Loading...
HomeMy WebLinkAboutHOA Approval LetterHomeowners Association at Aspen Glen, Inc. September 18th, 2025 Doug & Betty Gilg 10592 Durham Pl. Powell, OH 43065 Re: Summary of Final Review for Lot E21 Dear Doug & Betty, Email: bdgilg@gmail.com The DRC concluded the final review for your proposed project at Lot E21 on 9/17/25. Thank you for having your architectural team available to answer questions. Your project is officially approved by the Aspen Glen DRC. Site Materials Mock-ut) — A materials color mock-up wall must be built on -site within 20 days after the onsite pre -construction meeting. Once the mock-up has been built, please contact Silver Mountain Properties so they can coordinate the final approval of exterior materials. Pre -Construction Meeting - An on -site pre -construction meeting is required before construction may commence. Please contact the DRC Administrator to arrange for these inspections/meetings per the Design Guidelines and for a final site inspection by the DRC. Prior to closing the file and returning the builder's completion deposit, copies of the Certificate of Occupancy must be provided to the DRC. Please keep in mind that a copy of your approved plans will be kept on file for periodic review by the Design Review Committee to ensure compliance with your approved plans. Any anticipated changes from your approved plans must be submitted to, reviewed by, and received approval from the Design Review Committee prior to making any changes. Thank you for working with the DRC on the final review of this project. Please do not hesitate to contact me with any questions or comments. Nick Cova Aspen Glen DRC Administrator Nick@smprop.com (970) 510-5501 80 Bald Eagle Way Carbondale, CO 81623 Tel: (970)-963-3362 www.aspenglenhoa.com