HomeMy WebLinkAboutSubsoils Report for Foundation DesignGEOTECHNICAL INVESTIGATION REPORT Pre-fab Metal Building 1863 Six Lazy K Road New Castle, Colorado 81647 Geo Quest Project No.: 25-120 May 28, 2025 Prepared for: Edmundo Castillo 2400 Bob O Link Lane Glenwood Springs, CO 81601 Mund74@gmail.com 970-309-3884 (970) 318-6784 EGeot�edtmical Quest PO Box 1372 Engineering - Testing Rifle, CO 81650 geoquestco@pm.me .` N Table of Contents 1 Purpose and Scope of Study................................................................................................... 1 2 Proposed Construction........................................................................................................... 1 3 Site Conditions........................................................................................................................ 1 4 Field Investigation................................................................................................................... 2 5 Subsurface Conditions............................................................................................................ 2 5.1 Laboratory Test Results................................................................................................................4 6 Earthwork................................................................................................................................4 7 Recommendations.................................................................................................................. 5 7.1 Foundations.................................................................................................................................5 7.2 Concrete Slab on Grade.............................................................................................................6 7.3 Drainage Considerations............................................................................................................ 6 8 Limitations.... _ - _ . .................................................................................................................... 6 Figures Figure 1 - Project and Approximate Test Pit Location Map..... Figure 2 — Field Investigation, View Looking Northeast......--.. Figure 3 — Soil Layers ................... . . ............... Tables ............................................................ 2 ............................................................ 3 ............................................................ 3 Table 1—Test Pit 1 Laboratory Test Results and Relative Density.................................................................4 Table2 —Compaction Criteria .. ... ................................................................................................................... 5 (970) 318-6784 EGeot�echtnical Quest PO Box 1372 Engineering - Testing Rifle, CO 81650 geoquestco@pm.me Soil Report -Prefab Metal Building Geo Quest No. 25-120 1863 Six Lazy K Rd, New Castle, CO 5/28/25 1 Purpose and Scope of Study This report presents the results of our geotechnical investigation for the planned construction of a pre- fabricated metal building south of New Castle, Colorado. The purposes of this investigation were to evaluate the subsurface conditions at the site and to develop geotechnical recommendations to assist in design and construction. This report is not a foundation design and cannot be used as such. The type, thickness, reinforcing and other aspects of foundation elements should be designed by a structural engineer. Our scope of services included the following: • Using excavated test pits, observe the subsurface conditions and collect soil samples to identify and assess the material layers at the proposed building site. • Recommend foundation type(s) and estimated foundation movement. • Discuss earthwork, including recommendations for fill placement and compaction, suitability of the site soil for reuse as engineered fill, and subgrade preparation. 2 Proposed Construction The project proposes the construction of a light weight, pre -fabricated metal building with a concrete slab on grade floor. Geo Quest (GQ) understands the building to be non -living space and used for parking and storage. The location of the project site is presented in Figure 1, Project and Approximate Test Pit Location Map. If the proposed construction details change from those above, GQ should be contacted for review and re-evaluation of the recommendations in this report. 3 Site Conditions The property is located approximately 7.5 miles south/southeast of the town of Silt on a 19-acre parcel and accessed by Garfield County Road 311 also known as Divide Creek Road and then Six Lazy K Road. The property consists of rolling hills with sparse grasses and cedar trees. Sandstone outcroppings are visible at some locations on the property. An existing cabin is on the property to the north of the proposed building location which is the focus of this report. 1 Soil Report -Prefab Metal Building Geo Quest No. 25-120 1863 Six Lazy K Rd, New Castle, CO 5/28/25 Figure 1- Project and Approximate Test Pit Location Map 4 Field Investigation On May 12, 2025, GQ was at the property and one test pit was excavated to a depth of 7.0 feet below the ground surface using a Caterpillar 305.5 excavator. The site and approximate test pit location are presented in Figure 1 and Figure 2. Bulk samples of the subsurface materials were obtained from the test pit at select depths for testing and identification of each material layer. The excavation was backfilled with the excavated soil when completed. 5 Subsurface Conditions The test pit encountered approximately 10 inches of topsoil over 1 foot of medium dense clayey sand above 3 feet of very stiff to hard sandy clay over weathered sandstone bedrock to the bottom of excavation. The soil was dry to moist, brown/tan and had white calcareous streaking throughout the clay layer. Sulfates are likely present and sulfate resistant concrete should be used in foundations. Figure 3 presents photos of the soil layers in the excavation when sampling at a depth of about 3 feet below ground surface. 2 Soil Report -Prefab Metal Building 1863 Six Lazy K Rd, New Castle, CO Geo Quest No. 25-120 5/28/25 Ground water was not encountered in the test pit to the depth explored. Variations in groundwater conditions may occur seasonally. The magnitude of the variation will be largely dependent upon the amount of spring snowmelt, duration and intensity of precipitation, site grading changes, and the surface and subsurface drainage characteristics of the surrounding area. Perched water tables may be present but were not encountered in the test pit. Figure 2 — Field Investigation, View Looking Northeast t y Clayey Sand bye �1 AL Figure 3 — Soil Layers 3 Soil Report -Prefab Metal Building Geo Quest No. 25-120 1863 Six Lazy K Rd, New Castle, CO 5/28/25 5.1 Laboratory Test Results Collected soil samples were classified by the geotechnical engineer in accordance with the Unified Soil Classification System (USCS) as described in ASTM D-2488 and ASTM D-2487. Laboratory tests were then performed on select samples to evaluate the pertinent engineering properties of the soil. The laboratory testing was conducted in general accordance with the American Society for Testing and Materials (ASTM) test procedures. The following laboratory tests were performed for this evaluation and presented in Table 1: • In -Situ Moisture Content ASTM D-2216 • Soil Particle Analysis ASTM D-422 • Plastic and Liquid Limits ASTM D-4318 Table 1— Test Pit 1 Laboratory Test Results and Relative Density Sand Percent Finer Liquid Limit/Plasticity Index Relative Depth In -Situ Moisture Than 200 Sieve (LL/PI) * (ft) N N N Density I%) 3.5 1 7.1 1 46 1 54 7 6.8 1 63 37 *Values estimated based on driving sample tube 6 Earthwork 25 LL Very Stiff to 10 PI Hard 32 LL Dense to Very 15 PI Dense Geo Quest anticipates that fill placement, outside of foundation excavation areas, will be minor. Areas to receive fill should be stripped of vegetation, organic soils and debris. The on -site soils encountered in the test pit may be used for fill throughout the project site. All fill should be free of organic matter, debris and rocks larger than 3 inches. If weak, saturated and unsuitable soils are encountered at subgrade elevations the material should be removed and replaced with imported granular material, to provide a suitable platform for construction. The subgrade should be proofrolled before placement of fill, concrete or foundation elements to check for weak areas that need improvement. This may be accomplished with a loaded truck, backhoe, front end loader or other heavy rubber -tired vehicle making multiple passes across the subgrade surface. Soil rutting, pumping or movement that is greater than 0.75 inches needs to be addressed and improved through compaction or the removal of soil to an appropriate depth and replacement with dryer soil or gravel. GQ should be contacted if problems persist. If fill is used below the structure it should be placed in loose lifts of 8 inches thick or less, moisture conditioned and compacted to at least 95 percent of the maximum proctor dry density as shown in Table 2. Placement and compaction should be observed and tested by the geotechnical engineer. 4 Soil Report -Prefab Metal Building Geo Quest No. 25-120 1863 Six Lazy K Rd, New Castle, CO 5/28/25 Table 2 — Compaction Criteria fPercent Compaction Moisture Content I 95% minimum Standard (ASTM D698) ± 2 % of optimum 1 Care should be used when compacting soil next to foundation walls, utilities or other sensitive areas to prevent damage. If utility trenches are backfilled with granular soil, a clay plug of adequate thickness should be placed in the trench adjacent to the building to reduce the potential for water flowing through the trench back under the structure. Placement and compaction of fill should be observed and tested by a representative of the geotechnical engineer. 7 Recommendations 7.1 Foundations A stable foundation and proper structure anchorage is critical to the design life of the lightweight, prefabricated metal building. Primary foundation types for these structures include concrete pier or post in the ground foundations and anchorage to a slab on grade. The prefabricated metal building manufacturers' design recommendations should be followed. Post in the ground foundations may consist of small concrete piers that are excavated by hand or drilled with a powered auger. Alternatively, the vertical building supports may extend to the bottom of the excavations where the void space is then filled with concrete. The following design and construction details should be observed for post in the ground construction: 1. Borings and excavations should be drained of water before placement of concrete. 2. Concrete with a minimum 28-day compressive strength of 3,500 pounds per square inch should be used. Concrete should be properly vibrated, consolidated and distributed to eliminate voids and seal the boring/excavation from surface water. 3. Concrete should be a fluid mixture that is appropriate to fill potentially small voids between foundation elements and reinforcing. The concrete slump should be within 5 to 8 inches. 4. Sulfate resistant concrete should be used. The exposure category to sulfates should be considered Severe and a Class of S2 should be used when selecting sulfate resistant concrete as discussed in ACI 318-11. 5. The soil at this location is anticipated to adequately hold an open hole for the placement of post and concrete. Cardboard forms such as Sono Tubes should be used if borehole/excavation collapsing is experienced. 6. Piers or posts in the ground should extend to a minimum depth of 3 to 4 feet below the surrounding ground surface for frost protection and structural integrity. 5 Soil Report -Prefab Metal Building Geo Quest No. 25-120 1863 Six Lazy K Rd, New Castle, CO 5/28/25 7. A minimum amount of reinforcing steel should be used in concrete piers that extends the entire length of borehole to resist tension forces. Total foundation movement is estimated to be on the order of one (1) inch or less. Differential movement is anticipated to be on the order of % to % of the estimated total movement. These estimated foundation movements are dependent on proper construction practices, drainage and following the recommendations in this report. Therefore, proper drainage should be provided during construction and throughout the design life. 7.2 Concrete Slab on Grade GQ recommends the concrete slab on grade (SOG) floor be a minimum thickness of 5 inches. Additional slab design and construction recommendations are as follows: • A subgrade modulus value of 150 pounds per cubic inch may be used in SOG design. • Welded wire reinforcing may be used to maintain aggregate interlock when temperature and shrinkage cracks occur. The reinforcing should be placed in the top 1/3 of the slab thickness and extend laterally to within 2 inches of the side edge. • Positive separations and/or isolation joints should be provided between slabs and all piers, columns, or utility lines to allow independent movement. • Control joints should be provided in slabs to control the location and extent of cracking. • Interior utility trench backfill placed beneath slabs should be properly compacted in accordance with Table 2. • Slabs should not be constructed on frozen subgrade. 7.3 Drainage Considerations We recommend the ground surface surrounding the building be sloped to drain away from the structure, SOG and foundation elements with a minimum slope of 10 percent or a drop of 12 inches in the first 10 feet for landscape areas. We recommend a slope of 2 percent away from the structure beyond this. We recommend that roof drain downspouts be used and discharge a minimum of 5 feet away from the structure and beyond all structure backfill zones. These recommendations may require raising the site grade slightly. 8 Limitations The analyses and recommendations presented in this report are based upon our data obtained from the test pit, field observations, soil classifications and our understanding of the proposed construction and other information as discussed in this report. It is possible and likely that subsurface conditions may vary outside of the limits explored. The nature and extent of such variations may not become evident until construction. We should review the report if the scope of the proposed construction, including the proposed loads, finished elevations or structure locations, change from those described in this report, and provide supplemental recommendations as necessary. Soil Report -Prefab Metal Building 1863 Six Lazy K Rd, New Castle, CO Geo Quest No. 25-120 5/28/25 It is important to note that the recommendations herein are intended to reduce the risk of structural movement and/or damage associated with volume change of the subsurface materials. However, GQ cannot predict the long-term changes in subsurface moisture conditions and/or the extent of potential damaging effects. Where significant increases in subsurface moisture occur due to grading changes, utility line break, leaks from any source, excess irrigation or other causes, excessive movement is possible. This report was prepared in substantial accordance with the generally accepted standards of practice for geotechnical engineering as exist in the site area at the time of our investigation. No warranties, express or implied, are intended or made. These recommendations are based on the assumption that GQ will conduct an adequate program of testing and observation to evaluate compliance with our recommendations. Respectfully submitted, o L/" Geo Quest r.57139 ' E. of `rr^ . Kevin E. Dye, P.E. 4��ONAL Founder 7