HomeMy WebLinkAboutRevised OWTS Design Plan
Onsite Wastewater Treatment System Design
Revised: October 20, 2025
Original: June 19, 2024
Revised: October 17, 2024
Slafkes Project
1887 County Road 237
Silt, CO 81652
Parcel No. 2127-252-00-013
Prepared By:
K-Cronk Engineering, Inc.
P.O. Box 140
Mack, CO 81525
970-250-0572
- 1 -
Site History
There is an existing four-bedroom residence on the site that is served by an existing onsite wastewater
treatment system (OWTS) that will be abandoned. The owner of the property wishes to install a new OWTS
that is designed to accommodate both the existing residence and a two-bedroom accessory dwelling unit
(A.D.U.)
The site consists of approximately 3.5 acres of uncultivated native soil. Drainage is approximately 3% to
the south. A soils evaluation and site study were conducted on the property of reference on 05/29/24 by
Kachayla R. Cronka. The soils evaluation trench was located approximately 225’ north of the south property
line and approximately 145’ west of the east property line.
On 09/22/25, the design engineer was called out to do a partial inspection of the OWTS. During the
inspection, it was determined that the homeowner, who also did the installation, had installed a lift station
inside the building envelope of the A.D.U. and approximately ~150 feet of pressure main that discharges
into a line prior to the proposed septic tank. These components have been backfilled. The lift station
components and pressure main do not meet the design prepared by this office on October 17, 2024,
and this office did not conduct any inspections of the components while exposed, therefore this
portion of the OWTS has been removed from the scope of this design.
The pushout observed during the partial inspection mentioned above encompassed a footprint of
approximately 40’ wide by 60’ long, at a depth that varied significantly from approximately 24” to 84”
across the width. Six rows of 13 Quick4 Infiltrator chambers were installed with 4-6’ separating each row,
however, all the native soil was removed between which does not conform with the definition of a trench
system. As a result, this OWTS design has been revised from a pressurized trench system to a pressurized
bed system. It should be noted that the components have been exposed for a period of time to the natural
elements, as well as UV light, which has the potential of compromising the structural integrity of them.
This OWTS design has been prepared for the project based on information disclosed during the site study
and partial inspection mentioned above. A discussion of the engineered OWTS design follows. The location
of the soils evaluation trench is shown on the Plot Plan included in this report.
Development of Design Parameters
The soils evaluation trench was extended to a depth of 96" below ground surface (BGS). There was no
ground water or evidence of high seasonal water table to a depth of 96” BGS. The soils evaluation indicates
one distinct soil horizon underlies the site. A lithological description follows:
depth (in.) description
0” – 96” sandy loam, light brown
(Soil Type 2A, USDA – sandy loam, granular, moderate to weak structure)
Based on the results from the 05/29/24 soils evaluation and 09/22/25 partial inspection, Soil Type 2A and
corresponding long term acceptance rate (LTAR) of 0.50 is chosen for overall system sizing for a
pressurized infiltrator bed soil treatment area design to discharge to subsoils below the 24” depth.
a Kachayla R. Cronk holds a Certificate of Attendance and Examination from the CPOW Visual and Tactile
Evaluation of Soils Training.
- 2 -
System Design
A pressurized chamber bed soil treatment system is proposed for discharge of septic effluent at the site.
Construction of the system will consist of excavating a level bed in the area comprising the soil treatment
area. Grading during construction may affect slope, therefore contractor shall verify slope at time of
installation. Soil treatment area orientation may be adjusted per site variations to facilitate consistent
trench depth running parallel to final contours. The initial excavation shall be continued to a level depth
of 24" BGS (see Soil Treatment Area Cross Section). If consistent trench depth cannot be maintained,
INFILTRATOR chambers may be installed level at 24” minimum and 48” maximum BGS.
Septic effluent will be introduced into the soil treatment area through pressurized distribution laterals
installed within chambers as shown in the included graphics. The orifices in the distribution laterals will be
drilled at 12:00 o’clock to direct effluent up for dispersal against the top of the chamber. Additional holes
will be drilled at the beginning and terminal ends of each laterals facing 06:00 o’clock to allow for effluent
to drain out of the laterals and prevent freezing. Orifice shields must be installed at these holes to prevent
the pressurized effluent from compromising the infiltrative surface of the STA.
The distribution laterals will be suspended from the top of the chamber with all-weather plastic pipe
strapping (min. 120 lbs tensile strength) at every chamber joint connection. Septic effluent will be
transferred from the pump chamber to a manifold and then the laterals via a pressure transport main. All
pressurized lines will be constructed of min. SCHD 40 PVC. Any non-draining pressure line will be
installed 36” or more below ground surface to prevent freezing.
The pressurized distribution system will in installed in accordance with the manufacturer’s specifications,
available here for Infiltrator Quick4 Standard Chambers:
https://www.infiltratorwater.com/Customer-Content/www/CMS/files/chamber-manuals/Q04.pdf.
After the pressurized distribution system is installed, non-woven geotextile filter fabric will be placed over
the chambers and the system will be covered with a soil cap. The soil cap will consist of approximately
12” min. of sandy loam. The soil cap will be mounded 5% above the existing ground surface to promote
surface run off away from the soil treatment area.
A 1,500 gallon, single compartment primary septic tank is required to provide a minimum of 48 hours
retention time for sewage generated from the proposed project. A 1000-gallon, single compartment septic
tank will be placed down-gradient of the primary tank. The tanks must be approved and accepted by CDPHE
for use as a septic tank. A list of such tanks may be found here: https://cdphe.colorado.gov/OWTS under
“Regulation 43: product acceptance lists”. Provide water-tight risers to surface with securely fitted lids for
access to all compartments of the septic tank. A a non-corrodible Orenco filter (Model FTW0436-28) shall
be installed at the final outlet tee of the primary septic tank to limit the size of solids and sludge passing
into the second septic tank.
- 3 -
DESIGN CALCULATIONS
DESIGN LOADING RATE OF 3 BEDROOMS @ 150 GAL./BEDROOM-DAY = 450 gal./day
PLUS 4TH BEDROOM @ 75 GAL./BEDROOM-DAY – 525 GAL./DAY
PLUS 2 BEDROOM A.D.U. @ 150 GAL./BEDROOM-DAY = 825 GAL./DAY
DESIGN SOIL TYPE = 2A
DESIGN LONG TERM ACCEPTANCE RATE (LTAR) = 0.50 GAL./SQ.FT./DAY
A = 𝑄
𝐿𝑇𝐴𝑄, WHERE,
A = SOIL TREATMENT AREA (SQ. FT.)
Q= DESIGN FLOW (GAL./DAY)
LTAR = LONG TERM ACCEPTANCE RATE (GAL./SQ.FT./DAY)
A = 825
0.50 = 1650 𝑆𝑄.𝐹𝑆.
SOIL TREATMENT AREA ADJUSTMENT FACTOR FOR PRESSURE BED DESIGN = 1.0
SOIL TREATMENT AREA ADJUSTMENT FACTOR FOR USE OF CHAMBERS = 0.7
ADJUSTED SOIL TREATMENT AREA = 1650 SQ.FT. X 1.0 X 0.7 = 1155 SQ. FT.
LENGTH OF 12’ WIDE BED REQ’D = 1155 SQ.FT. / 12 FT. = 96.25 FT.
USE TWO BEDS WITH 4 ROWS OF 13 QUICK4 STANDARD INFILTRATORS (or equivalent) EACH,
FOR A TOTAL OF 104 UNITS
SOIL TREATMENT AREA SIZED AT 2 BEDS X 12 FT. WIDE X 52 FT LONG = 1,248 SQ. FT.
As shown in the included graphics, the bed soil treatment system will consist of two (2) bed 12' wide
x 24” deep x 52' long with four (4) rows of thirteen (15) INFILTRATOR QUICK4 chambers (or
equivalent) each for a total of one-hundred and four (104) units. The soil treatment area will
encompass an area of 1,248 sq. ft.
- 4 -
Installation - Setbacks, Notifications, and Inspections
The owner and installer shall be aware of and comply with the following installation and system operation
requirements.
• The installer must be approved and licensed by Garfield County for the installation of onsite
wastewater treatment systems.
• All installation activities shall be conducted in accordance with current Garfield County OWTS
Regulations. If at any time during construction, subsurface site conditions are encountered
which differ from the design parameters previously described, construction activities will stop,
and the design engineer and Garfield County will be contacted to address any necessary design
modifications.
• The final cover shall not be placed on sewer lines, septic tank, or the soil treatment area until
the system has been inspected and approved by the design engineer and Garfield County. The
installer shall provide 48-hour notice for all required inspections.
• Installation procedures including grade, location, setbacks, septic tank size, and soil treatment
size shall conform with the attached graphic details. Construction activities and system
components will not encroach upon existing easements or utility corridors. A minimum of 5
feet of undisturbed soil shall be maintained between individual absorption elements and the
septic tank. A minimum of 4 feet of undisturbed soil shall be maintained between adjacent
absorption elements.
• The installer must maintain all setbacks to utility lines, easements, property lines, or other
adverse conditions, whether they are known and shown on the attached graphics or have been
disclosed during construction. Vehicle traffic and parking is to be prevented over the soil
treatment and repair area. Minimum setbacks for system components are:
Septic Tank,
Dosing Tank
Building Sewer,
Effluent Lines
STA
spring/well/cistern 50 50 100
potable water supply line 10 5 25
structure w/ crawlspace 5 0 20
structure w/o crawlspace 5 0 10
property lines, piped or
lined irrigation
10 10 10
subsurface drain,
intermittent irrigation
10 10 25
lake, water course,
irrigation ditch, stream
50 50 50
cut slope steeper than
3H:1V
10 10 25
septic tank -- -- 5
• Four-inch, 2-way clean out must be installed within 5 ft of the outside of the building.
• Gravity sewer lines that transport solid waste material must maintain a minimum fall of 1/4”
per foot (2% slope); gravity effluent lines that transport only liquid waste material must
maintain a minimum of 1/8” per foot (1% slope).
• All gravity sewer/effluent piping shall meet minimum ASTM-3034 PVC standard, be 4-inch
in diameter, and have glued joints. Gravity sewer lines that transport solid waste material shall
employ sweep 90's or 2-45's at all turns. Sewer/effluent lines under driveways shall meet
- 5 -
minimum SCHD 40 PVC standards. Additionally, sewer/effluent lines in traffic areas with less
than 24" of cover shall be encased in 6" CMP or flow fill and covered with minimum 2" high
density blue board insulation.
• Sewer/effluent lines or domestic water lines shall be encased in minimum SCHD 40 with water-
tight end caps or a minimum of 6” of flow fill at all points with less than 5’ separation between
sewer and domestic water lines.
• Four-inch clean outs shall be installed at maximum 100' intervals in all gravity sewer lines that
transport solid waste material that exceeds 100' in length.
• A minimum of 12" of soil cover (18" recommended) shall be maintained over all gravity
draining OWTS components to prevent freezing of septic effluent (excepting septic tank access
ports which must be extended to the ground surface).
• A minimum of 36” of soil cover shall be maintained over all non-draining pressure effluent
line.
• Electrical wiring shall be continuous cable with all connections made in a weatherproof box.
Limit switching shall consist of: 1) low level/pump off, 2) high level/pump on, and 3) high
level alarm/system failure. The high-level alarm shall be both audible and visual and shall be
easily detectable by occupants. Emergency notification information (e.g., telephone numbers
of owner, Garfield County, service personnel) shall be posted near the high-level alarm.
• All access manholes on septic tanks and dosing chambers will be child proof and contain
appropriate warning labels if accessible to the public. Confined space entry precautions should
be observed by maintenance personnel.
• The system contractor shall be aware of the potential for construction activities to reduce soil
permeabilities at the site through compaction, smearing, and shearing. The following
precautions and construction procedures should be employed during installation to minimize
disturbance to native soils:
i. Excavation should proceed only when the moisture content of the soil is below the
plastic limit. If a sample of soil forms a rope instead of crumbling when rolled
between the hands it is too wet and should be allowed to dry before excavation
continues.
ii. Excavation and backfill equipment should work from the surface where at all
practical to avoid compaction of the soils at depth.
iii. The bottom and sidewalls of the excavation should be left with a rough, open
surface. The appearance should be that of broken or ripped soil as opposed to a
sheared, smeared, or troweled surface. Any smoothed or smeared surfaces should
be removed with a toothed rake or shallow ripper taking care to remove loose
residues from the bottom of the excavation by hand if necessary.
iv. Care should be taken in placing fill materials in the excavation to avoid damaging
the exposed soil surfaces.
- 6 -
Operation - Maintenance and Inspections
• The owner shall install a structural barrier if necessary and take precautions to prevent vehicular
traffic, excessive surface watering, accidental flooding, or other activities in the vicinity of the
soil treatment area which may compact, saturate, or otherwise alter the subsurface soil
parameters used in designing the septic system.
• The owner will plant and maintain grass or other shallow rooted cover crop to prevent erosion
and promote evapotranspiration over the soil treatment area.
Every month:
• Inspect backfill over the septic tank and soil treatment area for signs of settling – provide
additional mounding as needed.
• Inspect area of septic tank and soil treatment area for signs of intrusion by burrowing animals
and deep rooted plants and take measures to prevent future intrusions as needed.
Every year:
• Remove tank lids and inspect outlet effluent filter in pump vault for damage and clean/replace
as needed.
• Inspect soil treatment area through the ports provided at the beginning and ends of bed for signs
of excessive moisture or pooling water.
• Log pump cycle number or pump run time.
• Inspect pump components.
• Perform squirt test and flush laterals to prevent excess buildup of material within pipe system.
Every four years:
• Remove accumulated sludge from the septic tank by pumping all compartments – interval may
be adjusted to less than four years or more than four years depending on family specific usage
and habits
- 7 -
OWTS Component Descriptions:
Component: Model: Notes:
Septic Tanks Infiltrator IM-1530-1CP + IM-1060-
1CP
Tank Riser Infiltrator EZsnap Riser SNAPIS-24##
& Lid, or equivalent
2”, 6”, & 12” available
Optional Safety Star: SNAPSAFT-
2400 *must be watertight*
Pump Package Orenco BioTube ProPak BPP50DD-
CW-SX-ETMCT
PF500011 pump
PVU57-1819-L vault
S1ETMCT control panel
Effluent Filter Orenco Model FTW0436-28
Pressure Main &
Manifold
2” SCHD 40 PVC
Lateral Size &
Orifice
1” SCHD 40 PVC with 1/8” orifices
spaced 48” o.c.
Orifice Shield Orenco Model OS100
Distribution
Media
Infiltrator Quick4 Standard Chambers +
endcaps, or equivalent
Filter Fabric Non-woven permeable geotextile fabric
(max. 2 oz. / sq. yd), or equivalent
- 8 -
Limitations
This report is a site-specific design for installation of an onsite wastewater treatment system and is
applicable only for the client for whom our work was performed. Use of this report under other
circumstances is not an appropriate application of this document. This report is a product of K-Cronk
Engineering, Inc. and is to be taken in its entirety. Excerpts from this report may be taken out of context
and may not convey the true intent of the report. It is the owner's and owner's agent’s responsibility to read
this report and become familiar with the recommendations and design guidelines contained herein.
The recommendations and design guidelines outlined in this report are based on: 1) the proposed site
development and plot plan as furnished to K-Cronk Engineering, Inc. by the client, and 2) the site conditions
disclosed at the specific time of the site investigation of reference. K-Cronk Engineering, Inc. assumes no
liability for the accuracy or completeness of information furnished by the client. Site conditions are subject
to external environmental effects and may change over time. Use of this plan under different site conditions
is inappropriate. If it becomes apparent that current site conditions vary from those anticipated, the design
engineer and Garfield County should be contacted to develop any required design modifications. K-Cronk
Engineering, Inc. is not responsible and accepts no liability for any variation in assumed design parameters.
K-Cronk Engineering, Inc. represents this report has been prepared within the limits prescribed by the
owner and in accordance with the current accepted practice of professional engineering in the area. No
warranty or representation, either expressed or implied, is included or intended in this report or in any of
our contracts.
SEAL
Kachayla R. Cronk, P.E.
Date
NOTE: This OWTS design is meant to include the following seven pages:
1) plot plan
2) septic layout plan
3) notes for your installer
4) soil treatment area plan view
5) soil treatment area cross section
6) pump vault detail
7) pump curve
The plan is not to be implemented in the absence of these sheets.
NOTES FOR YOUR INSTALLER
This is a STAMPED, ENGINEERED design – yes, septics are “simple” and water runs downhill.
However, like anything that is engineered, it is critical that you follow the design so the system
performs as intended – I cannot approve a system that was not installed to plans!
If, FOR ANY REASON, you need to:
1. Change the location/rotation of the septic tank (i.e. plumbing was stubbed out of
different wall, etc.)
2. Change the location/rotation of the soil treatment area (i.e. slope differed from the
design, owner has changed the site plan, etc.)
YOU MUST CONTACT THIS OFFICE FOR A REVISED DESIGN!
The revision must be submitted and approved through the County (with a County $ revision
fee) prior to calling in for inspection. Revisions take time, so please be prompt when
contacting us to ensure the project is not delayed.
Next, and I cannot stress this enough - DO NOT install the chambers DEEPER than the maximum
depth stated in the design – the depth is determined by factors that the design engineer cannot
control. This includes SATURATED/POOR SOIL CONDITIONS & COUNTY OWTS
CODE. Our designs give the widest range of depth possible for the specific site – if the required
depth cannot be met, other options may need to be explored.
If the soil treatment area is installed at a depth greater than allowed, there are very few solutions
to resolve the problem. Examples include:
• Removing all components and reinstalling them in a different location at correct depth.
• Backfilling trenches to an acceptable depth (using WASHED CONCRETE SAND
ONLY), installing a pump chamber, effluent pump, and pressurizing the system.
Please reach out at any time during the installation process if you have any questions – this office
has experienced several installations that have failed County inspections due to issues described
above – I would like to see every system PASS without comment as this makes everyone’s job
easier.
Kachayla Cronk, P.E. – (970) 250-0572
Effluent Pumping System for Cold Weather Applications (cw style)
Model PVU57-1819-L
Discharge Assembly
Level Control
Float Assembly
Orenco Effluent Pump
Biotube Pump Vault
Scale: 1" = 2'Model S1ETMCT
Control Panel
Lid Riser(s)
Tank Lid , Typ.
Tank Shield (opt.)Conduit Seal
PVC Splice Box w/Cord Grips
Top View (NTS)
Simplex Pumping System
1000-gallon pump chamber
BPP50DD-CW-SX-ETMCT
Pump Selection for a Pressurized System - Single Family Residence Project
SLAFKES 1887 CR 237
Parameters
Discharge Assembly Size
Transport Length
Transport Pipe Class
Transport Line Size
Distributing Valve Model
Max Elevation Lift
Manifold Length
Manifold Pipe Class
Manifold Pipe Size
Number of Laterals per Cell
Lateral Length
Lateral Pipe Class
Lateral Pipe Size
Orifice Size
Orifice Spacing
Residual Head
Flow Meter
'Add-on' Friction Losses
2.00
50
40
2.00
None
10
27
40
2.00
8
50
40
1.00
1/8
4
5
None
0
inches
feet
inches
feet
feet
inches
feet
inches
inches
feet
feet
inches
feet
Calculations
Minimum Flow Rate per Orifice
Number of Orifices per Zone
Total Flow Rate per Zone
Number of Laterals per Zone
% Flow Differential 1st/Last Orifice
Transport Velocity
0.43
104
45.4
8
3.1
4.4
gpm
gpm
%
fps
Frictional Head Losses
Loss through Discharge
Loss in Transport
Loss through Valve
Loss in Manifold
Loss in Laterals
Loss through Flowmeter
'Add-on' Friction Losses
4.1
1.7
0.0
0.3
0.4
0.0
0.0
feet
feet
feet
feet
feet
feet
feet
Pipe Volumes
Vol of Transport Line
Vol of Manifold
Vol of Laterals per Zone
Total Volume
8.7
4.7
17.9
31.4
gals
gals
gals
gals
Minimum Pump Requirements
Design Flow Rate
Total Dynamic Head
45.4
21.4
gpm
feet
0 10 20 30 40 50 60 70 800
20
40
60
80
100
120
140
160
Net Discharge (gpm)
PumpData
PF5005 High Head Effluent Pump
50 GPM, 1/2HP
115/230V 1Ø 60Hz, 200/230V 3Ø 60Hz
Legend
System Curve:
Pump Curve:
Pump Optimal Range:
Operating Point:
Design Point: