HomeMy WebLinkAboutApplicationE(4. Garfield County
Community Development Department
108 81h Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfieldcountyco.gov
OF GRADING
10 MINOR
INVOLVED PARTIES
Property Owner: Lessee: vantage Aviation, Ryan Maxfield Phone:( 317) 514 0280
Mailing Address: 4 Star Point, Ste 204, Stanford, CT 06902
Email Address: rmaxfieid@vantageair.com
Contractor: VJS/HASELDEN, VANTAGE AVIATION, a JOINT VENTURE —Phone:( 7 2 01450 6473
Mailing Address: 6950 S. Potomac, Centennial, CO 80112
Email Address: DaveLeopold@haselden . com
Architect: Hauser Architects, Curtis Koldeway
Phone:( 970) 669 8220
Mailing Address: 3780 East 15th Street, Suite 201 Loveland, CO 80538
Email Address: curtis@hauserarchitectspc.com
Eneineer• SGM INC, Jeff Simonson
Mailing Address: 118 W 6th St #200.
Email Address: jells@sgm-inc.com
PROJECT NAME AND LOCATION
Project Name:
Vantage Aviation RIL
Date of Completion: 12 / 2 3/ 2 0 2 6
Phone: ( 9701384 9005
Glenwood Springs, CO 81601
Description of Work: Installation of an access road to parcels A2 & A5/6
on the Rifle Airport.
Job Address: 375 Co Rd 352, Rifle, CO 81650
Assessor's Parcel Number:
Sub.
217713400205 & 217724300398
Lot
Block
Earthwork (square feet): 62 , 8 0 0 SF Earthwork (Cubic Yards): 4 7 0 0 cy
ALL UTILITIES MUST BE LOCATED PRIOR TO ANY GRADING
NOTICE
Author ity. This application for a Building Permit must be signed by the Owner of the property, described above, or
an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the
Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or
a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of
the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
�CERTIFICATION _ _ _
I hereby certify that I have read this Application, and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the
Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply
with provisions of any federal, state, or local law regulating the work and the Garfield County Building Code, OWTS
regulations and applicable land use regulations (County Regulation(s)). All County development requiring a permit,
except for residential uses, are subject to Article 7 of the Land Use and Development Code. I acknowledge that the
Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of
the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other
applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction
or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Division do not
constitute an acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the
Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations
rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or
builder. - -- --- -
I hereby acknowledge that I have read and understand the Notice and Certification above as well as
have pra�the re
qui"d information which is correct and accurate to the best of my knowledge_
Owner Print and Sign
OFFICIAL USE ONLY
Special Conditions: �{Ca�FR�+.sS of:7
Permit Fee. co
i
Balance due:
9 -
Date
Total Fees:
1 _Jr-r) Go
Grading Permit: T Issue Date:
.qL10,6D
BUILDING / PLANNING DIVISION: —
Signed Ypproval
Fees Paid:
Zoning:
10 2Z - ZS
Date