm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum n 67 0.050 26.0 3.60 242 0.50 34 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud a 58 0.050 26.0 3.60 211 0.50 29 all 126 0.050 26.0 3.60 452 0.50 63 Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, n 20 0.280 0 20.2 400 13.4 267 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 4.5 ft overhang (8.5 ft window ht, n 26 0.280 0 20.2 514 13.4 343 0.33 ft sep.); 6.67 ft head ht all 45 0.280 0 20.2 914 13.4 609 Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" 81 0.025 49.0 1.82 148 0.83 68 thkns, r-49 cell ins Floors Flr floor, frm flr, 12" thkns, tile flr fnsh, r-38 cav ins, leaky crwl ovr, r-15 81 0.029 53.0 1.34 109 0.38 31 wall insul } 2025-Oct-21 14:03:16 —Ak— ` Rig ht-Su ite® Universal 2025 25.0.01 RSU56562 Page14 A+CK ..25-362 - Lawler Ranch - Manual J - REVISION rup Calc = MA Front Door faces: N ob: 25-362 Component Constructions Date: Oct 21,2026 PWDR By: MT Project lnfo,rmation For: Lawler Ranch Design • • • Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (TF) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (TF) - 35 ( H ) Method Simplified Wet buIb (T) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft=-'F fP-'F/Btuh Bluh/ft' Btuh Btuh/fF Btuh Walls 12F-5sw: Firm wall, vni ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum n 44 0.050 26.0 3.60 158 0.50 22 board int fish, r-5 ext bd ins, 2"W' wood frm, 16" o.c. stud w 58 0.050 26.0 3.60 211 0.50 29 all 102 0.050 26.0 3.60 368 0.50 51 Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vni frm mat, clr low-e mid, air gas, n 8 0.280 0 20.2 161 13.4 108 1/8" thk, cir innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" 37 0.025 49.0 1.82 68 0.83 31 thkns, r-49 ceil ins Floors Fir floor, frm fir, 12" thkns, tile flr fish, r-38 cav ins, leaky crwl ovr, r-15 37 0.029 53.0 1.34 50 0.38 14 wall insul 2025-Oct-21 14:03:16 ACCRight -Suite® U niversal 2025 25.0.01 RSU56562 Page 15 ---25-362 -'Lawler Ranch - Manual J - REVISION.rup Calc = MJ8 Front Door faces: N Component Constructions Job: -362 �a��-����� Date: OctOt 21, 2025 W. HALL By: MT For: Lawler Ranch Diesign, ® a, r. Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (°F) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified Wet bulb (°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain It, Btuh/ff--'F T-°F/Btuh Btuhllt' Btuh Btuh/R' Btuh Walls 12F-5sw: Frm wall, vni ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum n 61 0.050 26.0 3.60 221 0.50 31 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, n 22 0.280 0 20.2 444 13.4 296 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 it head ht Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" 68 0.025 49.0 1.82 123 0.83 56 thkns, r-49 veil ins Floors Fir floor, frm flr, 12" thkns, hrd wd flr fish, r-38 cav ins, leaky crwl ovr, 68 0.029 53.0 1.34 91 0.38 26 r-15 wall insul —rk 2025-Oct-21 14:03:16 �! w� Right -Suite® Universal 2025 25.0 01 RSU56562 Page 16 ACCA ..25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJ8 Front Door faces: N Wrightson Component Constructions OFFICE For: Lawler Ranch Location: Garfield Co Rgnl, CO, US Elevation: 6913 ft Latitude: 40°N Outdoor: Heating Dry bulb (T) -2 Dailyrange (°F) - VWIet bulb (°F) - VUind speed (mph) 15.0 Indoor: Indoor temperature (T) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 95 Infiltration: 35 ( H ) Method 59 Construction quality 7.5 Fireplaces Job: 25-362 Date: Oct 21, 2025 By: MT Heating Cooling 70 75 72 20 50 50 65.9 -45.2 Simplified Average 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' BtuhlW-"F fF-°F/Btuh Bhjh/W Btuh Btuh/ft' Btuh Walls 12F-5sw: Firm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum s 17 0.050 26.0 3.60 62 0.50 9 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, s 50 0.280 0 20.2 1014 21.9 1101 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" 70 0.025 49.0 1.82 127 0.83 58 thkns, r-49 cell ins Floors Fir floor, frm flr, 12" thkns, hrd wd fir fnsh, r-38 cav ins, leaky crwl ovr, 70 0.029 53.0 1.34 94 0.38 26 r-15 wall insul _ � wrig r7 sonlf# 2025-Oct-2114:03:16 .t... Right -Suite® Universal 2025 25.0.01 RSU56562 Page 17 ,CC, 25-362 - Lawler Ranch - Manual J - REVISION rup Calc = MJ8 Front Door faces: N Oct p21 omonent Constructions Job: -362 +� �rights�� CDate: OOct , 2025 PRIMARY BED By: MT For: Lawler Ranch 1011ATMT liffift D Location: Indoor: Heating Cooling Garfield Co Rgni, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified Wet bulb (°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fl' Bluh/R'--'F W-'F[Bluh BtuhN Btuh BMW Btuh Walls 12F-5sw: Frm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum a 146 0.050 26.0 3.60 526 0.50 73 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud s 175 0.050 26.0 3.60 630 0.50 87 w 72 0.050 26.0 360 259 0.50 36 all 393 0.050 26.0 3.60 1414 0.50 196 Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, a 29 0.280 0 20.2 591 43.5 1275 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht 3 glazing, clr low-e outr, 1/4" gap, vni frm mat, clr low-e mid, air gas, S 51 0.280 0 20.2 1028 13.4 686 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 10.5 ft overhang (8.5 ft window ht, s 62 0.280 0 20 2 1242 13.4 828 0.25 ft sep.); 6.67 ft head ht all 113 0.280 0 202 2271 13.4 1514 Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fnsh, 8" 310 0.025 49.0 1.82 564 0.83 258 thkns, r-49 ceil ins Floors Fir floor, frm fir, 12" thkns, hrd wd flr fnsh, r-38 cav ins, leaky crwl ovr, 310 0.029 53.0 1.34 415 0.38 117 r-15 wall insul W i' eg hlLtc3oft 2025-Oct-21 14:03:16 Atz Right -Suite® Universal 2025 25 0.01 RSU56562 Page 113 ACC - ...25-362 - Lawler Ranch - Manual J - REVISION rup Cale = MJ8 Front Door faces: N + .irlrrigh soft Component Constructions PRIME BATH Project o• For: Lawler Ranch Job: 25-362 Date: Oct 21, 2025 By: MT Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (TF) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40oN Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Daily range (TF) - 35 ( H ) Method Simplified Wletbulb(°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuhff-°F fP-°F/Btuh Bluh1W Btuh Btuh/fF Btuh Walls 12F-5sw: Frm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum n 140 0.050 26.0 3.60 502 0.50 70 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud a 65 0.050 26.0 3.60 233 0.50 32 all 204 0.050 26.0 3.60 735 0.50 102 Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" thkns, r-49 veil ins Floors Fir floor, frm flr, 12" thkns, tile fir fish, r-38 cav ins, leaky crwl ovr, r-15 wall insul n 11 0.280 0 20.2 227 13.4 151 e 28 0.280 0 20.2 554 43.5 1195 all 39 0.280 0 20.2 781 34.7 1346 172 0.025 49.0 1.82 312 0.83 143 172 0.029 53.0 1.34 230 0.38 65 ti _41, wri9ft2s ft 2025-Oct-21 14:03:16 —_ Right -Suite® Universal 2025 25 0 01 RSU56562 Page 19 25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJ8 Front Doorfaces: N Oct C Component Constructions Job: -362 wlr�ghtsaft Date: OOct , 2025 wic By: MT Project• • For: Lawler Ranch ®e d4bbnls Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (TF) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified Wet bulb (T) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions or Area U-value Insul R Htg HTM Loss CIg HTM Gain ft' Btuh/ft--°F ft'-0 F/Bhrh Bluh/fF Btuh Btuh/ft' Btuh Walls 12F-5sw: Frm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum a 38 0.050 26.0 3.60 138 0.50 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud Partitions 12F-Osw: Firm wall, 5/8" gyp.bd ext, r-21 cav ins, 5/8" gypsum board int 68 0.065 21.0 1.95 132 0.32 fish, 2"x6" wood frm, 16" o.c. stud Windows (none) Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fnsh, 8" 114 0.025 49.0 1.82 208 0.83 thkns, r-49 veil ins Floors Fir floor, frm fir, 12" thkns, hrd wd flr fnsh, r-38 cav ins, leaky crwl ovr, 114 0.029 53.0 1.34 153 0.38 r-15 wall insul 19 22 95 43 2025-Oct-21 14:03:16 Right -Suite@ Universal 2025 25.0.01 RSU56562 page 20 ...25-362 - Lawler Ranch -Manual J - REVISION.rup Calc = MJ8 Front Doorfaces: N Wi`1a7V, `s..oft Component Constructions Job: 25-362 Date: Oct 21, 2025 BED 2 By: MT For: Lawler Ranch Desig onditbns Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (TF) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified Wet bulb (°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fR BtuhHF--°F fF-°FBtuh Btuhff Btuh Btuh/ft' Btuh Walls 12F-5sw: Firm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum a 115 0.050 26.0 3.60 414 0.50 58 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud s 70 0.050 26.0 3.60 254 0.50 35 w 69 0.050 26.0 3.60 247 0.50 34 all 254 0.050 26.0 3.60 915 0.50 127 Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, %V 15 0.280 0 20.2 296 43.5 637 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, s 51 0.280 0 20.2 1028 13.4 686 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 3.5 ft overhang (8.5 ft window ht, s 51 0.280 0 20.2 1028 13.4 686 0.5 ft sep.); 6.67 ft head ht all 102 0.280 0 20.2 2056 13.4 1371 Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fnsh, 8" 273 0.025 49.0 1.82 497 0.83 228 thkns, r-49 cell ins Floors Fir floor, frm fir, 12" thkns, hrd wd fir fish, r-38 cav ins, leaky crwl ovr, 273 0.029 53.0 1.34 366 0.38 103 r-15 wall insul 46- wr.VftLs.t,f-t 2025-Oct-21 14:03:16 Right -Suite® Universal 2025 25.0 01 RSU56562 Page21 25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJB Front Doorfaces: N 25-362 _J Component Constructions Job: Oct1 w�'i��aft p Date: Oct 21, 2025 [[[ BA TH 2 By: MT f -ct Inform-aitr-611110. For: Lawler Ranch Design • • • it Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified Wet bulb (°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'--"F fF-°F/Btuh Btuh/R' Btuh Btuh/ft' Btuh Walls 12F-5sw: Frm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum s 48 0.050 26.0 3.60 173 0.50 24 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o c. stud w 97 0.050 260 3.60 348 0.50 48 all 145 0.050 26.0 3.60 521 0.50 72 Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" thkns, r-49 ceil ins Floors Fir floor, frm fir, 12" thkns, tile fir fnsh, r-38 cav ins, leaky crwl ovr, r-15 wall insul s 6 0.280 0 20.2 121 21.9 131 w 9 0.280 0 20.2 181 43.5 391 al: 15 0.280 0 20.2 302 34.8 522 70 0.025 49.0 1.82 128 0.83 59 70 0.029 53.0 1.34 95 0.38 27 2025-Oct-21 14:03:16 Right -Suite® Universal 2025 25 0.01 RSU56562 Page22 25-362 - Lawler Ranch - Manual J - REVISION rup Calc = MJ8 Front Door faces: N + weightsoft Component Constructions BED 3 e .! D �. For: Lawler Ranch Location: Garfield Co Rgnl, CO, US Elevation: 6913 ft Latitude: 40°N Outdoor: Heating Dry bul b (T) -2 Daily range (T) - Wet bu lb (° F) - Wind speed (mph) 15.0 Indoor: Indoor temperature (°F) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 95 Infiltration: 35 ( H ) Method 59 Construction quality 7.5 Fireplaces Job: 25-362 Date: Oct 21, 2025 By: MT Heating 70 72 50 65.9 Simplified Average 0 Cooling 75 20 50 -45.2 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fl' Btuhff-'F fF-°F/9tuh BWh/R' Btuh Muh/R' Btuh Walls 12F-5sw: Frm wall, vni ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum n 146 0.050 26.0 3.60 526 0.50 73 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud a 134 0.050 26.0 3.60 484 0.50 67 w 34 0.050 26.0 3.60 123 0.50 17 all 315 0.050 26.0 3.60 1133 0.50 157 Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, n 29 0.280 0 20.2 591 13.4 394 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr a 15 0.280 0 202 305 43.5 657 low-e mid, air gas, 1 /8" thk, clr innr; 6.67 ft head ht w 15 0.280 0 20.2 296 43.5 637 all 59 0.280 0 20.2 1192 28.6 1689 Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" 232 0.025 49.0 1.82 421 0.83 193 thkns, r-49 veil ins r Floors Flr floor, frm flr, 12" thkns, hrd wd fir fish, r-38 cav ins, leaky crwl ovr, 232 0.029 53.0 1.34 310 0.38 87 r-15 wall insul wriightmoll3 ' 2025-Oct-2114:03:16 ..� Right -Suite® Universal 2025 25 0.01 RSU56562 Page 23 MCA ...25-362 -Lawler Ranch -Manual J - REVISION.rup Calc = MJB Front Door faces: N 62 Oct 21 Component Constructions Job: Date: OOct sll+a��'���tSOf� , 2025 FFF BATH 3 By: MT Project • • For: Lawler Ranch Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (T) 70 75 Elevation: 6913 ft Design TD (T) 72 20 Latitude: 40oN Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (T) -2 95 Infiltration: Dailyrange (T) - 35 ( H ) Method Simplified WetbuIb (°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ff Btuhff-°F R'-`F/Btuh Btuh& Btuh Btuh/F Btuh Walls 12F-5sw: Frm wall, vnl ext, 5/8" wood shth, r-21 cav ins, 5/8" gypsum n 48 0.050 26.0 3.60 173 0.50 24 board int fnsh, r-5 ext bd ins, 2"x6" wood frm, 16" o.c. stud w 99 0.050 26.0 3.60 356 0.50 50 all 147 0.050 26.0 3.60 529 0.50 74 Partitions (none) Windows 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr: 3 glazing, clr low-e outr, 1/4" gap, vnl frm mat, clr low-e mid, air gas, 1/8" thk, clr innr; 6.67 ft head ht Doors (none) Ceilings Rf/clg ceiling, mtl roof mat, frm cons, 5/8" gypsum board int fish, 8" thkns, r-49 ceil ins Floors Flr floor, frm fir, 12" thkns, tile flr fnsh, r-38 cav ins, leaky crwi ovr, r-15 wall insul n 6 0.280 0 20.2 121 13.4 81 w 9 0.280 0 20.2 181 43.5 391 all 15 0.280 0 20.2 302 31.5 472 72 0.025 49.0 1.82 131 0.83 60 72 0.029 53.0 1.34 97 0.38 27 2025-Oct-21 14:03:16 WPf�FtatL+�tei Right -Suite@ Universal 2025 25.0 01 RSU56562 Page 24 ACCA ...25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJ8 Front Door faces: N wrightsoft Load Short Form Entire House For: Lawler Ranch Job: 25-362 Date: Oct 21, 2025 By: MT Htg Clg Infiltration Outside db (°F) -2 95 Method Simplified Inside db (°F) 70 75 Construction quality Average Design TD (°F) 72 20 Fireplaces 0 Daily range - H Inside humidity (%) 50 50 Moisture difference (gr/lb) 66 -45 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load CIg load Htg AVF CIg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) AHU1 2469 52088 31726 1930 1930 (Unconditioned) 640 0 0 0 0 Entire House 3108 52088 31726 1930 1930 Other equip loads 0 0 Equip. @ 1.00 RSM 31822 Latent cooling 0 Tr1TA1 0 I ee no I I I v l vV VLVVV V I VLL 1 JVV 1 JVV Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 1 -* 2025-Oct-2114:03:16 ­.,....., Right -Suite® Universal2025 25 0.01 RSU56562 Page 1 ..25-362 -Lawler Ranch -Manual J - REVISION.rup Calc = MJ8 Front Door faces: N Load Short Form Job: 25-362 wirighitso ft Date: Oct 21, 2025 li (Unconditioned) By: MT ® . r=mm1 a For: Lawler Ranch Htg Clg Infiltration Outside db (°F) -2 95 Method Simplified Inside db (°F) 70 75 Construction quality Average Design TD (°F) 72 20 Fireplaces 0 Daily range - H Inside humidity (%) 50 50 Moisture difference (gr/lb) 66 -45 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.70 ROOM NAME Area (ftz) Htg load Clg load (Btuh) (Btuh) Htg AVF (cfm) Clg AVF (cfm) GARAGE 587 0 0 0 0 MECH 52 0 0 0 0 (Unconditioned) 640 0 0 0 0 Other equip loads 0 0 Equip. @ 1.00 RSM 0 Latent cooling 0 TOTALS 640 ` 0 0 ' 0 1 0 Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2025-Od-21 14:03:16 Tit V Right-Suite(g) Universal 2025 25.0.01 RSU56562 Paget J:11••�I rGP� ..25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJB Front Doorfaces: N r htsDft Load Short Form Job: 25-362 AHU1 Date: Oct 21, 2025 r Project Informadan, For: Lawler Ranch Design Htg Clg Infiltration Outside db (°F) -2 95 Method Simplified Inside db (°F) 70 75 Construction quality Average Design TD (°F) 72 20 Fireplaces 0 Daily range - H Inside humidity (%) 50 50 Moisture difference (gr/lb) 66 -45 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFUE 0 Btuh 0 Btuh 0 °F 1930 cfm 0.037 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER 0 Btuh 0 Btuh 0 Btuh 1930 cfm 0.061 cfm/Btuh 0 in H2O 1.00 ROOM NAME Area (ft2) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (cfm) MUD 87 1801 1127 67 69 LAUNDRY 93 1195 1101 44 67 E. HALL 45 166 58 6 4 PANTRY 34 537 96 20 6 KITCHEN 335 8762 5017 325 305 GREAT ROOM 376 7052 5107 261 311 ENTRY 81 2432 889 90 54 PWDR 37 1097 260 41 16 W. HALL 68 1287 468 48 28 OFFICE 70 1735 2587 64 157 PRIMARY BED 310 7817 5250 290 319 PRIME BATH 172 3164 1984 117 121 WIC 114 859 206 32 13 I1Grl9 074 CAAA - Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. !�t Wrigh"c4t 2025-Oct-2114:03:16 /II.�-Lawler Right-Suite® Universal 2025 25 0.01 RSU56562 Page .25-362 - Lawler Ranch -Manual J - REVISION.rup Calc = MJB Front Door faces: N BATH 2 1 70 1717 949 64 58 BED 3 232 4735 2662 175 162 BATH 3 72 1739 940 64 57 AHU1 2469 52088 31726 1930 1930 Other equip loads 0 0 Equip. @ 1.00 RSM 31822 Latent cooling 0 TOTALS 1 2469 1 52088 ' 31822 ' 1930 ' 1930 Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2025-Oct-21 14:03:16 !�1 Rig ht-Suite®Universa12025 25 0.01 RSU56562 Page4 ...25-362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJB Front Doorfaces: N �ICh�>D Building Analysis Job: 25-362 Y Date: Oct 21, 2025 Entire House By: MT Project I'.nfo�rrr��a��io;r> For: Lawler Ranch Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (°F) 70 75 Elevation: 6913 ft Design TD (°F) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (°F) -2 95 Infiltration: Daily range (°F) - 35 (H ) Method Simplified V\Ietbulb (°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 - s Component Btuh/it2 Btuh % of load Walls 2.8 9716 18.7 Glazing 19.8 17520 33.6 Doors 1.2 216 0.4 Ceilings 1.4 4491 8.6 Floors 1.1 3308 6.4 Infiltration 2.0 8861 17.0 Ducts 7976 15.3 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 52088 100.0 COMDonent Btuh/02 Btuh % of load Walls 0.4 1359 4.3 Glazing 18.8 16692 52.6 Doors 0.2 36 0.1 Ceilings 0.7 2059 6.5 Floors 0.3 933 2.9 Infiltration 0.3 1249 3.9 Ducts 3179 10.0 Ventilation 0 0 Internal gains 6220 19.6 Blower 0 0 Adjustments 0 Total 31726 100.0 Latent Cooling Load = 0 Btuh Overall U-value = 0.061 Btuh/ft2--°F, Window / Floor Area = 28.5 % WARNING: window to floor area ratio = 28.5% - more than 25%. VAIs Cuss oaang Ga3rg Bold/italic values have been manually overridden Qhff Cal i ngs fllydinn .� yy' isoatacft- 2025-Oct-21 14:03:16 - Right -Suite® Universal 2025 25.0.01 RSU56562 Page l 25-362 -Lawler Ranch -Manual J - REVISION.rup Calc = MJB Front Door faces: N Building Analysis Job: 25-352 wright�s© Bate: Oct 21, 2025 (Unconditioned) - - - - - = , e..-ct tni fo,rmi ation - - For: Lawler Ranch DasijlalmaD • n • Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (°F) 70 72 75 20 Elevation: 6913 ft Latitude: 40°N Design TD (°F) Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (°F) -2 95 Infiltration: Daily range (°F) - 35 ( H ) Method Simplified Nkt bulb (° F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Component Btuh/F Btuh % of load Walls 0 0 0 Glazing 0 0 0 Doors 0 0 0 Ceilings 0 0 0 Floors 0 0 0 Infiltration 0 0 0 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 0 0 Component Btuh/02 Btuh % of load Walls 0 0 0 Glazing 0 0 0 Doors 0 0 0 Ceilings 0 0 0 Floors 0 0 0 Infiltration 0 0 0 Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 0 0 Latent Cooling Load = 0 Btuh Overall U-value = 0.060 Btuh/ft22F, Window / Floor Area = 2.6 % WARNING: window to floor area ratio = 2.6% - less than 5%. Bold/italic values have been manually overridden w�iq�atsolt 2025-0ct-21 14:03:16 t• — Right -Suite® U niversal 2025 25.0.01 RSU56562 Page 2 WiCk ..25-362 -Lawler Ranch -Manual J - REVISION.rup Calc = MJ8 Front Door faces: N Building Analysis Job: 25-362 �wrightsof AHU1 g y Date: Oct 21, 2025By: MT I Project Information For: Lawler Ranch Design u. e r Location: Indoor: Heating Cooling Garfield Co Rgnl, CO, US Indoor temperature (°F) 70 75 Elevation: 6913 ft Design TD (°F) 72 20 Latitude: 40°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 65.9 -45.2 Dry bulb (°F) -2 95 Infiltration: Dailyrange (°F) - 35 (H ) Method Simplified Wetbulb (°F) - 59 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Component Btuh/ftz Btuh % of load Walls 3.5 9716 18.7 Glazing 20.2 17520 33.6 Doors 9.0 216 0.4 Ceilings 1.8 4491 8.6 Floors 1.3 3308 6.4 Infiltration 2.6 8861 17.0 Ducts 7976 15.3 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 52088 100.0 Cooling Component Btuh/ft2 Btuh % of load Walls 0.5 1359 4.3 Glazing 19.2 16692 52.6 Doors 1.5 36 0.1 Ceilings 0.8 2059 6.5 Floors 0.4 933 2.9 Infiltration 0.4 1249 3.9 Ducts 3179 10.0 Ventilation 0 0 Internal gains 6220 19.6 Blower 0 0 Adjustments 0 Total 31726 100.0 Latent Cooling Load = 0 Btuh Overall U-value = 0.061 Btuh/ftz-'F, Window/ Floor Area = 35.2 % WARNING: window to floor area ratio = 35.2% - more than 25%. VON Clz�s f.1r m ll lJ vtHls Irh7rd Girs i L7� '� IrfilhAm RM l I Ol irgs Bold/italic values have been manually overridden d- 2025-Oct-21 14:03:16 Right -Suite® Universal 2025 25.0 01 RSU56562 Page 3 /� • 25362 - Lawler Ranch - Manual J - REVISION.rup Calc = MJB Front Door faces: N