Loading...
HomeMy WebLinkAboutBolt Inspection ReportConklin Welding & Fabrication, INC. 1188 CR 116 Glenwood Springs, CO 81601 C: 231.629.6252 Inspection Report Date of Inspection: 10/1612025 Project Name: CRMS Job Site Address: 1493 CR 106 Permit/Drawing a:8LCO-04-25-9210 Welding Contractor: Roger Grove General Contractor: The Home Group, INC. Inspection Narrative Inspection Report: Visual inspection of four columns that were FCAW shop welded. Inspection included: joint fit up, interpass cleaning, process and consumable verification, welder qualification verification and final visual inspection. All welds are acceptable to AWS D1.1:2020 End of Report Inspector: Eric Conklin CW121052071 QC1 Exp. 51112027 onklin 052071 P..5,: '2027 Page 1 of 1