Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-08-25-9412 EDMUNDO CASTILLO 1,200 SQ FT UNHEATED, PRIVATE USE STORAGE GARAGE SHOP (NO PLUMBING, WATER SUPPLY OR HEATING PROPOSED) 1863 Six Lazy K, New Castle S241 T06, R92 - 217924200275 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2018 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. _� 3) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH —IN APPROVAL IS REQUIRED AT FRAME INSPECTION. LZ ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. SN 4) ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REQUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE SEE GARFIELD COUNTY dftft COMMUNITY DEVELOPMENT WEBSITE FOR FURTHER INFORMATION. 6) OPEN HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION 2,500 PSF SOIL BEARING CAPACITY. 7) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. PROVIDE APPROVAL REPORT AT FRAMING INSPECTION. 8) THE BUILDING STRUCTURE HAS BEEN REVIEWED AS A PRIVATE USE DETACHED GARAGE SHOP ONLY ACCESSORY TO THE FUTURE ADU. ANY FUTURE CHANGE IN BUILDING OCCUPANCY OR USE, WILL FIRST BE SUBJECT TO ANEW BUILDING PERMIT APPLICATION AND REVIEW FOR COMPLIANCE WITH ZONING REGULATIONS, LAND USE & BUILDING CODES IN EFFECT AT TIME OF FUTURE WORK. INSTALL STORMWATER CONTROLS PRIOR TO ANY DIRT WORK. LOCATE ALL UTILITIES PRIOR TO ANY WORK. 811 IS THE STATE UTILITY LOCATE NUMBER CONTROL NOXIOUS WEEDS. TREAT EXISTING WEEDS PRIOR TO RELOCATING PLANTS AND SEEDS. REVEGITATE ALL DISTURBED AREAS THAT ARE NOT PART OF A ROAD OR NON -SEEDED AREA. PROVIDE EROSION CONTROLS UNTIL SEEDED AREAS CAN BE ESTABLISHED. PROVIDE DUST CONTROL AS REQUIRED DURING CONSTRUCTION. MAINTAIN ALL DRAINAGE ON THE SUBJECT PROPERTY, DRAINAGE SHALL NOT ENTER NEIGHBORING PROPERTIES OTHER THAN HISTORIC DRAINAGE. FOLLOW ENGINEERED PLANS. VERIFY ANY CHANGES WITH THE ENGINEER.