Loading...
HomeMy WebLinkAboutBlower Door TestAccurate Insulation Permit#: Job Information Builder: �ar�r p K_YLW4 munity: Lot: Address: 262 n G (_p City: State: Zip: S -Z Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method Prescriptive Method- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour at pressure of 0.2-inch w. g. (50 Pascals) in Climate Zones 1 and 2. Performance or ERI Method -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH (50) value, as shown on Form R405-202 (Performance) or R406-2020 (ERI), section labeled as infiltration, subsection ACH50. ACH (50) specified on Form R405-202-Energy Calc (Performance) or R406-2020 (ERI): �N + 3 x60 2,7 41- ? 7 < ACH (50) CFM (50) Building Volume Method for Calculating building volume: o Retrieved from architectural plans PASS o Csoftware calculated Field measured and calculated During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infilitration control measures. 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continous ventilation systems and heat recovery ventilatiors shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the tst, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: Accurate Insulation Phone: 970-296-0041 Signature of Tes r: Date of Test: Z / Printed Name of Tester: Rich Romero License/Certification: 5072554 Issuing Authority: Building Performance Institute